stoop
MAP
LeaderboardAbout

2055 SACRAMENTO ST

Pacific Heights · San Francisco, CA · Parcel 0640018 · Last violation Jul 31, 2026 · Last complaint Nov 10, 2026

NeighborhoodPacific Heights
More violations than 100% of nearby buildings
More violations than 100% of buildings and more complaints than 100% of buildings in Pacific Heights. Size-normalized against residential buildings in the neighborhood.
ViolationsComplaints
Activity TrendsLast 5 years
More activity recently than in past years
Last 2 yrs: 76 violations · 12 complaints
'22'26ViolationsComplaints
Severityⓘopen violations
47 open DBI violations
Active Notices of Violation issued by the Department of Building Inspection.
Severe0
Serious41
Minor6

What to watch forⓘ

  1. Fire safety problems have been reported here.
    Worth checkingⓘ
    Walk the exit route from the unit to the street and check the stairs and hallways are clear of stored items, and that fire doors close properly.
    details ▸

    California law requires safe fire or emergency exits leading to a street or hallway, and requires stairs, hallways and exits to be kept litter free. Storage areas, garages and basements must be kept free of combustible materials. San Francisco's Housing Code separately treats inadequate exits and inadequate fire protection equipment as conditions that make a building substandard, which is the finding behind a notice of violation.

    • California Tenant Guide
    • San Francisco Housing Code §1001(m), (n)
  2. Smoke detector problems have been reported here.
    Worth checkingⓘ
    Look for a smoke detector in each bedroom and in the common stairwell, and for a carbon monoxide detector if the unit has a gas stove, a gas heater or an attached garage.
311 Housing Complaints
Total complaints since 2013
19
1 per year avg.↑ Up 1100% in the last 2 years (12 vs 1 prior 2 yrs)
Complaint severity
Last 5 years
13
Severeⓘ6
Seriousⓘ5
Minorⓘ2
Dept. of Building Inspection Violations
Total violations since 1999
180
6 per year avg.↑ Up 2433% in the last 2 years (76 vs 3 prior 2 yrs)
Open violations
47
Severeⓘ0
Seriousⓘ41
Minorⓘ6

Top violation categories

5 yrsAll time
Exterior & windowsⓘ13 violations
Cleanliness & refuseⓘ6 violations
Plumbingⓘ5 violations
Fire safetyⓘ5 violations
Smoke detectorsⓘ4 violations
Moldⓘ4 violations
Peeling paintⓘ3 violations
Permits & unpermitted workⓘ2 violations
Floors & stairsⓘ2 violations
Walls, ceilings & cabinetsⓘ2 violations
Electricalⓘ2 violations
No specific condition stated38 violations
17 still open. See violation log below.

Top complaint types

5 yrsAll time
Elevators No Working Elevator 7 Or More Stories6 complaints
Mold And Mildew3 complaints
Elevators Everthing Else2 complaints
General Maintenance Not In List Above1 complaints
Mail Service Delivery Problem1 complaints
Hide violations (180) ↑See complaints (19) →

Violation log

180 DBI violations

AllOpenClosed
StatusFiledCategoryItemNOV Item Description
OpenJul 31, 2026building sectionthis notice includes violations for the areas noted.this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2025 sacramento street, unit 309, san francisco, ca.
See something wrong? File a complaint with SF 311
details ▸

California law requires working smoke detectors in all bedrooms and other designated areas of a rental unit, and apartment complexes must also have them in common stairwells. Any unit with appliances that burn fossil fuels such as natural gas, propane or fuel oil, or with an attached garage, must also have working carbon monoxide detectors.

  • California Tenant Guide
  • Tenants here have reported mold.
    Worth checkingⓘ
    Look for dark spots on walls, floors and ceilings, and for dry or wet spots, flaking or bubbling, or a damp or moldy smell, especially in bathrooms and closets.
    details ▸

    San Francisco's Health Code treats visible or otherwise demonstrable mold or mildew in a residential building as a public health nuisance in its own right. Under state law, mold that the landlord has notice of and that affects livability or health can also breach the implied warranty of habitability.

