stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

755 OCEAN AVENUE

Brooklyn · ZIP 11226 · BIN 3118550 · Flatbush · Last violation Aug 10, 2026 · Last complaint Aug 13, 2026

NeighborhoodFlatbush
More violations than 95% of nearby buildings
More violations than 95% of buildings and more complaints than 96% of buildings in Flatbush. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 956 violations · 1262 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
71 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous71Class Bhazardous205

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and building maintenance.
    Worth checking · AI-assistedⓘ
    Look along the baseboards and floor corners for droppings, dead insects, or sticky traps. Check cabinet and closet surfaces, pipes, and walls for water stains, peeling paint, or soft spots.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Bldg maintenance — General building repair, upkeep, and maintenance related housing code violations.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
Housing Preservation & Development Violations
Total violations since 1991
3,466
96 per year avg.↑ Up 110% in the last 2 years (956 vs 456 prior 2 yrs)
Open violations
340
Class C (immed. haz.)ⓘ71
Class B (hazardous)ⓘ205
Rent-impairingⓘ14
Housing Preservation & Development Complaints
Total complaints since 2003
3,303
138 per year avg.↑ Up 689% in the last 2 years (1,262 vs 160 prior 2 yrs)
Complaint Resolution
No access17%Violation issued35%No violation42%Phone resolved5%Other0%(3,303)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ636 violations
Paintingⓘ241 violations
Lead-Based Paintⓘ161 violations
Extermination & Rodent Eradicationⓘ127 violations
Water Supplyⓘ111 violations
Cleaningⓘ102 violations
Egressⓘ65 violations
Carbon Monoxide Detecting Devicesⓘ36 violations
Top complaint groupsⓘ
5 yrsAll time
Bldg maintenanceⓘ337 complaints
Mold & pestsⓘ273 complaints
Water & plumbingⓘ267 complaints
Electricalⓘ122 complaints
Heat / hot waterⓘ87 complaints
Safety & fireⓘ67 complaints
Appliancesⓘ36 complaints
Outdoor / structuralⓘ2 complaints
Elevatorⓘ1 complaints
Hide violations ↑See complaints →

Violation log

774 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
— violation classes
  • NYC HPD, Penalties and Fees — correction deadlines
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Lead-paint violations on record.
    Worth checking · AI-assistedⓘ
    Look for paint that is peeling, chipped, or cracked on interior walls, trim, windows, doors, and door frames.
    details ▸

    Buildings built before 1960 may still contain lead-based paint, which causes behavioral and learning problems in young children, who can swallow dust and paint chips from windowsills and floors.

