stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

209 EAST 34 STREET

Brooklyn · ZIP 11203 · BIN 3108694 · East Flatbush-Erasmus · Last violation Sep 28, 2026 · Last complaint Sep 26, 2026

NeighborhoodEast Flatbush-Erasmus
More violations than 97% of nearby buildings
More violations than 97% of buildings and more complaints than 98% of buildings in East Flatbush-Erasmus. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 578 violations · 842 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
45 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous45Class Bhazardous87

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and building maintenance.
    Worth checking · AI-assistedⓘ
    Look along the baseboards and floor corners for droppings, dead insects, or sticky traps. Check cabinet and closet surfaces, pipes, and walls for water stains, peeling paint, or soft spots.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Bldg maintenance — General building repair, upkeep, and maintenance related housing code violations.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

    • ABCs of Housing
Housing Preservation & Development Violations
Total violations since 1981
2,672
58 per year avg.↑ Up 124% in the last 2 years (578 vs 258 prior 2 yrs)
Open violations
155
Class C (immed. haz.)ⓘ45
Class B (hazardous)ⓘ87
Rent-impairingⓘ4
Housing Preservation & Development Complaints
Total complaints since 2003
5,142
214 per year avg.↑ Up 680% in the last 2 years (842 vs 108 prior 2 yrs)
Complaint Resolution
No access24%Violation issued30%No violation33%Phone resolved13%Other0%(5,142)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ500 violations
Extermination & Rodent Eradicationⓘ126 violations
Paintingⓘ123 violations
Lead-Based Paintⓘ86 violations
Cleaningⓘ86 violations
Water Supplyⓘ84 violations
Egressⓘ67 violations
Smoke Detecting Devicesⓘ37 violations
Top complaint groupsⓘ
5 yrsAll time
Bldg maintenanceⓘ255 complaints
Mold & pestsⓘ170 complaints
Water & plumbingⓘ161 complaints
Safety & fireⓘ117 complaints
Heat / hot waterⓘ81 complaints
Electricalⓘ80 complaints
Appliancesⓘ18 complaints
Outdoor / structuralⓘ2 complaints
Elevatorⓘ1 complaints
Hide violations ↑See complaints →

Violation log

475 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
  • NYC HPD, Penalties and Fees
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • ABCs of Housing
  • Lead-paint violations on record.
    Worth checking · AI-assistedⓘ
    Look for paint that is peeling, chipped, or cracked on interior walls, trim, windows, doors, and door frames.
    details ▸

    Buildings built before 1960 may still contain lead-based paint, which causes behavioral and learning problems in young children, who can swallow dust and paint chips from windowsills and floors.

    If a child under six lives with you, or spends 10 or more hours a week in your apartment, tell the owner in writing, which is what obliges them to inspect annually. Report peeling paint, and call 311 if it is not fixed or if repair work is raising dust that is not being contained.