    • California Tenant Guide
    • San Francisco Health Code §581(b)(6)
  • OpenJul 31, 2026building sectionrepair window sash frame 1001h, 708 sfhcthe aluminum framed window in the living room has rolling hardware that requires replacement. the sash frame drags and requires lifting to set it back in place for a weatherproof condition. repair or replace the window. when complete, the windows shall provide smooth and easy operation and a weather tight condition with a working latch.
    OpenJul 31, 2026building sectionreplace the damaged and missing flooring 1001 b, d, 1306 sfhcthe wood-grained laminate flooring has curled along the seams. the raised edges have worn through the laminate to the sub-straight. this is no longer a cleanable surface. repair or replace the flooring to provide a durable and cleanable surface.
    OpenJul 31, 2026other sectioninspector commentsimportant note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    OpenApr 23, 2026building sectionthis notice includes violations for the areas noted.this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, in unit 106, san francisco, ca.
    OpenApr 23, 2026building sectionrepair damaged wall and paint 1001 b13, d, l, 1301 sfhcthere is a wall repair left as raw joint compound. joint compound is water soluable and therefore not a finished wall surface. complete the plaster repair and then prime and paint the area.
    OpenApr 23, 2026building sectionrepair or replace the heaters 701c1, 1001b6, d sfhcthe heater in the bedroom was removed. the existing heater is not functioning. replace the missing baseboard heater. repair or replace the broken heater.
    OpenApr 23, 2026building sectionrepair the sliding glass door 1001b13, d sfhcthe sliding glass door drags and is very difficult to operate. repair or replace the door hardware to provide smooth and esy operation of the sliding glass door.
    OpenApr 23, 2026building sectionencapsulate or remove the popcorn ceiling 1001k, d, 1301 sfhcthe shelf life for the acoustic spray (popcorn ceiling) has long past. given the date of construction of this building, the product likely contains asbestos. in addition, the product is friable. remove (not recommended) or encapsulate the popcorn ceiling. encapsulate the popcorn ceiling using specialized encapsulant paint, or by applying a high-quality acrylic latex paint, which seals the surface, binds fibers, and prevents dust. safety note: your building was built before 1978; the ceiling may contain asbestos, making encapsulation a safer alternative to removal. preparation: before painting, it is highly recommended to use a primer, such as an oil-based primer like kilz, to harden the texture. best paint type: use interior flat or matte acrylic latex paint. flat finishes hide imperfections better than glossy ones. specialized products: products like hy-tech encapsulguard are designed to adhere directly to older surfaces, including those that may contain asbestos or lead. application methods: sprayer: a paint sprayer is generally preferred to avoid removing or damaging the delicate texture. roller: use a thick nap roller (3/4" to 1-1/4" knap) and apply gentle pressure to prevent the texture from breaking off. removing popcorn ceilings involves spraying the texture with water to soften it, then scraping it off with a putty knife, making it messy. removal shall require an asbestos remediation company. if this method is chosen, provide invoicing from the remediation company at final inspection.
    OpenApr 23, 2026other sectioninspector commentsimportant note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    OpenApr 23, 2026building sectionthis notice includes violations for the areas noted.this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, in unit 105, san francisco, ca.
    OpenApr 23, 2026building sectionrepair weather proofing at sliding glass door 1001h, 703 sfhcthe area drain at the sliding glass door is failing. the drain appears too high, exceeding the sill height of the door. the patio flags show inverted pitch directing the storm water right into the resident's living room. lower the height of the area drain and provide proper pitch to redirect storm water into the area drain.
    OpenApr 23, 2026building sectionreplace broken glass window pane 1001h, 708 sfhcthe glass on the left panel of the sliding glass door is broken. replace the broken glass.
    OpenApr 23, 2026building sectionrepair the sliding glass door 1001b13, d, sfhcthe sliding glass door drags and is very difficult to open. repair or replace the door hardware to provide smooth and easy operation of the sliding glass door.
    OpenApr 23, 2026building sectionreplace the carpet 1001b13, d, 1306 sfhcthe carpet has outlasted its serviceable life time. it is water stained from garden floods. the weave is matted and worn. shampooing and stretching will not provide additional wear. it is torn and a trip hazard at the entrance to the kitchen. replace the carpet in this unit.
    OpenApr 23, 2026building sectionrepair the kitchen cabinetry 1001b13, l sfhcthe kitchen cabinets were constructed with a particle board substrate. the edges of the doors have absorbed water and swelled. there are two doors missing. many of the kitchen drawers are unusable in their present state. repair the drawers and slides. once complete the drawers should provide secure storage and smooth and easy operation. repair or replace the kitchen cabinets. the finished product shall offer sanitary food preparation and storage areas.
