stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

2505 BEDFORD AVENUE

Brooklyn · ZIP 11226 · BIN 3119766 · East Flatbush-Erasmus · Last violation Aug 6, 2026 · Last complaint Aug 14, 2026

NeighborhoodEast Flatbush-Erasmus
More violations than 99% of nearby buildings
More violations than 99% of buildings and more complaints than 99% of buildings in East Flatbush-Erasmus. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
More activity recently than in past years
Last 2 yrs: 946 violations · 902 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
82 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous82Class Bhazardous66

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and building maintenance.
    Worth checking · AI-assistedⓘ
    Look along the baseboards and floor corners for droppings, dead insects, or sticky traps. Check cabinet and closet surfaces, pipes, and walls for water stains, peeling paint, or soft spots.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Bldg maintenance — General building repair, upkeep, and maintenance related housing code violations.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
Housing Preservation & Development Violations
Total violations since 1999
2,603
93 per year avg.↑ Up 17% in the last 2 years (946 vs 810 prior 2 yrs)
Open violations
181
Class C (immed. haz.)ⓘ82
Class B (hazardous)ⓘ66
Rent-impairingⓘ21
Housing Preservation & Development Complaints
Total complaints since 2003
2,201
92 per year avg.↑ Up 132% in the last 2 years (902 vs 388 prior 2 yrs)
Complaint Resolution
No access22%Violation issued26%No violation32%Phone resolved18%Other2%(2,201)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ745 violations
Extermination & Rodent Eradicationⓘ184 violations
Water Supplyⓘ161 violations
Paintingⓘ137 violations
Egressⓘ125 violations
Cleaningⓘ102 violations
Smoke Detecting Devicesⓘ77 violations
Carbon Monoxide Detecting Devicesⓘ71 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ344 complaints
Bldg maintenanceⓘ263 complaints
Water & plumbingⓘ239 complaints
Mold & pestsⓘ191 complaints
Safety & fireⓘ95 complaints
Electricalⓘ55 complaints
Appliancesⓘ48 complaints
Elevatorⓘ1 complaints
Hide violations ↑See complaints →

Violation log

427 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
— violation classes
  • NYC HPD, Penalties and Fees — correction deadlines
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Lead-paint violations on record.
    Worth checking · AI-assistedⓘ
    Look for paint that is peeling, chipped, or cracked on interior walls, trim, windows, doors, and door frames.
    details ▸

    Buildings built before 1960 may still contain lead-based paint, which causes behavioral and learning problems in young children, who can swallow dust and paint chips from windowsills and floors.

