stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

93 LINDEN BOULEVARD

Brooklyn · ZIP 11226 · BIN 3116662 · East Flatbush-Erasmus · Last violation May 19, 2026 · Last complaint Aug 11, 2026

NeighborhoodEast Flatbush-Erasmus
More violations than 81% of nearby buildings
More violations than 81% of buildings and more complaints than 97% of buildings in East Flatbush-Erasmus. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 158 violations · 600 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
45 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous45Class Bhazardous83

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and heat and hot water.
    Worth checking · AI-assistedⓘ
    Look in corners, under sinks, and along baseboards for droppings, live insects, or evidence of gnawing; turn on faucets and check whether hot water arrives within a minute.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Heat / hot water — Lack of heat, hot water, or heating system related issues affecting tenants.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
Housing Preservation & Development Violations
Total violations since 1990
1,706
46 per year avg.↓ Down 50% in the last 2 years (158 vs 313 prior 2 yrs)
Open violations
138
Class C (immed. haz.)ⓘ45
Class B (hazardous)ⓘ83
Rent-impairingⓘ7
Housing Preservation & Development Complaints
Total complaints since 2003
4,861
203 per year avg.↓ Down 41% in the last 2 years (600 vs 1,023 prior 2 yrs)
Complaint Resolution
No access13%Violation issued15%No violation22%Phone resolved49%Other0%(4,861)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ196 violations
Egressⓘ53 violations
Paintingⓘ46 violations
Water Supplyⓘ44 violations
Extermination & Rodent Eradicationⓘ43 violations
Heat And Hot Waterⓘ40 violations
Lead-Based Paintⓘ22 violations
Cleaningⓘ21 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ1,613 complaints
Bldg maintenanceⓘ115 complaints
Water & plumbingⓘ90 complaints
Mold & pestsⓘ63 complaints
Safety & fireⓘ12 complaints
Electricalⓘ10 complaints
Appliancesⓘ2 complaints
Outdoor / structuralⓘ1 complaints
Hide violations ↑See complaints →

Violation log

393 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
— violation classes
  • NYC HPD, Penalties and Fees — correction deadlines
  • Lead-paint violations on record.
    Worth checking · AI-assistedⓘ
    Look for paint that is peeling, chipped, or cracked on interior walls, trim, windows, doors, and door frames.
    details ▸

    Buildings built before 1960 may still contain lead-based paint, which causes behavioral and learning problems in young children, who can swallow dust and paint chips from windowsills and floors.

    If a child under six lives with you, or spends 10 or more hours a week in your apartment, tell the owner in writing, which is what obliges them to inspect annually. Report peeling paint, and call 311 if it is not fixed or if repair work is raising dust that is not being contained.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Detector violations on record.
    Worth checking · AI-assistedⓘ
    Locate smoke detectors on the ceiling near bedrooms and in hallways, and ask the broker whether carbon monoxide detectors are present in the unit.
    details ▸

    Responsibility is split: the owner provides, installs, and replaces the detectors, while the tenant tests them monthly and replaces the batteries. An open violation means the owner has not yet certified to HPD that the condition was fixed, so a device may still be missing or dead at move-in. A tenant reimburses the owner for a newly installed device, $25 for a smoke or carbon monoxide detector and $50 for a combined unit, and is responsible for replacing one that goes missing or is damaged during the tenancy.

