stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

338 SOUTH 3 STREET

Brooklyn · ZIP 11211 · BIN 3063350 · Williamsburg · Last violation Aug 10, 2026 · Last complaint Jul 29, 2026

NeighborhoodWilliamsburg
More violations than 100% of nearby buildings
More violations than 100% of buildings and more complaints than 99% of buildings in Williamsburg. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
More activity recently than in past years
Last 2 yrs: 553 violations · 224 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
180 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous180Class Bhazardous375

What to watch forⓘ

  1. Hazardous violations are open, including building maintenance, and mold and pests.
    Worth checking · AI-assistedⓘ
    Look at baseboards, trim, and corners near the floor for gaps or damage where pests could enter. Inspect walls and ceilings for cracks, water stains, peeling paint, or soft spots in plaster.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Bldg maintenance — General building repair, upkeep, and maintenance related housing code violations.
    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
Housing Preservation & Development Violations
Total violations since 2008
1,513
80 per year avg.↑ Up 162% in the last 2 years (553 vs 211 prior 2 yrs)
Open violations
660
Class C (immed. haz.)ⓘ180
Class B (hazardous)ⓘ375
Rent-impairingⓘ44
Housing Preservation & Development Complaints
Total complaints since 2003
750
31 per year avg.↑ Up 91% in the last 2 years (224 vs 117 prior 2 yrs)
Complaint Resolution
No access12%Violation issued35%No violation34%Phone resolved17%Other2%(750)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ357 violations
Paintingⓘ82 violations
Water Supplyⓘ81 violations
Cleaningⓘ75 violations
Egressⓘ39 violations
Lead-Based Paintⓘ38 violations
Artificial Lightingⓘ38 violations
Extermination & Rodent Eradicationⓘ37 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ89 complaints
Water & plumbingⓘ83 complaints
Mold & pestsⓘ65 complaints
Bldg maintenanceⓘ60 complaints
Electricalⓘ28 complaints
Appliancesⓘ10 complaints
Safety & fireⓘ9 complaints
Elevatorⓘ1 complaints
Hide violations ↑See complaints →

Violation log

297 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
— violation classes
  • NYC HPD, Penalties and Fees — correction deadlines
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Lead-paint violations on record.
    Worth checking · AI-assistedⓘ
    Look for paint that is peeling, chipped, or cracked on interior walls, trim, windows, doors, and door frames.
    details ▸

    Buildings built before 1960 may still contain lead-based paint, which causes behavioral and learning problems in young children, who can swallow dust and paint chips from windowsills and floors.