    OpenApr 23, 2026building sectionencapsulate or remove the popcorn ceiling 1001k, d, 1301 sfhcthe shelf life for the acoustic spray (popcorn ceiling) has long past. given the date of construction of this building, the product likely contains asbestos. in addition, the product is friable. remove (not recommended) or encapsulate the popcorn ceiling. encapsulate the popcorn ceiling using specialized encapsulant paint, or by applying a high-quality acrylic latex paint, which seals the surface, binds fibers, and prevents dust. safety note: your building was built before 1978; the ceiling may contain asbestos, making encapsulation a safer alternative to removal. preparation: before painting, it is highly recommended to use a primer, such as an oil-based primer like kilz, to harden the texture. best paint type: use interior flat or matte acrylic latex paint. flat finishes hide imperfections better than glossy ones. specialized products: products like hy-tech encapsulguard are designed to adhere directly to older surfaces, including those that may contain asbestos or lead. application methods: sprayer: a paint sprayer is generally preferred to avoid removing or damaging the delicate texture. roller: use a thick nap roller (3/4" to 1-1/4" knap) and apply gentle pressure to prevent the texture from breaking off. removing popcorn ceilings involves spraying the texture with water to soften it, then scraping it off with a putty knife, making it messy. removal shall require an asbestos remediation company. if this method is chosen, provide invoicing from the remediation company at final inspection.
    OpenApr 23, 2026building sectionprovide weather stripping at the entry door 708, 1001h sfhcthe entry door has a draft. provide weather stripping at the front entry door.
    OpenApr 23, 2026other sectioninspector commentsimportant note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    not activeApr 23, 2026building sectionthis notice includes violations for the areas noted.this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, in unit 802, san francisco, ca.
    not activeApr 23, 2026building sectionreplace the metal guard rail at the window sill 1001b13, k sfhceach of the windows in the unit had three metal guards on the sill. the far left guard in the living room has rusted and scheared off leaving sharp rough edges on the window sill. replace the missing guard.
    not activeApr 23, 2026other sectioninspector commentsimportant note: it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    not activeApr 16, 2026building sectionthis notice includes violations for the areas noted.this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, unit 902, san francisco, ca.
    not activeApr 16, 2026building sectionclean and sanitize or replace the carpet 1001b, d 1306 sfhcdry, vacuum and then shampoo and stretch the carpets to remove stains and limit the potential for mold growth. or replace the carpet with any durable, cleanable, finished floor surface. the second bedroom in this unit has no finished floor. provide a durable, cleanable floor finish.
    not activeApr 16, 2026building sectionreplace the missing base board 1001b13 sfhcthere is a 4" plastic base board in most of the unit. there is a stretch missing in the entry hall and rounding the corner into the kitchen. replace the missing baseboard.
    not activeApr 16, 2026building sectionrepair or replace the entry hall closet door 1001b13 sfhcthe entry hall closet door is delaminating due to water damage. repair or replace the door.
    not activeApr 16, 2026building sectionreplace the missing living room baseboard heater 701c1, 1001b6, d sfhcthe base board heater in the living room has been removed. replace the missing heater.
    not activeApr 16, 2026building sectionpaint the unit as necessary 1301 sfhcthe walls in the unit have areas of unrepaired damage. there is also an area of damage that has been repaired but was never painted to complete the repair. prep, prime and paint the walls as necessary to provide a durable and cleanable wall surface.
    not activeApr 16, 2026building sectionrepair window latches or hardware 1001d, b, h, 705 sfhcthe second bedroom in this unit does not have a working lock on the window. provide a working lock.
    not activeApr 16, 2026building sectionmalfunctioning appliance - repair or replace the dishwasher 505c, 1001d, f, l sfhcthe dishwasher drains out on the kitchen floor during use. repair or replace the unit dishwasher.
    not activeApr 16, 2026building sectionencapsulate or remove the popcorn ceiling 1001k, d, 1301 sfhcthe shelf life for the acoustic spray (popcorn ceiling) has long past. given the date of construction of this building, the product likely contains asbestos. in addition, the product is friable. remove (not recommended) or encapsulate the popcorn ceiling. encapsulating may be done with drywall or paint. to encapsulate the popcorn ceiling you may use specialized encapsulant paint, or apply a high-quality acrylic latex paint, which seals the surface, binds fibers, and prevents dust. safety note: your building was built before 1978; the ceiling is assumed to contain asbestos, making encapsulation a safer alternative to removal. preparation: before painting, it is highly recommended to use a primer, such as an oil-based primer like kilz, to harden the texture. best paint type: use interior flat or matte acrylic latex paint. flat finishes hide imperfections better than glossy ones. specialized products: products like hy-tech encapsulguard are designed to adhere directly to older surfaces, including those that may contain asbestos or lead. application methods: sprayer: a paint sprayer is generally preferred to avoid removing or damaging the delicate texture. roller: use a thick nap roller (3/4" to 1-1/4" knap) and apply gentle pressure to prevent the texture from breaking off. removing popcorn ceilings involves spraying the texture with water to soften it, then scraping it off with a putty knife, making it messy. removal shall require an asbestos remediation company. if this method is chosen, provide invoicing from the remediation company at final inspection.
    not activeApr 16, 2026other sectioninspector commentsimportant note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    OpenFeb 17, 2026building sectionthis notice includes violations for the areas noted.this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, in the common areas, san francisco, ca.
