stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

164-10 84 AVENUE

Queens · ZIP 11432 · BIN 4210854 · Jamaica Hills-Briarwood · Last violation May 26, 2026 · Last complaint May 20, 2026

NeighborhoodJamaica Hills-Briarwood
More violations than 95% of nearby buildings
More violations than 95% of buildings and more complaints than 98% of buildings in Jamaica Hills-Briarwood. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 149 violations · 237 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
40 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous40Class Bhazardous45

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and fire safety.
    Worth checking · AI-assistedⓘ
    Look for droppings, live insects, or damage to walls, cabinets, and baseboards in the kitchen, bathroom, and under sinks. Check that apartment entry doors, stairwell doors, and fire escape access are all unlocked and open freely without obstruction.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Safety & fire — Blocked, unsafe, or inaccessible exits, hallways, stairs, or fire escape routes.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

Housing Preservation & Development Violations
Total violations since 2009
611
34 per year avg.↑ Up 610% in the last 2 years (149 vs 21 prior 2 yrs)
Open violations
103
Class C (immed. haz.)ⓘ40
Class B (hazardous)ⓘ45
Rent-impairingⓘ4
Housing Preservation & Development Complaints
Total complaints since 2003
713
30 per year avg.↑ Up 2863% in the last 2 years (237 vs 8 prior 2 yrs)
Complaint Resolution
No access11%Violation issued25%No violation29%Phone resolved35%Other0%(713)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ65 violations
Egressⓘ30 violations
Water Supplyⓘ18 violations
Extermination & Rodent Eradicationⓘ18 violations
Paintingⓘ13 violations
Smoke Detecting Devicesⓘ8 violations
Carbon Monoxide Detecting Devicesⓘ6 violations
Heat And Hot Waterⓘ6 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ225 complaints
Mold & pestsⓘ11 complaints
Water & plumbingⓘ4 complaints
Bldg maintenanceⓘ3 complaints
Hide violations ↑See complaints →

Violation log

101 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
  • NYC HPD, ABCs of Housing 2024 (Tenants' Guide) — violation classes
  • NYC HPD, Penalties and Fees — correction deadlines
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Detector violations on record.
    Worth checking · AI-assistedⓘ
    Locate smoke detectors on the ceiling near bedrooms and in hallways, and ask the broker whether carbon monoxide detectors are present in the unit.
    details ▸

    Responsibility is split: the owner provides, installs, and replaces the detectors, while the tenant tests them monthly and replaces the batteries. An open violation means the owner has not yet certified to HPD that the condition was fixed, so a device may still be missing or dead at move-in. A tenant reimburses the owner for a newly installed device, $25 for a smoke or carbon monoxide detector and $50 for a combined unit, and is responsible for replacing one that goes missing or is damaged during the tenancy.

