stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

35 HOLLAND AVENUE

Staten Island · ZIP 10303 · BIN 5109140 · Mariner's Harbor-Arlington-Graniteville · Last violation Jul 8, 2026 · Last complaint May 30, 2026

NeighborhoodMariner's Harbor-Arlington-Graniteville
More violations than 93% of nearby buildings
More violations than 93% of buildings and more complaints than 91% of buildings in Mariner's Harbor-Arlington-Graniteville. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 165 violations · 75 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
5 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous5Class Bhazardous8

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and fire safety.
    Worth checking · AI-assistedⓘ
    Look for droppings, live insects, or damage to walls, cabinets, and baseboards in the kitchen, bathroom, and under sinks. Check that apartment entry doors, stairwell doors, and fire escape access are all unlocked and open freely without obstruction.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Safety & fire — Blocked, unsafe, or inaccessible exits, hallways, stairs, or fire escape routes.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

Housing Preservation & Development Violations
Total violations since 2003
1,730
72 per year avg.↓ Down 36% in the last 2 years (165 vs 258 prior 2 yrs)
Open violations
13
Class C (immed. haz.)ⓘ5
Class B (hazardous)ⓘ8
Rent-impairingⓘ1
Housing Preservation & Development Complaints
Total complaints since 2003
1,887
79 per year avg.↓ Down 46% in the last 2 years (75 vs 139 prior 2 yrs)
Complaint Resolution
No access17%Violation issued24%No violation35%Phone resolved24%Other0%(1,887)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ160 violations
Egressⓘ94 violations
Paintingⓘ37 violations
Water Supplyⓘ36 violations
Cleaningⓘ33 violations
Carbon Monoxide Detecting Devicesⓘ30 violations
Smoke Detecting Devicesⓘ29 violations
Extermination & Rodent Eradicationⓘ24 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ128 complaints
Water & plumbingⓘ71 complaints
Mold & pestsⓘ37 complaints
Bldg maintenanceⓘ26 complaints
Appliancesⓘ8 complaints
Electricalⓘ6 complaints
Safety & fireⓘ3 complaints
Hide violations ↑See complaints →

Violation log

509 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
  • NYC HPD, ABCs of Housing 2024 (Tenants' Guide) — violation classes
  • NYC HPD, Penalties and Fees — correction deadlines
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Detector violations on record.
    Worth checking · AI-assistedⓘ
    Locate smoke detectors on the ceiling near bedrooms and in hallways, and ask the broker whether carbon monoxide detectors are present in the unit.
    details ▸

    Responsibility is split: the owner provides, installs, and replaces the detectors, while the tenant tests them monthly and replaces the batteries. An open violation means the owner has not yet certified to HPD that the condition was fixed, so a device may still be missing or dead at move-in. A tenant reimburses the owner for a newly installed device, $25 for a smoke or carbon monoxide detector and $50 for a combined unit, and is responsible for replacing one that goes missing or is damaged during the tenancy.