    OpenFeb 17, 2026building sectionprovide weather protection 703, 1001d, h3, 1301 sfhcthe exterior of the building is pocked with peeling and blistered paint. blistered paint was found in the front entry area. west stairwell 3 has a line of peeling paint at regular intervals on every floor, probably the cold seams in the original concrete pour. the base of many of the walls in this stair have gone beyond peeling paint to spalling concrete surfaces. on the eighth floor the header on the stair landing has a large area of fallen concrete that now exposes rebar. the metal doors and jambs in both stairwells are rusting. the ceilings of most stair landings are spotted with water damage and peeling paint. the roof access hatch in the east stairwell is rusted and leaking. the interior court walls are pocked with bare spots. obtain the services of a certified lead abatement contractor. this structure at 2055 sacramento street, san francisco, ca is a pre-1978 building and so this paint debris is presumed to contain lead. to work without lead abatement protocols, provide certification from a qualified lead testing laboratory to show the debris has no lead base. otherwise, obtain the services of a certified lead abatement contractor. comply with the balance of this notice of violation. remove and repair or replace any loose or damaged concrete. stabilize, prep, prime and paint the peeling areas of the exterior of the structure, the interior of the stairwells, the inside and outside of the center court, the doors and door frames, where necessary to provide a weather tight building envelope. your contractor is to follow the established protocol, as outlined, to strip and or/stabilize the peeling paint on your building. all contractors, including but not limited to carpenters, plumbers, electricians, plasterers and painters who disturb lead paint while working on a pre-1978 structure must be lead safe certified effective april 2010.
    OpenFeb 17, 2026building sectionfollow all standard procedures for lead abatement as outlined by the san francisco existing building code 327 sfebcthe following is a list of the existing building codes that shall be honored in the performance of the paint work. provide notification to residents 1001d, k sfhc, 327.5.6 sfebc provide signage during work 1001d, k sfhc, 327.5.4 sfebc restrict access to the work area 1001d, k sfhc, 327.4.1 sfebc provide containment and barrier systems 1001d, k sfhc, 327.4.2 sfebc protect the ground from debris 1001d, k sfhc, 327.4.2.1 sfebc prevent migration of debris 1001d, k sfhc, 327.4.3 sfebc provide weather protection 703, 1001d, h3, 1301 sfhc follow exterior clean up standards each day 1001d, k sfhc, 327.4.4.2 sfebc comply with this notice of violation and insure that no lead based debris is left behind on this and the adjacent properties.
    OpenFeb 17, 2026other sectioninspector commentsimportant note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    OpenJan 2, 2026building sectionthis notice includes violations for the areas noted.this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, common areas, san francisco, ca. this was a complaint generated routine inspection initiated by complaint number 202547702.
    OpenJan 2, 2026building sectionrepair damaged walls and paint 1001 b13, d, l, 1301 sfhcthe wall in parking stall 1 has rot up 18" in the drywall. the drywall is damp and spongey. the sole plate moves when kicked. similar conditions exist at parking stall 26 and 32. remove damaged or contaminated drywall and framing members. replace with new. plaster, prep, prime and paint to complete the repairs. *** this item requires building permits
    OpenJan 2, 2026building sectionprovide a smoke enclosure door self closer 707, 807 sfhcthere is a door in the garage marked for electrical, telephone and fire alarm that has no self closer. provide a self closer for this door.
    OpenJan 2, 2026building sectionrepair the overhead leaks 1001b13, d sfhcthere are a number of leaks overhead in the garage. there appear to be different reason for many of the leaks. at parking stall 19 there is a 3/4" copper plumbing line leaking. there are 2 leaks in the area around parking stalls 24 & 25. at parking stall 26 there is a 4" cast iron p-trap leaking there is a 1"galvanized line leaking over the car ramp there is another leak at stalls 72-73. there is an 8" line in the northwest corner of the garage that is leaking. another leak has a tar patch that has opened because the leak is still active. find and fix the different sources of all leaks, whether mentioned here or not. the entire garage will be inspected for correction.
    OpenJan 2, 2026building sectionpermanently remove personal storage from the garage 603b sfhcthere is resident storage stored in parking stalls in the garage. there is also left over drywall wonder board and trash bags on the top level of the garage. both public and private garages shall be used only for the storage of automobiles, bicycles, scooters and other such transportation vehicles. remove personal storage from parking stalls to include but not limited to stalls: 31, 41, 45, 57, 64, 70, 72, 73, 76, 78, 80, 84 and 85.
    OpenJan 2, 2026building sectionrepair or replace the air handling fan in the lowest level of the garage 1001k, d sfhcthe fan provided to remove carbon monoxide from the parking garage is seized (near stall 81). the electrical power switches on and the buzz indicates there is power being fed to the unit but the fan is frozen in place. repair or replace the exhaust fan. *** this item requires mechanical permits
    OpenJan 2, 2026building sectionrepair or replace the door/door hardware 1001b13, 706 sfhcthe door in the northeast corner of the garage leading to the walkway and to the sidewalk has a door knob that is loose and falling out. repair or replace the door/door hardware as necessary to provide security. upon completion the door and jamb shall be tight fitting, in good condition, self-closing and self-latching.
