stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

80 CLARKSON AVENUE

Brooklyn · ZIP 11226 · BIN 3116206 · Flatbush · Last violation Jul 30, 2026 · Last complaint Jul 23, 2026

NeighborhoodFlatbush
More violations than 94% of nearby buildings
More violations than 94% of buildings and more complaints than 98% of buildings in Flatbush. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 649 violations · 1064 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
53 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous53Class Bhazardous92

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and building maintenance.
    Worth checking · AI-assistedⓘ
    Look along the baseboards and floor corners for droppings, dead insects, or sticky traps. Check cabinet and closet surfaces, pipes, and walls for water stains, peeling paint, or soft spots.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Bldg maintenance — General building repair, upkeep, and maintenance related housing code violations.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
Housing Preservation & Development Violations
Total violations since 1992
2,052
59 per year avg.↑ Up 43% in the last 2 years (649 vs 453 prior 2 yrs)
Open violations
189
Class C (immed. haz.)ⓘ53
Class B (hazardous)ⓘ92
Rent-impairingⓘ4
Housing Preservation & Development Complaints
Total complaints since 2003
3,460
144 per year avg.↑ Up 115% in the last 2 years (1,064 vs 496 prior 2 yrs)
Complaint Resolution
No access16%Violation issued30%No violation34%Phone resolved19%Other0%(3,460)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ480 violations
Paintingⓘ134 violations
Water Supplyⓘ126 violations
Cleaningⓘ101 violations
Extermination & Rodent Eradicationⓘ97 violations
Egressⓘ87 violations
Lead-Based Paintⓘ43 violations
Artificial Lightingⓘ34 violations
Top complaint groupsⓘ
5 yrsAll time
Mold & pestsⓘ321 complaints
Water & plumbingⓘ317 complaints
Heat / hot waterⓘ282 complaints
Bldg maintenanceⓘ278 complaints
Electricalⓘ139 complaints
Safety & fireⓘ85 complaints
Appliancesⓘ27 complaints
Outdoor / structuralⓘ1 complaints
Hide violations ↑See complaints →

Violation log

397 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
— violation classes
  • NYC HPD, Penalties and Fees — correction deadlines
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Lead-paint violations on record.
    Worth checking · AI-assistedⓘ
    Look for paint that is peeling, chipped, or cracked on interior walls, trim, windows, doors, and door frames.
    details ▸

    Buildings built before 1960 may still contain lead-based paint, which causes behavioral and learning problems in young children, who can swallow dust and paint chips from windowsills and floors.

