stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

209 EAST 34 STREET

Brooklyn · ZIP 11203 · BIN 3108694 · East Flatbush-Erasmus · Last violation Sep 28, 2026 · Last complaint Sep 26, 2026

NeighborhoodEast Flatbush-Erasmus
More violations than 97% of nearby buildings
More violations than 97% of buildings and more complaints than 98% of buildings in East Flatbush-Erasmus. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 578 violations · 842 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
45 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous45Class Bhazardous87

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and building maintenance.
    Worth checking · AI-assistedⓘ
    Look along the baseboards and floor corners for droppings, dead insects, or sticky traps. Check cabinet and closet surfaces, pipes, and walls for water stains, peeling paint, or soft spots.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Bldg maintenance — General building repair, upkeep, and maintenance related housing code violations.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

    • ABCs of Housing
Housing Preservation & Development Violations
Total violations since 1981
2,672
58 per year avg.↑ Up 124% in the last 2 years (578 vs 258 prior 2 yrs)
Open violations
155
Class C (immed. haz.)ⓘ45
Class B (hazardous)ⓘ87
Rent-impairingⓘ4
Housing Preservation & Development Complaints
Total complaints since 2003
5,142
214 per year avg.↑ Up 680% in the last 2 years (842 vs 108 prior 2 yrs)
Complaint Resolution
No access24%Violation issued30%No violation33%Phone resolved13%Other0%(5,142)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ500 violations
Extermination & Rodent Eradicationⓘ126 violations
Paintingⓘ123 violations
Lead-Based Paintⓘ86 violations
Cleaningⓘ86 violations
Water Supplyⓘ84 violations
Egressⓘ67 violations
Smoke Detecting Devicesⓘ37 violations
Top complaint groupsⓘ
5 yrsAll time
Bldg maintenanceⓘ255 complaints
Mold & pestsⓘ170 complaints
Water & plumbingⓘ161 complaints
Safety & fireⓘ117 complaints
Heat / hot waterⓘ81 complaints
Electricalⓘ80 complaints
Appliancesⓘ18 complaints
Outdoor / structuralⓘ2 complaints
Elevatorⓘ1 complaints
Hide violations ↑See complaints →

Violation log

475 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
  • NYC HPD, Penalties and Fees
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • ABCs of Housing
  • Lead-paint violations on record.
    Worth checking · AI-assistedⓘ
    Look for paint that is peeling, chipped, or cracked on interior walls, trim, windows, doors, and door frames.
    details ▸

    Buildings built before 1960 may still contain lead-based paint, which causes behavioral and learning problems in young children, who can swallow dust and paint chips from windowsills and floors.

    If a child under six lives with you, or spends 10 or more hours a week in your apartment, tell the owner in writing, which is what obliges them to inspect annually. Report peeling paint, and call 311 if it is not fixed or if repair work is raising dust that is not being contained.

