Class BOpen
Mar 13, 2023Apt 4H
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN/ENAMEL AT BATHTUB BY REGLAZING IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class BOpen
Feb 24, 2023Apt 4B
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class COpen
Sep 27, 2021
CORRECT FAILURE TO NOTIFY OCCUPANTS · LEAD-BASED PAINT
§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
Class BOpen
Sep 27, 2021Apt 4H
CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD · LEAD-BASED PAINT
§ 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''2017'', 1st FROM EAST AT SOUTH
Class COpen
Sep 17, 2021
FAILURE TO PROVIDE TO THE DEPT. WITHIN 45 DAYS · LEAD-BASED PAINT
§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
Class BOpen
Jun 10, 2021Apt 4K
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE THE PORCELAIN PAINT AT BATHTUB IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
Class COpen
Jun 8, 2021Apt 3B
ABATE THE NUISANCE OF ROACHES · EXTERMINATION & RODENT ERADICATION
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AOpen
Jan 29, 2018Apt 4H
FILE PLANS OR RESTORE · ALTERATIONS
§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DRY WALL ERECTED FROM FLOOR TO CEILING WITH A DOOR CREATING A NEW ROOM IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AOpen
Aug 1, 2016Apt 1C
FILE PLANS OR RESTORE · ALTERATIONS
§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ; WALLS ALTERED & APT EXPANDED INTO APPARENT ADJACENT COMMERCIAL SPACE IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, SECTION AT NORTH
Class IOpen
—
SELECTED TO PARTICIPATE IN THE AEP PROGRAM · ALTERNATIVE ENFORCEMENT PROGRAM
§27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WILL BECOME LIENS ON THE PROPERTY