Class AClosed
Jun 14, 2024Apt 1G
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
Class BClosed
Jun 14, 2024Apt 1G
REPAIR OR REPLACE CO DETECTOR · CARBON MONOXIDE DETECTING DEVICES
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
Class BClosed
Jun 14, 2024Apt 1G
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET COVER AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
Class BClosed
May 31, 2024Apt 6B
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKING DEVICES AT ENTRANCE DOOR IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class BClosed
May 31, 2024Apt 6B
REPAIR OR REPLACE SMOKE DETECTOR · SMOKE DETECTING DEVICES
§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class CClosedRENT IMPAIRING
May 31, 2024Apt 6B
LEAKY ROOF · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class CClosedRENT IMPAIRING
May 31, 2024Apt 6B
LEAKY ROOF · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVRR THE NORTH WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed
May 31, 2024Apt 6B
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed
May 31, 2024Apt 6B
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT ( APPROXIMATELY 2 SQFT) CEILING IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class CClosed
May 31, 2024Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE 1st CLOSET FROM EAST AT SOUTH WALL CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed
May 31, 2024Apt 6B
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class CClosed
May 31, 2024Apt 6B
INSTALL/REPLACE/REPAIR WINDOW GUARDS (APT) · WINDOW GUARDS
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class BClosedRENT IMPAIRING
May 31, 2024Apt 6B
LEAKY ROOF · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE. NORTH WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class BClosedRENT IMPAIRING
May 31, 2024Apt 6B
LEAKY ROOF · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE WEST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed
May 31, 2024Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed
May 31, 2024Apt 6B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHENETTE , THE PRIVATE HALLWAY , THE 1st ROOM FROM NORTH, THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed
May 31, 2024Apt 6B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL, WEST WALL, CEILING, 1st CLOSET FROM EAST AT SOUTH WALL CEILING, EAST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class CClosed
May 31, 2024Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed
May 31, 2024Apt 6B
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT( APPROXIMATELY 3SQFT ) CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class BClosedRENT IMPAIRING
May 31, 2024Apt 6B
LEAKY ROOF · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class BClosedRENT IMPAIRING
May 31, 2024Apt 6B
LEAKY ROOF · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK THE CEILING IN THE KITCHENETTE LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class BClosed
May 31, 2024Apt 6B
REPAIR OR REPLACE CO DETECTOR · CARBON MONOXIDE DETECTING DEVICES
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed
May 31, 2024Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class BClosed
May 31, 2024Apt 6B
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE FUSE BOX AT WEST WALL WITH OPEN SLOT IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class BClosed
May 31, 2024Apt 6B
SECURE LOOSE MATTER · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class CClosed
May 31, 2024Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed
May 31, 2024Apt 6B
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT( APPROXIMATRLY 1S1FT ) 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class CClosedRENT IMPAIRING
May 31, 2024Apt 6B
LEAKY ROOF · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK THE CEILING 1st CLOSET FROM EAST AT SOUTH WALL CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed
May 20, 2024Apt 6B
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1 SQ FT AT THE CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class BClosed
May 20, 2024Apt 6B
REPAIR OR REPLACE CO DETECTOR · CARBON MONOXIDE DETECTING DEVICES
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class BClosed
May 20, 2024Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
May 20, 2024Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE 1st CLOSET FROM EAST AT SOUTH WALL CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
May 20, 2024Apt 6B
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1 SQ FT AT THE WEST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
May 20, 2024Apt 6B
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1 SQ FT AT THE CEILING IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class BClosedRENT IMPAIRING
May 20, 2024Apt 6B
LEAKY ROOF · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE 1st CLOSET FROM EAST AT SOUTH WALL CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
May 20, 2024Apt 6B
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 2 SQ FT AT THE NORTH WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class BClosed
May 20, 2024Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
May 20, 2024Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHENETTE LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class BClosed
May 20, 2024Apt 6B
REPAIR OR REPLACE SMOKE DETECTOR · SMOKE DETECTING DEVICES
§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
May 20, 2024Apt 6B
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHENETTE , THE BATHROOM , THE FOYER LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class BClosed
May 20, 2024Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class BClosedRENT IMPAIRING
May 20, 2024Apt 6B
LEAKY ROOF · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
Apr 30, 2024Apt 1D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class BClosed
Apr 30, 2024Apt 1D
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND WEST WALL APPROX 10 SQ FT IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class BClosed
Apr 30, 2024Apt 1D
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN BASE CABINET AT NORTH IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class BClosed
Apr 30, 2024Apt 1D
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class BClosed
Apr 30, 2024Apt 1D
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class BClosed
Apr 30, 2024Apt 1D
REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Apr 30, 2024Apt 1D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class BClosed
Apr 18, 2024Apt 1D
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN NORTH 1 CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM WEST AT NORTH