stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

1201 SHAKESPEARE AVENUE

Bronx · ZIP 10452 · BIN 2003174 · Highbridge · On record since Jun 6, 2001 · Built 1930

NeighborhoodⓘHighbridge
Worse than most buildings in Highbridge
More complaints than 77% of residential buildings in Highbridge over the last 10 years. Size-normalized by building volume.
77th pct
Activity TrendsLast 5 years
Complaints have increased in the last 2 years
↑ Up 1300% in the last 2 years (14 vs 1 prior 2 yrs)
20100'21'26
Complaint SeverityⓘLast 10 years
About as many serious complaints as similar buildings
16 Priority A and B complaints over 25 years — 1.3 per year on average. Size-normalized by building volume.
1.3/yr62nd pct(med. 0.2/yr)fewermedianmost
Department of Buildings Complaints
Total complaints since 2001
19
9 active
Total Priority Aⓘ
2
Total Priority Bⓘ
14
9 active
No Access for Inspection (past 5 yrs)ⓘ
29%
2 complaints
Complaints over time
5 yrsAll time

First filed Jun 6, 2001. Latest: Sep 28, 2026.

Top complaint types
5 yrsAll time
A — ImminentB — SeriousC — StandardD — Minor
Complaint log
9total
Active onlyAll
DateComplaint typePriorityStatusClosedOutcome
Sep 28, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE—
See something wrong? File a complaint with 311
—
Sep 24, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Jul 23, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Jun 8, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Apr 8, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Mar 30, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Mar 27, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Mar 26, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Mar 25, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
BACTIVE
Sep 28, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Sep 24, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Jul 23, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Jun 8, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Apr 8, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Mar 30, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Mar 27, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Mar 26, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Mar 25, 2026
Boiler: Defective/Inoperative/No Permit
58