stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

2518 FREDRICK DOUGLAS BOULEVARD

Manhattan · ZIP 10030 · BIN 1084051 · Harlem (North) · On record since Jun 7, 2004 · Built 1920

NeighborhoodⓘHarlem (North)
Among the most complained-about buildings in Harlem (North)
More complaints than 100% of residential buildings in Harlem (North) over the last 10 years. Size-normalized by building volume.
100th pct
Activity TrendsLast 5 years
Complaints have increased in the last 2 years
↑ Up 47% in the last 2 years (25 vs 17 prior 2 yrs)
20100'21'26
Complaint SeverityⓘLast 10 years
Among the highest rates of serious complaints nearby
75 Priority A and B complaints over 22 years — 7.2 per year on average. Size-normalized by building volume.
7.2/yr99th pct(med. 0.1/yr)fewermedianmost
Department of Buildings Complaints
Total complaints since 2004
76
7 active
Total Priority Aⓘ
2
Total Priority Bⓘ
73
7 active
No Access for Inspection (past 5 yrs)ⓘ
34%
15 complaints
Complaints over time
5 yrsAll time

First filed Jun 7, 2004. Latest: Nov 19, 2026.

Top complaint types
5 yrsAll time
A — ImminentB — SeriousC — StandardD — Minor
Complaint log
7total
Active onlyAll
DateComplaint typePriorityStatusClosedOutcome
Nov 19, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE—
See something wrong? File a complaint with 311
—
Oct 26, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Oct 24, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Oct 13, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Sep 5, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVESep 11, 2026

Inspector unable to gain access - 1st attempt

Aug 25, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
Mar 23, 2026

Boiler: Defective/Inoperative/No Permit

58

BACTIVE——
BACTIVE
Nov 19, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Oct 26, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Oct 24, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Oct 13, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Sep 5, 2026
Boiler: Defective/Inoperative/No Permit
58
Closed Sep 11, 2026

Inspector unable to gain access - 1st attempt

BACTIVE
Aug 25, 2026
Boiler: Defective/Inoperative/No Permit
58
BACTIVE
Mar 23, 2026
Boiler: Defective/Inoperative/No Permit
58