    If a child under six lives with you, or spends 10 or more hours a week in your apartment, tell the owner in writing, which is what obliges them to inspect annually. Report peeling paint, and call 311 if it is not fixed or if repair work is raising dust that is not being contained.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Open violation ages
    ▪ < 30 days18% (33)
    ▪ 30–90 days11% (20)
    ▪ 3–12 months49% (88)
    ▪ 1–3 years16% (28)
    ▪ 3+ years6% (10)
    Prior 4 yr.
    Immed. Emergency2%3%
    Emergency51%64%
    Non-Emergency46%33%
    (639)
    (731)
    Issued
    Description
    Class AClosed3GOct 7, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR. IN THE KITCHEN LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed—Sep 30, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY
    Class AClosed1ESep 19, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER SASH WINDOW AT EAST IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed1ESep 19, 2024WATERPROOF FLOOR OF WATER CLOSET · SANITARY FACILITIES§ 27-2064 ADM CODE PROVIDE IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT A WATERPROOF FLOOR AND BASE FOR THE WATER CLOSET , IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosedRENT IMPAIRING1ESep 19, 2024LEAKY FLUSH PIPE CONNECTION · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed1ESep 18, 2024RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed6BSep 18, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed6BSep 18, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed6BSep 18, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed6BSep 18, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed5EAug 28, 2024REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT RISER IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed6HAug 28, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed6HAug 28, 2024RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed5HAug 28, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM IN THE FOYER LOCATED AT APT 5H, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed5BAug 5, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST
    Class AClosed—Jul 22, 2024PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES, ALL MEMBERS AT 2ND FIRE ESCAPE FROM NORTH AT WEST WALL AT FIRE ESCAPE
    Class AClosed—Jul 22, 2024PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES, ALL MEMBERS AT 1ST FIRE ESCAPE FROM NORTH AT WEST WALL AT FIRE ESCAPE
    Class AClosed4BJul 16, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed4BJul 16, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed4HJul 1, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH WALL WEST WALL AND CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Class AClosed4HJul 1, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Class AClosed2DJul 1, 2024RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed4GJul 1, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER PIPE AT EAST IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed4GJul 1, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed4HJul 1, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION 1ST RISER FROM NORTH AT EAST IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Class AClosed4HJul 1, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1ST RISER FROM SOUTH AT WEST IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Class AClosed4HJul 1, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1ST RISER FROM EAST AT SOUTH IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Class AClosed4GJul 1, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed2DJul 1, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER PIPE AT EAST IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed4GJul 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed3DJun 24, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 2 SQ FT AT THE NORTH WALL IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed3DJun 24, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed3DJun 24, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed3DJun 24, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed6FMay 2, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed6FMay 2, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 2nd CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed6FMay 2, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed6FMay 2, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed6FMay 2, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed6FMay 2, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE ENTRANCE LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed6FMay 2, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM WEST AT NORTH WALL IN THE ENTRANCE LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed1EMay 1, 2024RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 1E, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed—Apr 12, 2024PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL BALCONIES ALL STORIES FIRE ESCAPES FRONT OF BUILDING
    Class AClosed6FMar 19, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE KITCHEN LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosedRENT IMPAIRING1EMar 4, 2024LEAKY FLUSH PIPE CONNECTION · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION ... IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed2GFeb 23, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM NORTH LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed2GFeb 23, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3 SQ FT AT WINDOW FRAME IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed5EFeb 13, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATLY 4 SQFT OF MOLD AT WEST WALL AND APPROXIMATLY 4STFT OF MOLD AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 5E, 5th STORY
    Class AClosed6BFeb 13, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 6SQ FT AT WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST
    Class AClosed5EFeb 6, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 4 SQ FT AT SOUTH AND WEST WALLS IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Oct 7, 2024Apt 3G
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR. IN THE KITCHEN LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Sep 30, 2024
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY
    Class AClosed
    Sep 19, 2024Apt 1E
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER SASH WINDOW AT EAST IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Sep 19, 2024Apt 1E
    WATERPROOF FLOOR OF WATER CLOSET · SANITARY FACILITIES
    § 27-2064 ADM CODE PROVIDE IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT A WATERPROOF FLOOR AND BASE FOR THE WATER CLOSET , IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosedRENT IMPAIRING
    Sep 19, 2024Apt 1E
    LEAKY FLUSH PIPE CONNECTION · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Sep 18, 2024Apt 1E
    RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Sep 18, 2024Apt 6B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Sep 18, 2024Apt 6B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Sep 18, 2024Apt 6B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Sep 18, 2024Apt 6B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Aug 28, 2024Apt 5E
    REPLACE · MAINTENANCE
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT RISER IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Aug 28, 2024Apt 6H
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Aug 28, 2024Apt 6H
    RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Aug 28, 2024Apt 5H
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM IN THE FOYER LOCATED AT APT 5H, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Aug 5, 2024Apt 5B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST
    Class AClosed
    Jul 22, 2024
    PAINT METAL · PAINTING
    § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES, ALL MEMBERS AT 2ND FIRE ESCAPE FROM NORTH AT WEST WALL AT FIRE ESCAPE
    Class AClosed
    Jul 22, 2024
    PAINT METAL · PAINTING
    § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES, ALL MEMBERS AT 1ST FIRE ESCAPE FROM NORTH AT WEST WALL AT FIRE ESCAPE
    Class AClosed
    Jul 16, 2024Apt 4B
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jul 16, 2024Apt 4B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jul 1, 2024Apt 4H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH WALL WEST WALL AND CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Class AClosed
    Jul 1, 2024Apt 4H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Class AClosed
    Jul 1, 2024Apt 2D
    RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jul 1, 2024Apt 4G
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER PIPE AT EAST IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jul 1, 2024Apt 4G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jul 1, 2024Apt 4H
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION 1ST RISER FROM NORTH AT EAST IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Class AClosed
    Jul 1, 2024Apt 4H
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1ST RISER FROM SOUTH AT WEST IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Class AClosed
    Jul 1, 2024Apt 4H
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1ST RISER FROM EAST AT SOUTH IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Class AClosed
    Jul 1, 2024Apt 4G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jul 1, 2024Apt 2D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER PIPE AT EAST IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jul 1, 2024Apt 4G
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jun 24, 2024Apt 3D
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 2 SQ FT AT THE NORTH WALL IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jun 24, 2024Apt 3D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jun 24, 2024Apt 3D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jun 24, 2024Apt 3D
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    May 2, 2024Apt 6F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    May 2, 2024Apt 6F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 2nd CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    May 2, 2024Apt 6F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    May 2, 2024Apt 6F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    May 2, 2024Apt 6F
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    May 2, 2024Apt 6F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE ENTRANCE LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    May 2, 2024Apt 6F
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM WEST AT NORTH WALL IN THE ENTRANCE LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    May 1, 2024Apt 1E
    RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 1E, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Apr 12, 2024
    PAINT METAL · PAINTING
    § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL BALCONIES ALL STORIES FIRE ESCAPES FRONT OF BUILDING
    Class AClosed
    Mar 19, 2024Apt 6F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE KITCHEN LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosedRENT IMPAIRING
    Mar 4, 2024Apt 1E
    LEAKY FLUSH PIPE CONNECTION · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION ... IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Feb 23, 2024Apt 2G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM NORTH LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 23, 2024Apt 2G
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3 SQ FT AT WINDOW FRAME IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 13, 2024Apt 5E
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATLY 4 SQFT OF MOLD AT WEST WALL AND APPROXIMATLY 4STFT OF MOLD AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 5E, 5th STORY
    Class AClosed
    Feb 13, 2024Apt 6B
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 6SQ FT AT WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST
    Class AClosed
    Feb 6, 2024Apt 5E
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 4 SQ FT AT SOUTH AND WEST WALLS IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Page 4 of 9
    ← PrevNext →