    OpenJan 2, 2026building sectionrepair damaged walls and paint 1001 b13, d, l, 1301 sfhcthere are double doors into a room marked "dumpster". when opened the doors move the wall around them. there are no self-closers on the doors. remove the drywall from the wall to examine for repair. repair or replace the framing members as necessary to secure the sole plate to the floor and the top plate to the slab above. install door self-closing mechanisms. *** this item requires building permits
    OpenJan 2, 2026building sectionclean and sanitize the trash areas and laundry room 1306 sfhcthe laundry room had dryer lint and laundry detergent behind the washers and dryers. clean and sanitize the laundry room.
    OpenJan 2, 2026building sectionmalfunctioning appliance - repair or replace the auxiliary lighting 504g, 1001e, l, m sfhc, 1011.6.3 sfbcmany of the auxiliary lighting fixtures with the green exit indicators in the halls and rear stairs fail testing. replace the batteries in the auxiliary lighting system or replace the lighting fixtures, as necessary.
    OpenJan 2, 2026building sectionpost certification of current alarm system maintenance by qualified contractor 908, 909, 911 sfhcthe alarm system at the front hallway has no tag displaying the last date of service. fire alarm systems shall be re-certified every year and the date of service and/or expiration date shall be posted on the unit. all testing and maintenance shall be conducted according to the manufacturer's recommendations.
    OpenJan 2, 2026building sectionremove cord wiring 1001d, e sfhc, 400.8 necthe wifi system in the open court on the first floor has an extension cord to an outlet. it is not permitted to use a flexible extension cord as a substitute for fixed wiring to a permanent fixture. nor is it permitted to affix an extension cord to a wall, ceiling, floor or above a suspended ceiling. remove the extension cord. *** if the wifi system is to remain in place, a permanent electrical receptacle shall be installed. *** this item requires electrical permits
    OpenJan 2, 2026other sectioninspector commentsimportant note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    OpenJan 2, 2026building sectionre-install the fire alarm 1001i sfhcthere is a wired smoke detector in the northwest stairwell 3 that has been removed from its mounting plate. repair or replace the smoke detector.
    OpenJul 31, 2026
    building section · this notice includes violations for the areas noted.
    this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2025 sacramento street, unit 309, san francisco, ca.
    OpenJul 31, 2026
    building section · repair window sash frame 1001h, 708 sfhc
    the aluminum framed window in the living room has rolling hardware that requires replacement. the sash frame drags and requires lifting to set it back in place for a weatherproof condition. repair or replace the window. when complete, the windows shall provide smooth and easy operation and a weather tight condition with a working latch.
    OpenJul 31, 2026
    building section · replace the damaged and missing flooring 1001 b, d, 1306 sfhc
    the wood-grained laminate flooring has curled along the seams. the raised edges have worn through the laminate to the sub-straight. this is no longer a cleanable surface. repair or replace the flooring to provide a durable and cleanable surface.
    OpenJul 31, 2026
    other section · inspector comments
    important note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    OpenApr 23, 2026
    building section · this notice includes violations for the areas noted.
    this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, in unit 106, san francisco, ca.
    OpenApr 23, 2026
    building section · repair damaged wall and paint 1001 b13, d, l, 1301 sfhc
    there is a wall repair left as raw joint compound. joint compound is water soluable and therefore not a finished wall surface. complete the plaster repair and then prime and paint the area.
    OpenApr 23, 2026
    building section · repair or replace the heaters 701c1, 1001b6, d sfhc
    the heater in the bedroom was removed. the existing heater is not functioning. replace the missing baseboard heater. repair or replace the broken heater.
    OpenApr 23, 2026
    building section · repair the sliding glass door 1001b13, d sfhc
    the sliding glass door drags and is very difficult to operate. repair or replace the door hardware to provide smooth and esy operation of the sliding glass door.
    OpenApr 23, 2026
    building section · encapsulate or remove the popcorn ceiling 1001k, d, 1301 sfhc
    the shelf life for the acoustic spray (popcorn ceiling) has long past. given the date of construction of this building, the product likely contains asbestos. in addition, the product is friable. remove (not recommended) or encapsulate the popcorn ceiling. encapsulate the popcorn ceiling using specialized encapsulant paint, or by applying a high-quality acrylic latex paint, which seals the surface, binds fibers, and prevents dust. safety note: your building was built before 1978; the ceiling may contain asbestos, making encapsulation a safer alternative to removal. preparation: before painting, it is highly recommended to use a primer, such as an oil-based primer like kilz, to harden the texture. best paint type: use interior flat or matte acrylic latex paint. flat finishes hide imperfections better than glossy ones. specialized products: products like hy-tech encapsulguard are designed to adhere directly to older surfaces, including those that may contain asbestos or lead. application methods: sprayer: a paint sprayer is generally preferred to avoid removing or damaging the delicate texture. roller: use a thick nap roller (3/4" to 1-1/4" knap) and apply gentle pressure to prevent the texture from breaking off. removing popcorn ceilings involves spraying the texture with water to soften it, then scraping it off with a putty knife, making it messy. removal shall require an asbestos remediation company. if this method is chosen, provide invoicing from the remediation company at final inspection.
    OpenApr 23, 2026
    other section · inspector comments
    important note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    OpenApr 23, 2026