    • ABCs of Housing
  • Open violation ages
    ▪ < 30 days29% (45)
    ▪ 30–90 days16% (25)
    ▪ 3–12 months41% (64)
    ▪ 1–3 years7% (11)
    ▪ 3+ years6% (10)
    Prior 4 yr.
    Immed. Emergency2%2%
    Emergency57%42%
    Non-Emergency42%56%
    (192)
    (894)
    Issued
    Description
    Class AClosed—Aug 14, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING AT PUBLIC HALL AT NORTH , 1st STORY
    Class AClosed15DAug 14, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 3 SQ FEET AT NORTH WALL UNDER THE BASE CABINETS AND EAST WALL IN THE KITCHEN LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
    Class AClosed15DAug 14, 2023REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LOWER BASE CABINETS AT NORTH WALL IN THE KITCHEN LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
    Class AClosed—Aug 14, 2023CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE THE FLOORS AT ALL STORYS FOR NORTH AND SOUTH SECTION OF THE BUILDING AT PUBLIC HALL STAIRS
    Class AClosed—Aug 14, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING SOUTH SECTION OF THE BUILDING AT PUBLIC HALL, 1st STORY
    Class AClosed14CJul 28, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 2nd ROOM FROM NORTH LOCATED AT APT 14C, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed2AJun 27, 2023NO LOCK AND KEY TO APARTMENT · PROTECTIVE DEVICES AND FIRE PROTECTION§ 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO DOOR CHAIN GUARD IN THE ENTRANCE LOCATED AT APT 2A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed2AJun 27, 2023FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL ERECTED CREATING A ROOM IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed18CJun 15, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 4 SQ. FT. AT EAST WALL IN THE BATHROOM LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''C'', 1st FROM EAST AT SOUTHEAST
    Class AClosed18CJun 14, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 6 SQ FT AT EAST WALL IN THE BATHROOM LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''C'', AT SOUTHEAST
    Class AClosed8DJun 14, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT SOUTHEAST
    Class AOpen20CJun 14, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 20C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''C''
    Class AOpen18CJun 14, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''C'', AT SOUTHEAST
    Class AClosed—May 10, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AND CEILING SECTION NORTH AT PUBLIC HALL, 1st STORY
    Class AClosed16AApr 4, 2023REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 16A, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''A''
    Class AClosed—Mar 22, 2023FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Class AClosed15DNov 10, 2022PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM SOUTH AT WEST WALL, 1st RISER FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed15DNov 10, 2022PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed15DNov 10, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL, EAST WALL IN THE BATHROOM LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed15DNov 10, 2022PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed15DNov 10, 2022PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed15DNov 10, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed11COct 18, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3BSep 21, 2022REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT HEAT RISER IN THE KITCHEN LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3BSep 21, 2022REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3BSep 21, 2022REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT HEAT RISER IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3BSep 21, 2022REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3BSep 21, 2022REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTERBALANCE UPPER AND LOWER SASH AT 2ND WINDOW AT EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3BSep 21, 2022TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3BSep 21, 2022PROVIDE SUPPLY OF ELECTRICTY TO FIXTURES · ARTIFICIAL LIGHTING§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES LIGHT FIXTURE AT CEILING FLICKERING IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3BSep 21, 2022REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3BSep 21, 2022REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3BSep 21, 2022REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed—Sep 20, 2022REMOVE ACCUMULATION OR RUBBISH · CLEANING§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE REAR YARD
    Class AClosed—Sep 13, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 4th STORY, SECTION ''EAST'', 1st FROM NORTH AT EAST
    Class AClosed20CSep 12, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , EAST WALL, NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 20C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed11CSep 9, 2022PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed11CSep 9, 2022PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed11CSep 9, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed8DAug 31, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D''
    Class AClosed8DAug 31, 2022PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D''
    Class AClosed17CAug 2, 2022TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AROUND WINDOW RECESS APPROXIMATELY 4 SQ FT IN THE 2nd ROOM FROM NORTH LOCATED AT APT 17C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed17CAug 2, 2022PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER IN THE 2nd ROOM FROM NORTH LOCATED AT APT 17C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed17CAug 2, 2022PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER IN THE BATHROOM LOCATED AT APT 17C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed18CJul 29, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Class AClosed18CJul 29, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT WEST WALL, BASEBOARD AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Class AClosed18CJul 29, 2022REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Class AClosed18CJul 29, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, 1st CLOSET FROM NORTH AT EAST WALL DOOR, BASEBOARD AT WEST WALL, BASEBOARD AT EAST WALL IN THE FOYER LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Class AClosed18CJul 29, 2022REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Class AClosed18CJul 29, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Class AClosed
    Aug 14, 2023
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING AT PUBLIC HALL AT NORTH , 1st STORY
    Class AClosed