    On a viewing, look for a smoke alarm within fifteen feet of the door of each room used for sleeping, on the ceiling or just below it on the wall, and a carbon monoxide alarm at any height, including one plugged into a hallway outlet. Press the test button, and check that none have been painted over. A chirping alarm usually means a low battery, which is the tenant's to replace, but detectors also sound a separate end-of-life alarm when the device itself has to be replaced by the owner.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide) — the requirement
    • NYC HPD, Smoke, Carbon Monoxide, and Natural Gas Detectors — responsibilities, placement, and reimbursement
  • Open violation ages
    ▪ 3–12 months11% (15)
    ▪ 1–3 years34% (47)
    ▪ 3+ years55% (76)
    Prior 4 yr.
    Immed. Emergency0%0%
    Emergency91%90%
    Non-Emergency8%9%
    (293)
    (1,653)
    Issued
    Description
    Class AClosed14CApr 25, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed14CApr 25, 2013PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed14CApr 25, 2013REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed14CApr 25, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL, BASEBOARD AT WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed14CApr 25, 2013PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed14CApr 25, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed14CApr 25, 2013REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed14CApr 25, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st DOOR FROM WEST AT NORTH WALL IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed14CApr 25, 2013REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed24BApr 12, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 24B, 2nd STORY, APARTMENT AT SOUTH
    Class AClosed24BApr 12, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 24B, 2nd STORY
    Class AClosed60BMar 4, 2013REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 60B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed60BMar 4, 2013REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, WEST WALL, SOUTH WALL IN THE BATHROOM LOCATED AT APT 60B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed60BMar 4, 2013REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 60B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed60BMar 4, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST, THE 3rd ROOM FROM EAST LOCATED AT APT 60B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed43BJan 22, 2013PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed43BJan 22, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed43BJan 22, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed43BJan 22, 2013PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed43BJan 22, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed43BJan 22, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR IN THE FOYER LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosedRENT IMPAIRING43BJan 22, 2013REPAIR FLUSHING APPARATUS OF WATER CLOSET · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed34COct 11, 2012REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 34C, 3rd STORY, APARTMENT AT WEST , SECTION AT NORTH
    Class AClosed34COct 11, 2012REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 34C, 3rd STORY, APARTMENT AT WEST , SECTION AT NORTH
    Class AClosed34COct 11, 2012REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE KITCHEN LOCATED AT APT 34C, 3rd STORY, APARTMENT AT WEST
    Class AClosed34COct 11, 2012REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 34C, 3rd STORY, APARTMENT AT WEST
    Class AClosed30AAug 23, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 1st RISER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed30AAug 23, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL, WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed30AAug 23, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 2nd WINDOW FRAME FROM EAST AT SOUTH WALL, EAST WALL, BASEBOARD AT EAST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed30AAug 23, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 4th BATHROOM FROM EAST, THE 2nd ROOM FROM EAST AT NORTH, THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed30AAug 23, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 3rd CLOSET FROM SOUTH AT WEST WALL DOOR, 2nd CLOSET FROM SOUTH AT WEST WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed30AAug 23, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed—Jul 9, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY
    Class AClosed33BMay 29, 2012REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 33B, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , 2nd SECTION FROM WEST AT NORTH
    Class AClosed33BMay 29, 2012PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION METAL DOOR IN THE ENTRANCE LOCATED AT APT 33B, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , 2nd SECTION FROM WEST AT NORTH
    Class AClosed55AMay 4, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW FRAME AT NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 55A, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed61AFeb 21, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 61A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed61AFeb 21, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 61A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed61AFeb 21, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 61A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed55ADec 21, 2011PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 2nd WINDOW FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 55A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed55ADec 7, 2011PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST LOCATED AT APT 55A, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed55AOct 14, 2011PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE 3rd ROOM FROM EAST, THE KITCHEN , THE BATHROOM LOCATED AT APT 55A, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed40ANov 26, 2010PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 40A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    Apr 25, 2013Apt 14C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 25, 2013Apt 14C
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 25, 2013Apt 14C
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 25, 2013Apt 14C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL, BASEBOARD AT WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 25, 2013Apt 14C
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 25, 2013Apt 14C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 25, 2013Apt 14C
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 25, 2013Apt 14C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st DOOR FROM WEST AT NORTH WALL IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 25, 2013Apt 14C
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 12, 2013Apt 24B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 24B, 2nd STORY, APARTMENT AT SOUTH
    Class AClosed
    Apr 12, 2013Apt 24B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 24B, 2nd STORY
    Class AClosed
    Mar 4, 2013Apt 60B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 60B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Mar 4, 2013Apt 60B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, WEST WALL, SOUTH WALL IN THE BATHROOM LOCATED AT APT 60B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Mar 4, 2013Apt 60B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 60B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Mar 4, 2013Apt 60B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST, THE 3rd ROOM FROM EAST LOCATED AT APT 60B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jan 22, 2013Apt 43B
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Jan 22, 2013Apt 43B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Jan 22, 2013Apt 43B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Jan 22, 2013Apt 43B
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Jan 22, 2013Apt 43B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Jan 22, 2013Apt 43B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR IN THE FOYER LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosedRENT IMPAIRING
    Jan 22, 2013Apt 43B
    REPAIR FLUSHING APPARATUS OF WATER CLOSET · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Oct 11, 2012Apt 34C
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 34C, 3rd STORY, APARTMENT AT WEST , SECTION AT NORTH
    Class AClosed
    Oct 11, 2012Apt 34C
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 34C, 3rd STORY, APARTMENT AT WEST , SECTION AT NORTH
    Class AClosed
    Oct 11, 2012Apt 34C
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE KITCHEN LOCATED AT APT 34C, 3rd STORY, APARTMENT AT WEST
    Class AClosed
    Oct 11, 2012Apt 34C
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 34C, 3rd STORY, APARTMENT AT WEST
    Class AClosed
    Aug 23, 2012Apt 30A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 1st RISER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Aug 23, 2012Apt 30A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL, WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Aug 23, 2012Apt 30A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 2nd WINDOW FRAME FROM EAST AT SOUTH WALL, EAST WALL, BASEBOARD AT EAST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Aug 23, 2012Apt 30A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 4th BATHROOM FROM EAST, THE 2nd ROOM FROM EAST AT NORTH, THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Aug 23, 2012Apt 30A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 3rd CLOSET FROM SOUTH AT WEST WALL DOOR, 2nd CLOSET FROM SOUTH AT WEST WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Aug 23, 2012Apt 30A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 30A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 9, 2012
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY
    Class AClosed
    May 29, 2012Apt 33B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 33B, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , 2nd SECTION FROM WEST AT NORTH
    Class AClosed
    May 29, 2012Apt 33B
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION METAL DOOR IN THE ENTRANCE LOCATED AT APT 33B, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , 2nd SECTION FROM WEST AT NORTH
    Class AClosed
    May 4, 2012Apt 55A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW FRAME AT NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 55A, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 21, 2012Apt 61A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 61A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Feb 21, 2012Apt 61A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 61A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Feb 21, 2012Apt 61A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 61A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 21, 2011Apt 55A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 2nd WINDOW FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 55A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 7, 2011Apt 55A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST LOCATED AT APT 55A, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 14, 2011Apt 55A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE 3rd ROOM FROM EAST, THE KITCHEN , THE BATHROOM LOCATED AT APT 55A, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Nov 26, 2010Apt 40A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 40A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Page 8 of 8
    ← Prev