    If a child under six lives with you, or spends 10 or more hours a week in your apartment, tell the owner in writing, which is what obliges them to inspect annually. Report peeling paint, and call 311 if it is not fixed or if repair work is raising dust that is not being contained.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Open violation ages
    ▪ < 30 days0% (1)
    ▪ 30–90 days3% (20)
    ▪ 3–12 months34% (226)
    ▪ 1–3 years34% (223)
    ▪ 3+ years29% (189)
    Prior 4 yr.
    Immed. Emergency9%6%
    Emergency55%56%
    Non-Emergency36%38%
    (98)
    (309)
    Issued
    Description
    Class AOpenA1Jun 23, 2026REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT A1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AOpenC3Jun 15, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM NORTH LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpenC3Jun 15, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST, SOUTH, WEST, AND NORTH WALLS IN THE KITCHEN LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen—May 5, 2026FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Class AOpenF1Apr 10, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RISER AT WEST WALL IN THE BATHROOM LOCATED AT APT F1, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AOpenF1Apr 10, 2026REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT F1, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosedF1Apr 10, 2026TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ. FT. AT THE NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT F1, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AOpen—Apr 1, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, NORTH WALL AND WEST WALL AT PUBLIC HALL, 6th STORY
    Class AClosedA5Feb 13, 2026TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET IN THE BATHROOM LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AOpenA5Feb 13, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st BATHROOM FROM EAST, THE BATHROOM , THE KITCHEN LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AOpenF4Jan 20, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AOpenA2Nov 26, 2025RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL TOILET BOWL IN THE BATHROOM LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AOpen—Nov 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BULKHEAD CEILING AND SOUTH WALL
    Class AOpenC7Nov 6, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE ENTIRE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT C7, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpenA2Nov 6, 2025RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpenA2Nov 6, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE ENTIRE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpenA2Oct 17, 2025RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpenA2Oct 17, 2025CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD ON CERAMIC WALL TILES AT EAST WALL IN THE KITCHEN LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpenA2Oct 17, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 2nd ROOM FROM EAST AT NORTH, THE KITCHEN , THE 1st ROOM FROM EAST AT SOUTH, THE PRIVATE HALLWAY LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpen1AOct 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen1AOct 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , SOUTH WALL, EAST WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen1AOct 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , SOUTH WALL, 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen1AOct 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT EAST, THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed1AOct 14, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FEET AT THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen1AOct 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , WEST WALL, EAST WALL IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen1AOct 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , SOUTH WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen—Oct 10, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BULKHEAD CEILING AND ALL WALLS
    Class AClosedF4Sep 12, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosedF1Sep 10, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT F1, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpenC3Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH AND SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AOpenF3Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT F3, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosedF2Aug 18, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING AND AT NORTH WALL IN THE BATHROOM LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpenF5Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST AND NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT F5, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AOpenA5Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpenC3Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, EAST AND SOUTH WALL IN THE KITCHEN LOCATED AT APT C3, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AOpenA5Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 4th ROOM FROM EAST, THE FOYER , THE KITCHEN , THE 1st ROOM FROM EAST LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpenC3Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT C3, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AOpenF4Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST AND NORT WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosedF4Aug 18, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3 SQ FEET AT CEILING INSIDE CLOSET IN THE 1st ROOM FROM NORTH LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpenF3Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT F3, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AOpenC3Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH AND WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT C3, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosedA5Aug 18, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT WEST WALL AND CEILING IN THE BATHROOM LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosedF2Aug 18, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE KITCHEN LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpenF3Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT F3, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosedE4Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT E4, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosedE4Aug 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT E4, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpenF2Aug 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST AND EAST WALL IN THE KITCHEN LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpenF2Aug 14, 2025REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CABINET UNDER WASH BASIN IN THE BATHROOM LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosedF2Aug 14, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 6 SQ FEET AT CEILING IN THE KITCHEN LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen—Aug 14, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 6th STORY
    Class AOpen
    Jun 23, 2026Apt A1
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT A1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Jun 15, 2026Apt C3
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM NORTH LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Jun 15, 2026Apt C3
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST, SOUTH, WEST, AND NORTH WALLS IN THE KITCHEN LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    May 5, 2026
    FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Class AOpen
    Apr 10, 2026Apt F1
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RISER AT WEST WALL IN THE BATHROOM LOCATED AT APT F1, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Apr 10, 2026Apt F1
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT F1, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 10, 2026Apt F1
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ. FT. AT THE NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT F1, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Apr 1, 2026
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, NORTH WALL AND WEST WALL AT PUBLIC HALL, 6th STORY
    Class AClosed
    Feb 13, 2026Apt A5
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET IN THE BATHROOM LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AOpen
    Feb 13, 2026Apt A5
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st BATHROOM FROM EAST, THE BATHROOM , THE KITCHEN LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AOpen
    Jan 20, 2026Apt F4
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AOpen
    Nov 26, 2025Apt A2
    RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL TOILET BOWL IN THE BATHROOM LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AOpen
    Nov 18, 2025
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BULKHEAD CEILING AND SOUTH WALL
    Class AOpen
    Nov 6, 2025Apt C7
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE ENTIRE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT C7, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Nov 6, 2025Apt A2
    RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpen
    Nov 6, 2025Apt A2
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE ENTIRE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpen
    Oct 17, 2025Apt A2
    RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpen
    Oct 17, 2025Apt A2
    CLEANSE · CLEANING
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD ON CERAMIC WALL TILES AT EAST WALL IN THE KITCHEN LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpen
    Oct 17, 2025Apt A2
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 2nd ROOM FROM EAST AT NORTH, THE KITCHEN , THE 1st ROOM FROM EAST AT SOUTH, THE PRIVATE HALLWAY LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpen
    Oct 14, 2025Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Oct 14, 2025Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , SOUTH WALL, EAST WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Oct 14, 2025Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , SOUTH WALL, 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Oct 14, 2025Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT EAST, THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 14, 2025Apt 1A
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FEET AT THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Oct 14, 2025Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , WEST WALL, EAST WALL IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Oct 14, 2025Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , SOUTH WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Oct 10, 2025
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BULKHEAD CEILING AND ALL WALLS
    Class AClosed
    Sep 12, 2025Apt F4
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Sep 10, 2025Apt F1
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT F1, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Aug 18, 2025Apt C3
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH AND SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AOpen
    Aug 18, 2025Apt F3
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT F3, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Aug 18, 2025Apt F2
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING AND AT NORTH WALL IN THE BATHROOM LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Aug 18, 2025Apt F5
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST AND NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT F5, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AOpen
    Aug 18, 2025Apt A5
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Aug 18, 2025Apt C3
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, EAST AND SOUTH WALL IN THE KITCHEN LOCATED AT APT C3, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AOpen
    Aug 18, 2025Apt A5
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 4th ROOM FROM EAST, THE FOYER , THE KITCHEN , THE 1st ROOM FROM EAST LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Aug 18, 2025Apt C3
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT C3, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AOpen
    Aug 18, 2025Apt F4
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST AND NORT WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Aug 18, 2025Apt F4
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3 SQ FEET AT CEILING INSIDE CLOSET IN THE 1st ROOM FROM NORTH LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpen
    Aug 18, 2025Apt F3
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT F3, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AOpen
    Aug 18, 2025Apt C3
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH AND WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT C3, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Aug 18, 2025Apt A5
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT WEST WALL AND CEILING IN THE BATHROOM LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Aug 18, 2025Apt F2
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE KITCHEN LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Aug 18, 2025Apt F3
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT F3, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Aug 18, 2025Apt E4
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT E4, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Aug 18, 2025Apt E4
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT E4, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AOpen
    Aug 14, 2025Apt F2
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST AND EAST WALL IN THE KITCHEN LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Aug 14, 2025Apt F2
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CABINET UNDER WASH BASIN IN THE BATHROOM LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Aug 14, 2025Apt F2
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 6 SQ FEET AT CEILING IN THE KITCHEN LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AOpen
    Aug 14, 2025
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 6th STORY
    Page 1 of 6
    Next →