    Aug 14, 2023Apt 15D
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 3 SQ FEET AT NORTH WALL UNDER THE BASE CABINETS AND EAST WALL IN THE KITCHEN LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
    Class AClosed
    Aug 14, 2023Apt 15D
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LOWER BASE CABINETS AT NORTH WALL IN THE KITCHEN LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
    Class AClosed
    Aug 14, 2023
    CLEANSE · CLEANING
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE THE FLOORS AT ALL STORYS FOR NORTH AND SOUTH SECTION OF THE BUILDING AT PUBLIC HALL STAIRS
    Class AClosed
    Aug 14, 2023
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING SOUTH SECTION OF THE BUILDING AT PUBLIC HALL, 1st STORY
    Class AClosed
    Jul 28, 2023Apt 14C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 2nd ROOM FROM NORTH LOCATED AT APT 14C, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jun 27, 2023Apt 2A
    NO LOCK AND KEY TO APARTMENT · PROTECTIVE DEVICES AND FIRE PROTECTION
    § 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO DOOR CHAIN GUARD IN THE ENTRANCE LOCATED AT APT 2A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jun 27, 2023Apt 2A
    FILE PLANS OR RESTORE · ALTERATIONS
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL ERECTED CREATING A ROOM IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jun 15, 2023Apt 18C
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 4 SQ. FT. AT EAST WALL IN THE BATHROOM LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''C'', 1st FROM EAST AT SOUTHEAST
    Class AClosed
    Jun 14, 2023Apt 18C
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 6 SQ FT AT EAST WALL IN THE BATHROOM LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''C'', AT SOUTHEAST
    Class AClosed
    Jun 14, 2023Apt 8D
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT SOUTHEAST
    Class AOpen
    Jun 14, 2023Apt 20C
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 20C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''C''
    Class AOpen
    Jun 14, 2023Apt 18C
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''C'', AT SOUTHEAST
    Class AClosed
    May 10, 2023
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AND CEILING SECTION NORTH AT PUBLIC HALL, 1st STORY
    Class AClosed
    Apr 4, 2023Apt 16A
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 16A, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''A''
    Class AClosed
    Mar 22, 2023
    FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Class AClosed
    Nov 10, 2022Apt 15D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM SOUTH AT WEST WALL, 1st RISER FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed
    Nov 10, 2022Apt 15D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed
    Nov 10, 2022Apt 15D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL, EAST WALL IN THE BATHROOM LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed
    Nov 10, 2022Apt 15D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed
    Nov 10, 2022Apt 15D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed
    Nov 10, 2022Apt 15D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
    Class AClosed
    Oct 18, 2022Apt 11C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 21, 2022Apt 3B
    REPLACE · MAINTENANCE
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT HEAT RISER IN THE KITCHEN LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 21, 2022Apt 3B
    REPAIR LEAKY FAUCETS · WATER SUPPLY
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 21, 2022Apt 3B
    REPLACE · MAINTENANCE
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT HEAT RISER IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 21, 2022Apt 3B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 21, 2022Apt 3B
    REPAIR · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTERBALANCE UPPER AND LOWER SASH AT 2ND WINDOW AT EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 21, 2022Apt 3B
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 21, 2022Apt 3B
    PROVIDE SUPPLY OF ELECTRICTY TO FIXTURES · ARTIFICIAL LIGHTING
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES LIGHT FIXTURE AT CEILING FLICKERING IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 21, 2022Apt 3B
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 21, 2022Apt 3B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 21, 2022Apt 3B
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 20, 2022
    REMOVE ACCUMULATION OR RUBBISH · CLEANING
    § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE REAR YARD
    Class AClosed
    Sep 13, 2022
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 4th STORY, SECTION ''EAST'', 1st FROM NORTH AT EAST
    Class AClosed
    Sep 12, 2022Apt 20C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , EAST WALL, NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 20C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Sep 9, 2022Apt 11C
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 9, 2022Apt 11C
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 9, 2022Apt 11C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Aug 31, 2022Apt 8D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D''
    Class AClosed
    Aug 31, 2022Apt 8D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D''
    Class AClosed
    Aug 2, 2022Apt 17C
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AROUND WINDOW RECESS APPROXIMATELY 4 SQ FT IN THE 2nd ROOM FROM NORTH LOCATED AT APT 17C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Aug 2, 2022Apt 17C
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER IN THE 2nd ROOM FROM NORTH LOCATED AT APT 17C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Aug 2, 2022Apt 17C
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER IN THE BATHROOM LOCATED AT APT 17C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 29, 2022Apt 18C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Class AClosed
    Jul 29, 2022Apt 18C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT WEST WALL, BASEBOARD AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Class AClosed
    Jul 29, 2022Apt 18C
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Class AClosed
    Jul 29, 2022Apt 18C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, 1st CLOSET FROM NORTH AT EAST WALL DOOR, BASEBOARD AT WEST WALL, BASEBOARD AT EAST WALL IN THE FOYER LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Class AClosed
    Jul 29, 2022Apt 18C
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Class AClosed
    Jul 29, 2022Apt 18C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SE''
    Page 3 of 10
    ← PrevNext →