    • ABCs of Housing
  • Open violation ages
    ▪ < 30 days29% (45)
    ▪ 30–90 days16% (25)
    ▪ 3–12 months41% (64)
    ▪ 1–3 years7% (11)
    ▪ 3+ years6% (10)
    Prior 4 yr.
    Immed. Emergency2%2%
    Emergency57%42%
    Non-Emergency42%56%
    (192)
    (894)
    Issued
    Description
    Class AClosed—Apr 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WINDOWS WOOD MOLDING AT PUBLIC HALL
    Class AClosed4CApr 14, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEAT RISER IN THE BATHROOM LOCATED AT APT 4C, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed2DApr 14, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEAT RISER IN THE BATHROOM LOCATED AT APT 2D, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed11AApr 11, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 11A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed14CApr 7, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 1st ROOM FROM NORTH AT EAST, THE FOYER , THE BATHROOM , THE 3rd ROOM FROM NORTH LOCATED AT APT 14C, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHEAST
    Class AClosed14CApr 7, 2025REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 14C, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHEAST
    Class AClosed—Mar 20, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WEST WALL AT BULK-HEAD AT PUBLIC HALL, 4th STORY, SECTION ''AB'', AT NORTH
    Class AClosed—Mar 20, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT WEST WALL AT BULK-HEAD AT PUBLIC HALL, 4th STORY, SECTION ''AB'', AT NORTH
    Class AClosed—Mar 17, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY
    Class AClosed—Mar 17, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''AB'', AT NORTH
    Class AClosed—Mar 17, 2025REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING AT PUBLIC HALL, 1st STORY
    Class AClosed—Feb 19, 2025CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 4th STORY
    Class AClosed—Feb 19, 2025CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 3rd STORY
    Class AClosed—Feb 19, 2025CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 1st STORY
    Class AClosed—Feb 19, 2025CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 2nd STORY
    Class AClosed11DJan 8, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed11DJan 8, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed11DJan 7, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 11D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed11DJan 7, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM WEST AT NORTH WALL WALL, 1st CLOSET FROM WEST AT NORTH WALL CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed11DJan 7, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM SOUTH AT WEST WALL, 1st RADIATOR FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed11DJan 7, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed11DJan 7, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE KITCHEN LOCATED AT APT 11D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed8DJan 6, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CHAIR RAILS AT WEST WALL, CEILING, NORTH WALL, WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed8DJan 6, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 2nd ROOM FROM NORTH AT EAST, THE BATHROOM , THE PRIVATE HALLWAY , THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed8DJan 6, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... (APPROX. 5 SQ FT) AT 2nd CLOSET FROM WEST AT NORTH WALL CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed15DSep 23, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed15DSep 23, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed—Sep 16, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''NORTH''
    Class AClosed10CSep 4, 2024REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 10C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed10CSep 4, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 10C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed—Jul 22, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE , 1st STORY
    Class AOpen—Apr 9, 2024FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Class AClosed20BFeb 28, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ.FT AT CEILING AND APPROXIMATELY 3 SQ.FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 20B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTHEAST
    Class AClosed6AFeb 12, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 5 SQ FT AT THE WINDOW FRAME IN THE BATHROOM LOCATED AT APT 6A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed.17BFeb 8, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT .17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed6AFeb 5, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 6A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed8DJan 16, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3 SQFT AT THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosedAPT17BJan 11, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING AND WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT APT17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed.17BJan 11, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT .17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed.17BJan 11, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 2nd ROOM FROM EAST, THE FOYER LOCATED AT APT .17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosedAPT17BJan 10, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND SOUTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT APT17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosedAPT17BDec 20, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST LOCATED AT APT APT17B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed20COct 20, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL, WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 20C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed12DAug 21, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT DOOR FRAME, CEILING, NORTH, EAST AND WEST WALLS IN THE KITCHEN LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AClosed12DAug 21, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL IN THE FOYER LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AClosed12DAug 21, 2023CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AOpen12DAug 21, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WOOD CABINET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AClosed12DAug 21, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, NORTH, SOUTH AND EAST WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AClosed12DAug 21, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AClosed—Aug 17, 2023PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL PARTS FOR ALL BALCONIES AT ALL STORYS THROUGHOUT AT BUILDING FRONT AT FIRE ESCAPE
    Class AClosed
    Apr 14, 2025
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WINDOWS WOOD MOLDING AT PUBLIC HALL
    Class AClosed
    Apr 14, 2025Apt 4C
