stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

954 SENECA AVENUE

Queens · ZIP 11385 · BIN 4085902 · Ridgewood · On record since Apr 15, 2015 · Built 1931

NeighborhoodⓘRidgewood
Among the most complained-about buildings in Ridgewood
More complaints than 100% of residential buildings in Ridgewood over the last 10 years. Size-normalized by building volume.
100th pct
Activity TrendsLast 5 years
Complaints have increased in the last 2 years
↑ Up 2300% in the last 2 years (24 vs 1 prior 2 yrs)
50250'24'26
Complaint SeverityⓘLast 10 years
Among the highest rates of serious complaints nearby
28 Priority A and B complaints over 12 years — 2.6 per year on average. Size-normalized by building volume.
2.6/yr98th pct(med. 0.0/yr)fewermedianmost
Department of Buildings Complaints
Total complaints since 2015
31
13 active
Total Priority Aⓘ
3
Total Priority Bⓘ
25
11 active
No Access for Inspection (past 5 yrs)ⓘ
100%
13 complaints
Complaints over time
5 yrsAll time

First filed Apr 15, 2015. Latest: Nov 18, 2026.

Top complaint types
5 yrsAll time
A — ImminentB — SeriousC — StandardD — Minor
Complaint log
13total
Active onlyAll
DateComplaint typePriorityStatusClosedOutcome
Nov 18, 2026

Plumbing Work – Illegal/No Permit (also Sprinkler/Standpipe)

66

BACTIVE—
See something wrong? File a complaint with 311
—
Nov 14, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Nov 13, 2026

Illegal Conversion

45

BACTIVE——
Oct 21, 2026

7R

7R

ACTIVE——
Sep 24, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVEOct 2, 2026

Inspector unable to gain access - 1st attempt

Sep 4, 2026

Illegal Conversion

45

BACTIVE——
Aug 25, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Aug 5, 2026

Plumbing Work – Illegal/No Permit (also Sprinkler/Standpipe)

66

BACTIVEAug 7, 2026

Inspector unable to gain access - 1st attempt

Aug 5, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Jun 23, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Jun 19, 2026

Failure to Retain Water/Improper Drainage (LL103/89)

85

CACTIVEJun 23, 2026

Complaint assigned to construction unit

Jun 19, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Jun 19, 2026

Plumbing Work – Illegal/No Permit (also Sprinkler/Standpipe)

66

BACTIVEJun 26, 2026

Inspector unable to gain access - 1st attempt

BACTIVE
Nov 18, 2026
Plumbing Work – Illegal/No Permit (also Sprinkler/Standpipe)
66
BACTIVE
Nov 14, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Nov 13, 2026
Illegal Conversion
45
ACTIVE
Oct 21, 2026
7R
7R
BACTIVE
Sep 24, 2026
Boiler: Defective/Inoperative/No Permit
58
Closed Oct 2, 2026

Inspector unable to gain access - 1st attempt

BACTIVE
Sep 4, 2026
Illegal Conversion
45
BACTIVE
Aug 25, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Aug 5, 2026
Plumbing Work – Illegal/No Permit (also Sprinkler/Standpipe)
66
Closed Aug 7, 2026

Inspector unable to gain access - 1st attempt

BACTIVE
Aug 5, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Jun 23, 2026
Boiler: Defective/Inoperative/No Permit
58
CACTIVE
Jun 19, 2026
Failure to Retain Water/Improper Drainage (LL103/89)
85
Closed Jun 23, 2026

Complaint assigned to construction unit

BACTIVE
Jun 19, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Jun 19, 2026
Plumbing Work – Illegal/No Permit (also Sprinkler/Standpipe)
66
Closed Jun 26, 2026

Inspector unable to gain access - 1st attempt