    building section · this notice includes violations for the areas noted.
    this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, in unit 105, san francisco, ca.
    OpenApr 23, 2026
    building section · repair weather proofing at sliding glass door 1001h, 703 sfhc
    the area drain at the sliding glass door is failing. the drain appears too high, exceeding the sill height of the door. the patio flags show inverted pitch directing the storm water right into the resident's living room. lower the height of the area drain and provide proper pitch to redirect storm water into the area drain.
    OpenApr 23, 2026
    building section · replace broken glass window pane 1001h, 708 sfhc
    the glass on the left panel of the sliding glass door is broken. replace the broken glass.
    OpenApr 23, 2026
    building section · repair the sliding glass door 1001b13, d, sfhc
    the sliding glass door drags and is very difficult to open. repair or replace the door hardware to provide smooth and easy operation of the sliding glass door.
    OpenApr 23, 2026
    building section · replace the carpet 1001b13, d, 1306 sfhc
    the carpet has outlasted its serviceable life time. it is water stained from garden floods. the weave is matted and worn. shampooing and stretching will not provide additional wear. it is torn and a trip hazard at the entrance to the kitchen. replace the carpet in this unit.
    OpenApr 23, 2026
    building section · repair the kitchen cabinetry 1001b13, l sfhc
    the kitchen cabinets were constructed with a particle board substrate. the edges of the doors have absorbed water and swelled. there are two doors missing. many of the kitchen drawers are unusable in their present state. repair the drawers and slides. once complete the drawers should provide secure storage and smooth and easy operation. repair or replace the kitchen cabinets. the finished product shall offer sanitary food preparation and storage areas.
    OpenApr 23, 2026
    building section · encapsulate or remove the popcorn ceiling 1001k, d, 1301 sfhc
    the shelf life for the acoustic spray (popcorn ceiling) has long past. given the date of construction of this building, the product likely contains asbestos. in addition, the product is friable. remove (not recommended) or encapsulate the popcorn ceiling. encapsulate the popcorn ceiling using specialized encapsulant paint, or by applying a high-quality acrylic latex paint, which seals the surface, binds fibers, and prevents dust. safety note: your building was built before 1978; the ceiling may contain asbestos, making encapsulation a safer alternative to removal. preparation: before painting, it is highly recommended to use a primer, such as an oil-based primer like kilz, to harden the texture. best paint type: use interior flat or matte acrylic latex paint. flat finishes hide imperfections better than glossy ones. specialized products: products like hy-tech encapsulguard are designed to adhere directly to older surfaces, including those that may contain asbestos or lead. application methods: sprayer: a paint sprayer is generally preferred to avoid removing or damaging the delicate texture. roller: use a thick nap roller (3/4" to 1-1/4" knap) and apply gentle pressure to prevent the texture from breaking off. removing popcorn ceilings involves spraying the texture with water to soften it, then scraping it off with a putty knife, making it messy. removal shall require an asbestos remediation company. if this method is chosen, provide invoicing from the remediation company at final inspection.
    OpenApr 23, 2026
    building section · provide weather stripping at the entry door 708, 1001h sfhc
    the entry door has a draft. provide weather stripping at the front entry door.
    OpenApr 23, 2026
    other section · inspector comments
    important note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    not activeApr 23, 2026
    building section · this notice includes violations for the areas noted.
    this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, in unit 802, san francisco, ca.
    not activeApr 23, 2026
    building section · replace the metal guard rail at the window sill 1001b13, k sfhc
    each of the windows in the unit had three metal guards on the sill. the far left guard in the living room has rusted and scheared off leaving sharp rough edges on the window sill. replace the missing guard.
    not activeApr 23, 2026
    other section · inspector comments
    important note: it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    not activeApr 16, 2026
    building section · this notice includes violations for the areas noted.
    this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, unit 902, san francisco, ca.
    not activeApr 16, 2026
    building section · clean and sanitize or replace the carpet 1001b, d 1306 sfhc
    dry, vacuum and then shampoo and stretch the carpets to remove stains and limit the potential for mold growth. or replace the carpet with any durable, cleanable, finished floor surface. the second bedroom in this unit has no finished floor. provide a durable, cleanable floor finish.
    not activeApr 16, 2026
    building section · replace the missing base board 1001b13 sfhc
    there is a 4" plastic base board in most of the unit. there is a stretch missing in the entry hall and rounding the corner into the kitchen. replace the missing baseboard.
    not activeApr 16, 2026
    building section · repair or replace the entry hall closet door 1001b13 sfhc
    the entry hall closet door is delaminating due to water damage. repair or replace the door.
    not activeApr 16, 2026
    building section · replace the missing living room baseboard heater 701c1, 1001b6, d sfhc
    the base board heater in the living room has been removed. replace the missing heater.
    not activeApr 16, 2026
    building section · paint the unit as necessary 1301 sfhc
    the walls in the unit have areas of unrepaired damage. there is also an area of damage that has been repaired but was never painted to complete the repair. prep, prime and paint the walls as necessary to provide a durable and cleanable wall surface.