    On a viewing, look for a smoke alarm within fifteen feet of the door of each room used for sleeping, on the ceiling or just below it on the wall, and a carbon monoxide alarm at any height, including one plugged into a hallway outlet. Press the test button, and check that none have been painted over. A chirping alarm usually means a low battery, which is the tenant's to replace, but detectors also sound a separate end-of-life alarm when the device itself has to be replaced by the owner.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide) — the requirement
    • NYC HPD, Smoke, Carbon Monoxide, and Natural Gas Detectors — responsibilities, placement, and reimbursement
  • Open violation ages
    ▪ 30–90 days4% (4)
    ▪ 3–12 months7% (7)
    ▪ 1–3 years29% (30)
    ▪ 3+ years60% (62)
    Prior 4 yr.
    Immed. Emergency0%1%
    Emergency95%94%
    Non-Emergency5%6%
    (61)
    (186)
    Issued
    Description
    Class AClosed1AApr 3, 2020RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed1AApr 2, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed6JMar 25, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 1st ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT WEST, THE PRIVATE HALLWAY , THE BATHROOM , THE KITCHEN LOCATED AT APT 6J, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
    Class AClosed6DMar 25, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 3rd ROOM FROM EAST, THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed1AMar 25, 2020REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed1AMar 23, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed—Mar 23, 2020REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT FIRE DOOR AT BOILER ROOM
    Class AClosed1AMar 23, 2020PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AOpen6BMar 3, 2020REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT ALL WINDOW SASHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed6BMar 3, 2020TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AROUND BATHTUB ( APPRX. 3 SQ. FT.) IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AOpen6BJan 10, 2020REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE EAST WINDOW AT SOUTH WALL . IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed6CJan 7, 2020REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE WINDOWS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6C, 6th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Class AClosed6CJan 7, 2020REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL NEAR WINDOW IN THE 1st LIVING ROOM FROM NORTH AT WEST LOCATED AT APT 6C, 6th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Class AClosed1MJan 6, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT CENTER, THE 2nd ROOM FROM NORTH AT EAST, THE FOYER , THE BATHROOM LOCATED AT APT 1M, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed1CJan 6, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN , THE 2nd PRIVATE HALLWAY , THE FOYER , THE 4th ROOM FROM EAST AT SOUTH, THE 4th ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 5th APARTMENT FROM EAST AT SOUTH
    Class AClosed5MJan 2, 2020PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ALL RADIATORS IN THE ENTIRE APARTMENT LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed5MJan 2, 2020PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ALL WINDOW FRAMES IN THE ENTIRE APARTMENT LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed1ADec 31, 2019REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT UPPER & LOWER WINDOW SASHES SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AOpen5MDec 31, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS & CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed5MDec 31, 2019RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR KNOBS IN THE BATHROOM LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed5MDec 31, 2019TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT DOOR NORTH WALL(APPRX. 3 SQ. FT.) IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed5MDec 31, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT DOOR AT NORTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed1ADec 31, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS & CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed5ADec 17, 2019REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL-TILES FLOOR IN THE KITCHEN LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed5ADec 17, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed5ADec 17, 2019REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed5ADec 17, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed4JDec 16, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed6DDec 16, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 2nd ROOM FROM NORTH AT WEST, THE FOYER LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed6DDec 16, 2019RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM IN THE KITCHEN LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed3HDec 9, 2019REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT ALL WINDOWS IN THE ENTIRE APARTMENT LOCATED AT APT 3H, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed3HDec 9, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE 2nd ROOM FROM EAST, THE BATHROOM LOCATED AT APT 3H, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed3HDec 9, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 3H, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed1KDec 9, 2019REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT ALL WINDOWS IN THE ENTIRE APARTMENT LOCATED AT APT 1K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed4HJul 29, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY , THE KITCHEN , THE BATHROOM , THE 2nd ROOM FROM EAST, THE 1st ROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed5BOct 2, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed—Jan 18, 2018POST GAS LEAK NOTICE · POSTING/SIGNAGE§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Class AClosed—Jan 18, 2018POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Class AClosed—Jul 5, 2017PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT EAST AND WEST AT THE BUILDING FRONT AT FIRE ESCAPE
    Class AOpen6KMar 28, 2017PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 1st ROOM FROM EAST AT SOUTH, THE PRIVATE HALLWAY , THE BATHROOM , THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed6KMar 28, 2017REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE ON LOWER SASH OF WINDOW AT NORTH IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed6KJun 9, 2015PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE PRIVATE HALLWAY , THE BATHROOM , THE KITCHEN , THE FOYER , THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3JOct 1, 2009REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE WALLS IN THE BATHROOM LOCATED AT APT 3J, 3rd STORY, APARTMENT AT NORTH
    Class AOpen2GOct 1, 2009PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed—Oct 1, 2009REMOVE ACCUMULATION OR RUBBISH · CLEANING§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE COMPACTOR CLOSET AT 3STY AT PUBLIC HALL