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEAT RISER IN THE BATHROOM LOCATED AT APT 4C, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Apr 14, 2025Apt 2D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEAT RISER IN THE BATHROOM LOCATED AT APT 2D, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Apr 11, 2025Apt 11A
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 11A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Apr 7, 2025Apt 14C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 1st ROOM FROM NORTH AT EAST, THE FOYER , THE BATHROOM , THE 3rd ROOM FROM NORTH LOCATED AT APT 14C, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHEAST
    Class AClosed
    Apr 7, 2025Apt 14C
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 14C, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHEAST
    Class AClosed
    Mar 20, 2025
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WEST WALL AT BULK-HEAD AT PUBLIC HALL, 4th STORY, SECTION ''AB'', AT NORTH
    Class AClosed
    Mar 20, 2025
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT WEST WALL AT BULK-HEAD AT PUBLIC HALL, 4th STORY, SECTION ''AB'', AT NORTH
    Class AClosed
    Mar 17, 2025
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY
    Class AClosed
    Mar 17, 2025
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''AB'', AT NORTH
    Class AClosed
    Mar 17, 2025
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING AT PUBLIC HALL, 1st STORY
    Class AClosed
    Feb 19, 2025
    CLEANSE · CLEANING
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 4th STORY
    Class AClosed
    Feb 19, 2025
    CLEANSE · CLEANING
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 3rd STORY
    Class AClosed
    Feb 19, 2025
    CLEANSE · CLEANING
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 1st STORY
    Class AClosed
    Feb 19, 2025
    CLEANSE · CLEANING
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 2nd STORY
    Class AClosed
    Jan 8, 2025Apt 11D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed
    Jan 8, 2025Apt 11D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed
    Jan 7, 2025Apt 11D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 11D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed
    Jan 7, 2025Apt 11D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM WEST AT NORTH WALL WALL, 1st CLOSET FROM WEST AT NORTH WALL CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed
    Jan 7, 2025Apt 11D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM SOUTH AT WEST WALL, 1st RADIATOR FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed
    Jan 7, 2025Apt 11D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed
    Jan 7, 2025Apt 11D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE KITCHEN LOCATED AT APT 11D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed
    Jan 6, 2025Apt 8D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CHAIR RAILS AT WEST WALL, CEILING, NORTH WALL, WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed
    Jan 6, 2025Apt 8D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 2nd ROOM FROM NORTH AT EAST, THE BATHROOM , THE PRIVATE HALLWAY , THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed
    Jan 6, 2025Apt 8D
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... (APPROX. 5 SQ FT) AT 2nd CLOSET FROM WEST AT NORTH WALL CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
    Class AClosed
    Sep 23, 2024Apt 15D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Sep 23, 2024Apt 15D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Sep 16, 2024
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''NORTH''
    Class AClosed
    Sep 4, 2024Apt 10C
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 10C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Sep 4, 2024Apt 10C
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 10C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jul 22, 2024
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE , 1st STORY
    Class AOpen
    Apr 9, 2024
    FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Class AClosed
    Feb 28, 2024Apt 20B
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ.FT AT CEILING AND APPROXIMATELY 3 SQ.FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 20B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTHEAST
    Class AClosed
    Feb 12, 2024Apt 6A
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 5 SQ FT AT THE WINDOW FRAME IN THE BATHROOM LOCATED AT APT 6A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Feb 8, 2024Apt .17B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT .17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Feb 5, 2024Apt 6A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 6A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jan 16, 2024Apt 8D
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3 SQFT AT THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jan 11, 2024Apt APT17B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING AND WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT APT17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jan 11, 2024Apt .17B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT .17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jan 11, 2024Apt .17B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 2nd ROOM FROM EAST, THE FOYER LOCATED AT APT .17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jan 10, 2024Apt APT17B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND SOUTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT APT17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Dec 20, 2023Apt APT17B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST LOCATED AT APT APT17B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 20, 2023Apt 20C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL, WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 20C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Aug 21, 2023Apt 12D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT DOOR FRAME, CEILING, NORTH, EAST AND WEST WALLS IN THE KITCHEN LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AClosed
    Aug 21, 2023Apt 12D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL IN THE FOYER LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AClosed
    Aug 21, 2023Apt 12D
    CLEANSE · CLEANING
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AOpen
    Aug 21, 2023Apt 12D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WOOD CABINET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AClosed
    Aug 21, 2023Apt 12D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, NORTH, SOUTH AND EAST WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AClosed
    Aug 21, 2023Apt 12D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
    Class AClosed
    Aug 17, 2023
    PAINT METAL · PAINTING
    § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL PARTS FOR ALL BALCONIES AT ALL STORYS THROUGHOUT AT BUILDING FRONT AT FIRE ESCAPE
    Page 2 of 10
    ← PrevNext →