    not activeApr 16, 2026
    building section · repair window latches or hardware 1001d, b, h, 705 sfhc
    the second bedroom in this unit does not have a working lock on the window. provide a working lock.
    not activeApr 16, 2026
    building section · malfunctioning appliance - repair or replace the dishwasher 505c, 1001d, f, l sfhc
    the dishwasher drains out on the kitchen floor during use. repair or replace the unit dishwasher.
    not activeApr 16, 2026
    building section · encapsulate or remove the popcorn ceiling 1001k, d, 1301 sfhc
    the shelf life for the acoustic spray (popcorn ceiling) has long past. given the date of construction of this building, the product likely contains asbestos. in addition, the product is friable. remove (not recommended) or encapsulate the popcorn ceiling. encapsulating may be done with drywall or paint. to encapsulate the popcorn ceiling you may use specialized encapsulant paint, or apply a high-quality acrylic latex paint, which seals the surface, binds fibers, and prevents dust. safety note: your building was built before 1978; the ceiling is assumed to contain asbestos, making encapsulation a safer alternative to removal. preparation: before painting, it is highly recommended to use a primer, such as an oil-based primer like kilz, to harden the texture. best paint type: use interior flat or matte acrylic latex paint. flat finishes hide imperfections better than glossy ones. specialized products: products like hy-tech encapsulguard are designed to adhere directly to older surfaces, including those that may contain asbestos or lead. application methods: sprayer: a paint sprayer is generally preferred to avoid removing or damaging the delicate texture. roller: use a thick nap roller (3/4" to 1-1/4" knap) and apply gentle pressure to prevent the texture from breaking off. removing popcorn ceilings involves spraying the texture with water to soften it, then scraping it off with a putty knife, making it messy. removal shall require an asbestos remediation company. if this method is chosen, provide invoicing from the remediation company at final inspection.
    not activeApr 16, 2026
    other section · inspector comments
    important note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    OpenFeb 17, 2026
    building section · this notice includes violations for the areas noted.
    this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, in the common areas, san francisco, ca.
    OpenFeb 17, 2026
    building section · provide weather protection 703, 1001d, h3, 1301 sfhc
    the exterior of the building is pocked with peeling and blistered paint. blistered paint was found in the front entry area. west stairwell 3 has a line of peeling paint at regular intervals on every floor, probably the cold seams in the original concrete pour. the base of many of the walls in this stair have gone beyond peeling paint to spalling concrete surfaces. on the eighth floor the header on the stair landing has a large area of fallen concrete that now exposes rebar. the metal doors and jambs in both stairwells are rusting. the ceilings of most stair landings are spotted with water damage and peeling paint. the roof access hatch in the east stairwell is rusted and leaking. the interior court walls are pocked with bare spots. obtain the services of a certified lead abatement contractor. this structure at 2055 sacramento street, san francisco, ca is a pre-1978 building and so this paint debris is presumed to contain lead. to work without lead abatement protocols, provide certification from a qualified lead testing laboratory to show the debris has no lead base. otherwise, obtain the services of a certified lead abatement contractor. comply with the balance of this notice of violation. remove and repair or replace any loose or damaged concrete. stabilize, prep, prime and paint the peeling areas of the exterior of the structure, the interior of the stairwells, the inside and outside of the center court, the doors and door frames, where necessary to provide a weather tight building envelope. your contractor is to follow the established protocol, as outlined, to strip and or/stabilize the peeling paint on your building. all contractors, including but not limited to carpenters, plumbers, electricians, plasterers and painters who disturb lead paint while working on a pre-1978 structure must be lead safe certified effective april 2010.
    OpenFeb 17, 2026
    building section · follow all standard procedures for lead abatement as outlined by the san francisco existing building code 327 sfebc
    the following is a list of the existing building codes that shall be honored in the performance of the paint work. provide notification to residents 1001d, k sfhc, 327.5.6 sfebc provide signage during work 1001d, k sfhc, 327.5.4 sfebc restrict access to the work area 1001d, k sfhc, 327.4.1 sfebc provide containment and barrier systems 1001d, k sfhc, 327.4.2 sfebc protect the ground from debris 1001d, k sfhc, 327.4.2.1 sfebc prevent migration of debris 1001d, k sfhc, 327.4.3 sfebc provide weather protection 703, 1001d, h3, 1301 sfhc follow exterior clean up standards each day 1001d, k sfhc, 327.4.4.2 sfebc comply with this notice of violation and insure that no lead based debris is left behind on this and the adjacent properties.
    OpenFeb 17, 2026
    other section · inspector comments
    important note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    OpenJan 2, 2026
    building section · this notice includes violations for the areas noted.
    this notice includes violations of the san francisco housing code. unless noted otherwise, all violations were observed on the date of inspection at 2055 sacramento street, common areas, san francisco, ca. this was a complaint generated routine inspection initiated by complaint number 202547702.
    OpenJan 2, 2026
    building section · repair damaged walls and paint 1001 b13, d, l, 1301 sfhc