    Class AClosed2GOct 1, 2009PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen2GOct 1, 2009PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen2GOct 1, 2009PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed2GOct 1, 2009PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT EAST WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed2GOct 1, 2009PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Apr 3, 2020Apt 1A
    RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Apr 2, 2020Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Mar 25, 2020Apt 6J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 1st ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT WEST, THE PRIVATE HALLWAY , THE BATHROOM , THE KITCHEN LOCATED AT APT 6J, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
    Class AClosed
    Mar 25, 2020Apt 6D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 3rd ROOM FROM EAST, THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Mar 25, 2020Apt 1A
    REPAIR LEAKY FAUCETS · WATER SUPPLY
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Mar 23, 2020Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Mar 23, 2020
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT FIRE DOOR AT BOILER ROOM
    Class AClosed
    Mar 23, 2020Apt 1A
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AOpen
    Mar 3, 2020Apt 6B
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT ALL WINDOW SASHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Mar 3, 2020Apt 6B
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AROUND BATHTUB ( APPRX. 3 SQ. FT.) IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AOpen
    Jan 10, 2020Apt 6B
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT THE EAST WINDOW AT SOUTH WALL . IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 7, 2020Apt 6C
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT THE WINDOWS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6C, 6th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 7, 2020Apt 6C
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL NEAR WINDOW IN THE 1st LIVING ROOM FROM NORTH AT WEST LOCATED AT APT 6C, 6th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 6, 2020Apt 1M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT CENTER, THE 2nd ROOM FROM NORTH AT EAST, THE FOYER , THE BATHROOM LOCATED AT APT 1M, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 6, 2020Apt 1C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN , THE 2nd PRIVATE HALLWAY , THE FOYER , THE 4th ROOM FROM EAST AT SOUTH, THE 4th ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 5th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 2, 2020Apt 5M
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ALL RADIATORS IN THE ENTIRE APARTMENT LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 2, 2020Apt 5M
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ALL WINDOW FRAMES IN THE ENTIRE APARTMENT LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 31, 2019Apt 1A
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT UPPER & LOWER WINDOW SASHES SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AOpen
    Dec 31, 2019Apt 5M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS & CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 31, 2019Apt 5M
    RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR KNOBS IN THE BATHROOM LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 31, 2019Apt 5M
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT DOOR NORTH WALL(APPRX. 3 SQ. FT.) IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 31, 2019Apt 5M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT DOOR AT NORTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 31, 2019Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS & CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 17, 2019Apt 5A
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL-TILES FLOOR IN THE KITCHEN LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 17, 2019Apt 5A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 17, 2019Apt 5A
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 17, 2019Apt 5A
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 16, 2019Apt 4J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 16, 2019Apt 6D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 2nd ROOM FROM NORTH AT WEST, THE FOYER LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Dec 16, 2019Apt 6D
    RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM IN THE KITCHEN LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Dec 9, 2019Apt 3H
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT ALL WINDOWS IN THE ENTIRE APARTMENT LOCATED AT APT 3H, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 9, 2019Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE 2nd ROOM FROM EAST, THE BATHROOM LOCATED AT APT 3H, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 9, 2019Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 3H, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 9, 2019Apt 1K
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT ALL WINDOWS IN THE ENTIRE APARTMENT LOCATED AT APT 1K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 29, 2019Apt 4H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY , THE KITCHEN , THE BATHROOM , THE 2nd ROOM FROM EAST, THE 1st ROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 2, 2018Apt 5B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 18, 2018
    POST GAS LEAK NOTICE · POSTING/SIGNAGE
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Class AClosed
    Jan 18, 2018
    POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Class AClosed
    Jul 5, 2017
    PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION
    § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT EAST AND WEST AT THE BUILDING FRONT AT FIRE ESCAPE
    Class AOpen
    Mar 28, 2017Apt 6K
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 1st ROOM FROM EAST AT SOUTH, THE PRIVATE HALLWAY , THE BATHROOM , THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Mar 28, 2017Apt 6K
    REPAIR · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE ON LOWER SASH OF WINDOW AT NORTH IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jun 9, 2015Apt 6K
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE PRIVATE HALLWAY , THE BATHROOM , THE KITCHEN , THE FOYER , THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Oct 1, 2009Apt 3J
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE WALLS IN THE BATHROOM LOCATED AT APT 3J, 3rd STORY, APARTMENT AT NORTH
    Class AOpen
    Oct 1, 2009Apt 2G
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 1, 2009
    REMOVE ACCUMULATION OR RUBBISH · CLEANING
    § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE COMPACTOR CLOSET AT 3STY AT PUBLIC HALL
    Class AClosed
    Oct 1, 2009Apt 2G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Oct 1, 2009Apt 2G
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Oct 1, 2009Apt 2G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 1, 2009Apt 2G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT EAST WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 1, 2009Apt 2G
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Page 2 of 3
    ← PrevNext →