    If a child under six lives with you, or spends 10 or more hours a week in your apartment, tell the owner in writing, which is what obliges them to inspect annually. Report peeling paint, and call 311 if it is not fixed or if repair work is raising dust that is not being contained.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Open violation ages
    ▪ < 30 days4% (12)
    ▪ 30–90 days6% (21)
    ▪ 3–12 months26% (90)
    ▪ 1–3 years56% (189)
    ▪ 3+ years8% (28)
    Prior 4 yr.
    Immed. Emergency2%3%
    Emergency36%38%
    Non-Emergency62%59%
    (554)
    (992)
    Issued
    Description
    Class AClosed5EJul 8, 2025REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT JOINTS OF THE CERAMIC TILES AT EAST WALL, IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
    Class AClosed5EJul 7, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Class AOpen6IJun 27, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 6I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed—Jun 10, 2025FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Class AOpen6PMay 27, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed6BMay 27, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 6B, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed6BApr 4, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed4MMar 7, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed4MMar 7, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed4MMar 7, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE BATHROOM , THE 5th ROOM FROM NORTH, THE KITCHEN , THE 4th ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT EAST, THE PRIVATE HALLWAY LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen5IMar 3, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5I, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Class AClosed5IMar 3, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5I, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Class AClosed4BFeb 19, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Class AClosed5BFeb 19, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Class AClosed5BFeb 19, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Class AClosed6BFeb 13, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL. IN THE FOYER LOCATED AT APT 6B, 6th STORY
    Class AClosed6BFeb 13, 2025REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST, SOUTH, AND WEST WALL. IN THE BATHROOM LOCATED AT APT 6B, 6th STORY
    Class AClosed6BFeb 13, 2025REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY
    Class AClosed6BFeb 13, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 6B, 6th STORY
    Class AClosed6BFeb 13, 2025REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 6B, 6th STORY
    Class AClosed6BFeb 13, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY
    Class AClosed—Feb 6, 2025POST AND MAINTAIN A NOTICE · POSTING/SIGNAGE§27-2153 ADM CODE POST AND MAINTAIN A NOTICE, WRITTEN IN ENGLISH AND IN SPANISH, ON THE BUILDING ENTRANCE DOOR OR OTHER CONSPICUOUS LOCATION IN THE BUILDING COMMON AREA, STATING THAT: (1) THE BUILDING IS IN THE ALTERNATIVE ENFORCEMENT PROGRAM, (2) THAT OCCUPANTS MAY CALL 311 OR THE AEP AT 212-863-8262 TO REPORT HOUSING MAINTENANCE COMPLAINTS, (3) THE NAME, TELEPHONE, AND ADDRESS OF THE OWNER, AND, (4) THE IDENTITY OF ANY FINANCIAL INSTITUTION THAT HOLDS A MORTGAGE ON THE PROPERTY. POST AT PUBLIC HALL, 1st STORY
    Class AClosed4MJan 13, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed3MJan 13, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT CENTER, THE KITCHEN , THE 1st BATHROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH, THE 4th ROOM FROM NORTH AT WEST, THE 2nd PRIVATE HALLWAY FROM NORTH, THE 2nd BATHROOM FROM NORTH LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed4MJan 13, 2025CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD ON CERAMIC TILES AT ALL WALLS AND CEILING IN THE SHOWER ENCLOSURE IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed2GDec 27, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT AT EAST WALL IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed4MDec 3, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MDec 3, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MDec 3, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MDec 3, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE IN THE 2nd ROOM FROM EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 1st BATHROOM FROM EAST AT NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed4MNov 29, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT (LESS THAN 10 SQFT) 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 4th BATHROOM FROM NORTH AT EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed4MNov 29, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 4th BATHROOM FROM NORTH AT EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL, WEST WALL, NORTH WALL, EAST WALL IN THE 4th BATHROOM FROM NORTH AT EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 4th ROOM FROM EAST AT CENTER LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FROM WEST AT NORTH WALL, NORTH WALL, EAST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL, NORTH WALL, 1st RISER FROM SOUTH AT WEST WALL, CEILING IN THE 3rd BATHROOM FROM EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, 1st RISER FROM NORTH AT EAST WALL, NORTH WALL, SOUTH WALL IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd CLOSET FROM NORTH AT EAST WALL DOOR, 2nd CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE 2nd PRIVATE HALLWAY FROM EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM SOUTH AT WEST WALL, WEST WALL, EAST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed4MNov 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed2PNov 21, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE KITCHEN LOCATED AT APT 2P, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed2PNov 21, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2P, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AOpen4MNov 8, 2024REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT RISER CEILING. IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed4MOct 21, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 2nd WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed—Oct 7, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, SOUTH AND NORTH WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORY
    Class AClosed
    Jul 8, 2025Apt 5E
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT JOINTS OF THE CERAMIC TILES AT EAST WALL, IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
    Class AClosed
    Jul 7, 2025Apt 5E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Class AOpen
    Jun 27, 2025Apt 6I
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 6I, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jun 10, 2025
    FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Class AOpen
    May 27, 2025Apt 6P
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    May 27, 2025Apt 6B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 6B, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Apr 4, 2025Apt 6B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Mar 7, 2025Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Mar 7, 2025Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Mar 7, 2025Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE BATHROOM , THE 5th ROOM FROM NORTH, THE KITCHEN , THE 4th ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT EAST, THE PRIVATE HALLWAY LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Mar 3, 2025Apt 5I
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5I, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Class AClosed
    Mar 3, 2025Apt 5I
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5I, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Class AClosed
    Feb 19, 2025Apt 4B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Class AClosed
    Feb 19, 2025Apt 5B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Class AClosed
    Feb 19, 2025Apt 5B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Class AClosed
    Feb 13, 2025Apt 6B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL. IN THE FOYER LOCATED AT APT 6B, 6th STORY
    Class AClosed
    Feb 13, 2025Apt 6B
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST, SOUTH, AND WEST WALL. IN THE BATHROOM LOCATED AT APT 6B, 6th STORY
    Class AClosed
    Feb 13, 2025Apt 6B
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY
    Class AClosed
    Feb 13, 2025Apt 6B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 6B, 6th STORY
    Class AClosed
    Feb 13, 2025Apt 6B
    REPAIR LEAKY FAUCETS · WATER SUPPLY
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 6B, 6th STORY
    Class AClosed
    Feb 13, 2025Apt 6B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY
    Class AClosed
    Feb 6, 2025
    POST AND MAINTAIN A NOTICE · POSTING/SIGNAGE
    §27-2153 ADM CODE POST AND MAINTAIN A NOTICE, WRITTEN IN ENGLISH AND IN SPANISH, ON THE BUILDING ENTRANCE DOOR OR OTHER CONSPICUOUS LOCATION IN THE BUILDING COMMON AREA, STATING THAT: (1) THE BUILDING IS IN THE ALTERNATIVE ENFORCEMENT PROGRAM, (2) THAT OCCUPANTS MAY CALL 311 OR THE AEP AT 212-863-8262 TO REPORT HOUSING MAINTENANCE COMPLAINTS, (3) THE NAME, TELEPHONE, AND ADDRESS OF THE OWNER, AND, (4) THE IDENTITY OF ANY FINANCIAL INSTITUTION THAT HOLDS A MORTGAGE ON THE PROPERTY. POST AT PUBLIC HALL, 1st STORY
    Class AClosed
    Jan 13, 2025Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed
    Jan 13, 2025Apt 3M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT CENTER, THE KITCHEN , THE 1st BATHROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH, THE 4th ROOM FROM NORTH AT WEST, THE 2nd PRIVATE HALLWAY FROM NORTH, THE 2nd BATHROOM FROM NORTH LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jan 13, 2025Apt 4M
    CLEANSE · CLEANING
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD ON CERAMIC TILES AT ALL WALLS AND CEILING IN THE SHOWER ENCLOSURE IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed
    Dec 27, 2024Apt 2G
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT AT EAST WALL IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Dec 3, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Dec 3, 2024Apt 4M
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Dec 3, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Dec 3, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE IN THE 2nd ROOM FROM EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 1st BATHROOM FROM EAST AT NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed
    Nov 29, 2024Apt 4M
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT (LESS THAN 10 SQFT) 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 4th BATHROOM FROM NORTH AT EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed
    Nov 29, 2024Apt 4M
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 4th BATHROOM FROM NORTH AT EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL, WEST WALL, NORTH WALL, EAST WALL IN THE 4th BATHROOM FROM NORTH AT EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 4th ROOM FROM EAST AT CENTER LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FROM WEST AT NORTH WALL, NORTH WALL, EAST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL, NORTH WALL, 1st RISER FROM SOUTH AT WEST WALL, CEILING IN THE 3rd BATHROOM FROM EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, 1st RISER FROM NORTH AT EAST WALL, NORTH WALL, SOUTH WALL IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd CLOSET FROM NORTH AT EAST WALL DOOR, 2nd CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE 2nd PRIVATE HALLWAY FROM EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM SOUTH AT WEST WALL, WEST WALL, EAST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''755'', 1st FROM EAST AT SOUTH
    Class AClosed
    Nov 29, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed
    Nov 21, 2024Apt 2P
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE KITCHEN LOCATED AT APT 2P, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed
    Nov 21, 2024Apt 2P
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2P, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AOpen
    Nov 8, 2024Apt 4M
    REPLACE · MAINTENANCE
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT RISER CEILING. IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Oct 21, 2024Apt 4M
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 2nd WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Oct 7, 2024
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, SOUTH AND NORTH WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORY
    Page 4 of 16
    ← PrevNext →