    the wall in parking stall 1 has rot up 18" in the drywall. the drywall is damp and spongey. the sole plate moves when kicked. similar conditions exist at parking stall 26 and 32. remove damaged or contaminated drywall and framing members. replace with new. plaster, prep, prime and paint to complete the repairs. *** this item requires building permits
    OpenJan 2, 2026
    building section · provide a smoke enclosure door self closer 707, 807 sfhc
    there is a door in the garage marked for electrical, telephone and fire alarm that has no self closer. provide a self closer for this door.
    OpenJan 2, 2026
    building section · repair the overhead leaks 1001b13, d sfhc
    there are a number of leaks overhead in the garage. there appear to be different reason for many of the leaks. at parking stall 19 there is a 3/4" copper plumbing line leaking. there are 2 leaks in the area around parking stalls 24 & 25. at parking stall 26 there is a 4" cast iron p-trap leaking there is a 1"galvanized line leaking over the car ramp there is another leak at stalls 72-73. there is an 8" line in the northwest corner of the garage that is leaking. another leak has a tar patch that has opened because the leak is still active. find and fix the different sources of all leaks, whether mentioned here or not. the entire garage will be inspected for correction.
    OpenJan 2, 2026
    building section · permanently remove personal storage from the garage 603b sfhc
    there is resident storage stored in parking stalls in the garage. there is also left over drywall wonder board and trash bags on the top level of the garage. both public and private garages shall be used only for the storage of automobiles, bicycles, scooters and other such transportation vehicles. remove personal storage from parking stalls to include but not limited to stalls: 31, 41, 45, 57, 64, 70, 72, 73, 76, 78, 80, 84 and 85.
    OpenJan 2, 2026
    building section · repair or replace the air handling fan in the lowest level of the garage 1001k, d sfhc
    the fan provided to remove carbon monoxide from the parking garage is seized (near stall 81). the electrical power switches on and the buzz indicates there is power being fed to the unit but the fan is frozen in place. repair or replace the exhaust fan. *** this item requires mechanical permits
    OpenJan 2, 2026
    building section · repair or replace the door/door hardware 1001b13, 706 sfhc
    the door in the northeast corner of the garage leading to the walkway and to the sidewalk has a door knob that is loose and falling out. repair or replace the door/door hardware as necessary to provide security. upon completion the door and jamb shall be tight fitting, in good condition, self-closing and self-latching.
    OpenJan 2, 2026
    building section · repair damaged walls and paint 1001 b13, d, l, 1301 sfhc
    there are double doors into a room marked "dumpster". when opened the doors move the wall around them. there are no self-closers on the doors. remove the drywall from the wall to examine for repair. repair or replace the framing members as necessary to secure the sole plate to the floor and the top plate to the slab above. install door self-closing mechanisms. *** this item requires building permits
    OpenJan 2, 2026
    building section · clean and sanitize the trash areas and laundry room 1306 sfhc
    the laundry room had dryer lint and laundry detergent behind the washers and dryers. clean and sanitize the laundry room.
    OpenJan 2, 2026
    building section · malfunctioning appliance - repair or replace the auxiliary lighting 504g, 1001e, l, m sfhc, 1011.6.3 sfbc
    many of the auxiliary lighting fixtures with the green exit indicators in the halls and rear stairs fail testing. replace the batteries in the auxiliary lighting system or replace the lighting fixtures, as necessary.
    OpenJan 2, 2026
    building section · post certification of current alarm system maintenance by qualified contractor 908, 909, 911 sfhc
    the alarm system at the front hallway has no tag displaying the last date of service. fire alarm systems shall be re-certified every year and the date of service and/or expiration date shall be posted on the unit. all testing and maintenance shall be conducted according to the manufacturer's recommendations.
    OpenJan 2, 2026
    building section · remove cord wiring 1001d, e sfhc, 400.8 nec
    the wifi system in the open court on the first floor has an extension cord to an outlet. it is not permitted to use a flexible extension cord as a substitute for fixed wiring to a permanent fixture. nor is it permitted to affix an extension cord to a wall, ceiling, floor or above a suspended ceiling. remove the extension cord. *** if the wifi system is to remain in place, a permanent electrical receptacle shall be installed. *** this item requires electrical permits
    OpenJan 2, 2026
    other section · inspector comments
    important note: due to the nature of this violation, this property has been defined as a nuisance per section 1001-d of the san francisco housing code. it is the property owner¿s responsibility to be present or direct his/her representative to attend the re-inspection as scheduled on this notice of violation for the purpose of providing entry to the inspector of those areas not accessed during the initial inspection as specified, and/or to provide access to all areas cited within this notice. if the property owner cannot attend the scheduled re-inspection (as specified on this notice) it is his/her responsibility to secure a different inspection date and time with the inspector, and provide all tenants with notification as required by california civil code section 1954 (san francisco housing code section 303(b), if any dwellings, apartment units or guest rooms are to be accessed during the re-inspection.
    OpenJan 2, 2026
    building section · re-install the fire alarm 1001i sfhc
    there is a wired smoke detector in the northwest stairwell 3 that has been removed from its mounting plate. repair or replace the smoke detector.
    Page 1 of 4
    Next →