    On a viewing, look for a smoke alarm within fifteen feet of the door of each room used for sleeping, on the ceiling or just below it on the wall, and a carbon monoxide alarm at any height, including one plugged into a hallway outlet. Press the test button, and check that none have been painted over. A chirping alarm usually means a low battery, which is the tenant's to replace, but detectors also sound a separate end-of-life alarm when the device itself has to be replaced by the owner.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide) — the requirement
    • NYC HPD, Smoke, Carbon Monoxide, and Natural Gas Detectors — responsibilities, placement, and reimbursement
  • Open violation ages
    ▪ 30–90 days8% (1)
    ▪ 3–12 months62% (8)
    ▪ 1–3 years31% (4)
    Prior 4 yr.
    Immed. Emergency0%3%
    Emergency57%73%
    Non-Emergency43%24%
    (21)
    (282)
    Issued
    Description
    Class AClosed13KDec 30, 2020REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE BATHROOM LOCATED AT APT 13K, 13th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed2KDec 30, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN APT THROUGHOUT LOCATED AT APT 2K, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed8JDec 30, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 8J, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed5DDec 30, 2020REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 5th APARTMENT FROM WEST AT NORTH
    Class AClosed3MDec 30, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed5JDec 30, 2020TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 2 SQ FT AT THE CELING IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed3ADec 30, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL THE WALLS AND CEILING IN APT THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed3MDec 30, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL AND EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed10LDec 30, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 10L, 10th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Class AClosed—Dec 23, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY
    Class AClosed2DDec 3, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
    Class AClosed2DDec 3, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
    Class AClosed2DDec 3, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
    Class AClosed8ENov 25, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL IN THE BATHROOM LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed8ENov 19, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT SOUTH, THE FOYER , THE BATHROOM LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed8ENov 16, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed2DJul 29, 2020REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
    Class AClosed—Jun 24, 2020REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT BULIDING ENTRANCE DOOR , 1st STORY
    Class AClosed12HMar 31, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed12HMar 31, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed8LMar 4, 2020REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE DOOR IN THE ENTRANCE LOCATED AT APT 8L, 8th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Class AClosed5EFeb 21, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed5EFeb 21, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed5EFeb 21, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed5EFeb 21, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed—Feb 5, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING , 6th STORY
    Class AClosed—Feb 5, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B , 5th STORY
    Class AClosed—Feb 5, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING,PUBLIC HALL STAIRS B AT PUBLIC HALL, 3rd STORY
    Class AClosed—Feb 5, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B , 6th STORY
    Class AClosed—Feb 5, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, PUBLIC HALL STAIRS B , 5th STORY
    Class AClosed3DFeb 5, 2020TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING AND WEST WALL, APPROXIMATELY 6 SQ FT IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 4th APARTMENT FROM WEST AT NORTH
    Class AClosed—Feb 5, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B , 4th STORY
    Class AClosed—Feb 5, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH AND WEST WALLS, PUBLIC HALL STAIRS A , 9th STORY
    Class AClosed—Feb 5, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, PUBLIC HALL STAIR B , 4th STORY
    Class AClosed—Feb 5, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B AT PUBLIC HALL, 3rd STORY
    Class AClosed5EJan 29, 2020SECURE LOOSE MATTER · MAINTENANCE§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CLOSET DOORS IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed5EJan 29, 2020REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WALL LIGHT FIXTURE IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed5EJan 27, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed5EJan 27, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed5EJan 27, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL, EAST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed5EJan 23, 2020REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE LIGHT FIXTURE AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed5EJan 23, 2020REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOORS AT EAST WALL IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed5EJan 23, 2020REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed12HNov 27, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY , THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed7ENov 6, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed7ENov 6, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed4EOct 28, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT EAST, THE KITCHEN , THE BATHROOM , THE FOYER LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed5BOct 22, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed5BOct 22, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed9EOct 21, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE FOYER , THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 9E, 9th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 30, 2020Apt 13K
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE BATHROOM LOCATED AT APT 13K, 13th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 30, 2020Apt 2K
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN APT THROUGHOUT LOCATED AT APT 2K, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 30, 2020Apt 8J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 8J, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 30, 2020Apt 5D
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 5th APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 30, 2020Apt 3M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 30, 2020Apt 5J
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 2 SQ FT AT THE CELING IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 30, 2020Apt 3A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL THE WALLS AND CEILING IN APT THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 30, 2020Apt 3M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL AND EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 30, 2020Apt 10L
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 10L, 10th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 23, 2020
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY
    Class AClosed
    Dec 3, 2020Apt 2D
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 3, 2020Apt 2D
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 3, 2020Apt 2D
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
    Class AClosed
    Nov 25, 2020Apt 8E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL IN THE BATHROOM LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Nov 19, 2020Apt 8E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT SOUTH, THE FOYER , THE BATHROOM LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Nov 16, 2020Apt 8E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jul 29, 2020Apt 2D
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jun 24, 2020
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT BULIDING ENTRANCE DOOR , 1st STORY
    Class AClosed
    Mar 31, 2020Apt 12H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Mar 31, 2020Apt 12H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Mar 4, 2020Apt 8L
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT THE DOOR IN THE ENTRANCE LOCATED AT APT 8L, 8th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Feb 21, 2020Apt 5E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Feb 21, 2020Apt 5E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Feb 21, 2020Apt 5E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Feb 21, 2020Apt 5E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Feb 5, 2020
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING , 6th STORY
    Class AClosed
    Feb 5, 2020
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B , 5th STORY
    Class AClosed
    Feb 5, 2020
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING,PUBLIC HALL STAIRS B AT PUBLIC HALL, 3rd STORY
    Class AClosed
    Feb 5, 2020
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B , 6th STORY
    Class AClosed
    Feb 5, 2020
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, PUBLIC HALL STAIRS B , 5th STORY
    Class AClosed
    Feb 5, 2020Apt 3D
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING AND WEST WALL, APPROXIMATELY 6 SQ FT IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 4th APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 5, 2020
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B , 4th STORY
    Class AClosed
    Feb 5, 2020
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH AND WEST WALLS, PUBLIC HALL STAIRS A , 9th STORY
    Class AClosed
    Feb 5, 2020
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, PUBLIC HALL STAIR B , 4th STORY
    Class AClosed
    Feb 5, 2020
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B AT PUBLIC HALL, 3rd STORY
    Class AClosed
    Jan 29, 2020Apt 5E
    SECURE LOOSE MATTER · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CLOSET DOORS IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jan 29, 2020Apt 5E
    REPAIR · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WALL LIGHT FIXTURE IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jan 27, 2020Apt 5E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 27, 2020Apt 5E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 27, 2020Apt 5E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL, EAST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 23, 2020Apt 5E
    REPAIR · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE LIGHT FIXTURE AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 23, 2020Apt 5E
    REPAIR · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOORS AT EAST WALL IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 23, 2020Apt 5E
    REPAIR · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Nov 27, 2019Apt 12H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY , THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Nov 6, 2019Apt 7E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Nov 6, 2019Apt 7E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Oct 28, 2019Apt 4E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT EAST, THE KITCHEN , THE BATHROOM , THE FOYER LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Oct 22, 2019Apt 5B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 22, 2019Apt 5B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 21, 2019Apt 9E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE FOYER , THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 9E, 9th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Page 5 of 11
    ← PrevNext →