    If a child under six lives with you, or spends 10 or more hours a week in your apartment, tell the owner in writing, which is what obliges them to inspect annually. Report peeling paint, and call 311 if it is not fixed or if repair work is raising dust that is not being contained.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Open violation ages
    ▪ < 30 days30% (56)
    ▪ 30–90 days10% (18)
    ▪ 3–12 months37% (69)
    ▪ 1–3 years17% (32)
    ▪ 3+ years7% (14)
    Prior 4 yr.
    Immed. Emergency10%6%
    Emergency51%55%
    Non-Emergency39%38%
    (462)
    (1,248)
    Issued
    Description
    Class AClosed3HMay 13, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT SOUTH WALL IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HMay 13, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HMay 13, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 2nd CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HMay 13, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HMay 13, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed2DApr 17, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed2DApr 17, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed2DApr 16, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT WEST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 2nd CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM WEST AT NORTH WALL DOOR, 2nd CLOSET FROM WEST AT NORTH WALL DOOR, BASEBOARD AT NORTH WALL IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE KITCHEN , THE PRIVATE HALLWAY LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL, CEILING, SOUTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FROM SOUTH AT WEST WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT NORTH WALL IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3HApr 14, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st WINDOW FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 2nd WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed6DMar 24, 2025REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTHEAST
    Class AClosed—Mar 10, 2025PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER BUILDING FRONT , 1st STORY
    Class AClosed3GMar 10, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed3LFeb 25, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS INSIDE THE CLOSET IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
    Class AClosed3LFeb 25, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
    Class AClosed3LFeb 25, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT HEAT RISER IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SECTION''
    Class AClosed—Feb 11, 2025PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT 2ND STACK FROM EAST AT BUILDING FRONT AT FIRE ESCAPE
    Class AClosed3LJan 13, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS INSIDE THE CLOSET IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed3LJan 13, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SHOWER STALL CEILING. IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed—Nov 21, 2024PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT BUILDING FRONT , 1st STORY
    Class AClosed4FNov 14, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed4FNov 14, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed4FNov 14, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed5PNov 13, 2024ABATE THE NUISANCE · MAINTENANCE§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SPACE UNDER DOOR IN THE ENTRANCE LOCATED AT APT 5P, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed—Nov 7, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL AT BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION AT NORTH
    Class AClosed—Nov 7, 2024PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT FIRE ESCAPE AT NORTH WEST COURT YARD AT FRONT ENTRANCE TO THE BUILDING
    Class AClosed—Nov 6, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 4th STORY
    Class AClosed3EOct 17, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed—Sep 17, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BULKHEAD STAIRS EAST WALL AT 6th PUBLIC HALL BULKHEAD FROM EAST, 6th STORY, SECTION ''NORTH''
    Class AClosed2GAug 7, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed6CMay 31, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed4LMay 23, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
    Class AClosed4LMay 23, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE FOYER LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
    Class AClosed4FMay 21, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed4LMay 21, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING THROUGH OUT IN THE ENTIRE APARTMENT LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed2HApr 1, 2024RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
    Class AClosed2HApr 1, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
    Class AClosed2DMar 6, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPRX 4 SQ.FT. IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    May 13, 2025Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT SOUTH WALL IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    May 13, 2025Apt 3H
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    May 13, 2025Apt 3H
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 2nd CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    May 13, 2025Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    May 13, 2025Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 17, 2025Apt 2D
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 17, 2025Apt 2D
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 16, 2025Apt 2D
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT WEST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 2nd CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM WEST AT NORTH WALL DOOR, 2nd CLOSET FROM WEST AT NORTH WALL DOOR, BASEBOARD AT NORTH WALL IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE KITCHEN , THE PRIVATE HALLWAY LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL, CEILING, SOUTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FROM SOUTH AT WEST WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT NORTH WALL IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Apr 14, 2025Apt 3H
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st WINDOW FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 2nd WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Mar 24, 2025Apt 6D
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTHEAST
    Class AClosed
    Mar 10, 2025
    PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION
    § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER BUILDING FRONT , 1st STORY
    Class AClosed
    Mar 10, 2025Apt 3G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 25, 2025Apt 3L
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS INSIDE THE CLOSET IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
    Class AClosed
    Feb 25, 2025Apt 3L
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
    Class AClosed
    Feb 25, 2025Apt 3L
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT HEAT RISER IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SECTION''
    Class AClosed
    Feb 11, 2025
    PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION
    § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT 2ND STACK FROM EAST AT BUILDING FRONT AT FIRE ESCAPE
    Class AClosed
    Jan 13, 2025Apt 3L
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS INSIDE THE CLOSET IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 13, 2025Apt 3L
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SHOWER STALL CEILING. IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Nov 21, 2024
    PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION
    § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT BUILDING FRONT , 1st STORY
    Class AClosed
    Nov 14, 2024Apt 4F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed
    Nov 14, 2024Apt 4F
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed
    Nov 14, 2024Apt 4F
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    Class AClosed
    Nov 13, 2024Apt 5P
    ABATE THE NUISANCE · MAINTENANCE
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SPACE UNDER DOOR IN THE ENTRANCE LOCATED AT APT 5P, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed
    Nov 7, 2024
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL AT BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION AT NORTH
    Class AClosed
    Nov 7, 2024
    PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION
    § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT FIRE ESCAPE AT NORTH WEST COURT YARD AT FRONT ENTRANCE TO THE BUILDING
    Class AClosed
    Nov 6, 2024
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 4th STORY
    Class AClosed
    Oct 17, 2024Apt 3E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Sep 17, 2024
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BULKHEAD STAIRS EAST WALL AT 6th PUBLIC HALL BULKHEAD FROM EAST, 6th STORY, SECTION ''NORTH''
    Class AClosed
    Aug 7, 2024Apt 2G
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    May 31, 2024Apt 6C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    May 23, 2024Apt 4L
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
    Class AClosed
    May 23, 2024Apt 4L
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE FOYER LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
    Class AClosed
    May 21, 2024Apt 4F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    May 21, 2024Apt 4L
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING THROUGH OUT IN THE ENTIRE APARTMENT LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Apr 1, 2024Apt 2H
    RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
    Class AClosed
    Apr 1, 2024Apt 2H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
    Class AClosed
    Mar 6, 2024Apt 2D
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPRX 4 SQ.FT. IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Page 3 of 8
    ← PrevNext →