stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

1114 WARD AVENUE

Bronx · ZIP 10472 · BIN 2023923 · Soundview-Bruckner-Bronx River · Last violation Jun 23, 2026 · Last complaint Aug 12, 2026

NeighborhoodSoundview-Bruckner-Bronx River
More violations than 91% of nearby buildings
More violations than 91% of buildings and more complaints than 94% of buildings in Soundview-Bruckner-Bronx River. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 327 violations · 452 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
14 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous14Class Bhazardous9

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and fire safety.
    Worth checking · AI-assistedⓘ
    Look for droppings, live insects, or damage to walls, cabinets, and baseboards in the kitchen, bathroom, and under sinks. Check that apartment entry doors, stairwell doors, and fire escape access are all unlocked and open freely without obstruction.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Safety & fire — Blocked, unsafe, or inaccessible exits, hallways, stairs, or fire escape routes.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

Housing Preservation & Development Violations
Total violations since 1990
1,287
35 per year avg.↑ Up 834% in the last 2 years (327 vs 35 prior 2 yrs)
Open violations
24
Class C (immed. haz.)ⓘ14
Class B (hazardous)ⓘ9
Rent-impairingⓘ0
Housing Preservation & Development Complaints
Total complaints since 2003
1,809
75 per year avg.↑ Up 438% in the last 2 years (452 vs 84 prior 2 yrs)
Complaint Resolution
No access23%Violation issued29%No violation28%Phone resolved18%Other1%(1,809)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ129 violations
Extermination & Rodent Eradicationⓘ61 violations
Kitchen And Kitchenettesⓘ42 violations
Egressⓘ31 violations
Water Supplyⓘ22 violations
Carbon Monoxide Detecting Devicesⓘ17 violations
Cleaningⓘ17 violations
Smoke Detecting Devicesⓘ16 violations
Top complaint groupsⓘ
5 yrsAll time
Bldg maintenanceⓘ124 complaints
Heat / hot waterⓘ108 complaints
Safety & fireⓘ87 complaints
Mold & pestsⓘ66 complaints
Water & plumbingⓘ60 complaints
Appliancesⓘ50 complaints
Electricalⓘ25 complaints
Elevatorⓘ1 complaints
Hide violations ↑See complaints →

Violation log

212 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
  • NYC HPD, ABCs of Housing 2024 (Tenants' Guide) — violation classes
  • NYC HPD, Penalties and Fees — correction deadlines
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Lead-paint violations on record.
    Worth checking · AI-assistedⓘ
    Look for paint that is peeling, chipped, or cracked on interior walls, trim, windows, doors, and door frames.
    details ▸

    Buildings built before 1960 may still contain lead-based paint, which causes behavioral and learning problems in young children, who can swallow dust and paint chips from windowsills and floors.

    If a child under six lives with you, or spends 10 or more hours a week in your apartment, tell the owner in writing, which is what obliges them to inspect annually. Report peeling paint, and call 311 if it is not fixed or if repair work is raising dust that is not being contained.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Open violation ages
    ▪ 30–90 days4% (1)
    ▪ 3–12 months8% (2)
    ▪ 1–3 years58% (14)
    ▪ 3+ years29% (7)
    Prior 4 yr.
    Immed. Emergency4%1%
    Emergency69%56%
    Non-Emergency26%42%
    (72)
    (493)
    Issued
    Description
    Class AClosed2JNov 25, 2015REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed4GNov 25, 2015REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHWEST
    Class AClosed4GNov 25, 2015REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTHEAST
    Class AClosed4GNov 25, 2015PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTHEAST
    Class AClosed4GNov 25, 2015REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed4GNov 25, 2015RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed4ISep 4, 2015PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE BATHROOM , THE FOYER LOCATED AT APT 4I, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed1EJul 17, 2015REFIT DOORS ETC. · EGRESSSECTION 27-2005 ADM CODE REFIT THE UPPER SASH WEST WINDOW IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed4GMay 21, 2015RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed4GMay 21, 2015TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANINGSECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING, AND WALLS. IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed4GMay 21, 2015REPAIR PLASTER · MAINTENANCESECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, AND WALLS. IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed4GMay 21, 2015REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLYSECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING. IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed4GApr 8, 2015PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT DOORS AND TRIMS IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed4GApr 8, 2015REPAIR PLASTER · MAINTENANCESECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed2EApr 1, 2015PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE PRIVATE HALLWAY , THE 1st ROOM FROM EAST, THE BATHROOM , THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed2EMar 30, 2015PAINT METAL · PAINTINGSECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 2E, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed4FMar 24, 2015REFIT DOORS ETC. · EGRESSSECTION 27-2005 ADM CODE REFIT THE EAST DOOR IN THE 4th ROOM FROM EAST LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed4FMar 24, 2015PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed4FMar 24, 2015REFIT DOORS ETC. · EGRESSSECTION 27-2005 ADM CODE REFIT THE NORTH CLOSET DOOR IN THE FOYER LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed4FNov 26, 2014PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed1EAug 11, 2014REFIT DOORS ETC. · EGRESSSECTION 27-2005 ADM CODE REFIT .. IN THE ENTRANCE LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed1EJul 31, 2014PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Class AClosed3EMay 20, 2014PAINT METAL · PAINTINGSECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION DOOR AT SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed3EMay 20, 2014REFIT DOORS ETC. · EGRESSSECTION 27-2005 ADM CODE REFIT DOOR AT BASE CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed3EMay 20, 2014PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed3EMay 20, 2014REFIT DOORS ETC. · EGRESSSECTION 27-2005 ADM CODE REFIT DOOR AT BREAKER FUZE BOX IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed4MFeb 3, 2014REPAIR · MAINTENANCESECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC OUTLETS AT EAST WALL IN THE KITCHEN LOCATED AT APT 4M, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed2CDec 19, 2013REFIT DOORS ETC. · EGRESSSECTION 27-2005 ADM CODE REFIT DOOR IN THE ENTRANCE LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed2FNov 6, 2013PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed2KOct 10, 2013PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE BATHROOM , THE 3rd ROOM FROM EAST, THE PRIVATE HALLWAY LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed2KOct 10, 2013PAINT METAL · PAINTINGSECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DUMB WAITER FROM SOUTH AT WEST WALL, 1st RISER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed2KOct 10, 2013PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL, BASEBOARD AT EAST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed2KOct 10, 2013PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed2KOct 10, 2013PAINT METAL · PAINTINGSECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed—Aug 15, 2013PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT VSTIBULE VESTIBULE AT PUBLIC HALL, 1st STORY
    Class AClosed5EAug 2, 2013PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY , THE 1st ROOM FROM EAST, THE 4th ROOM FROM EAST, THE BATHROOM , THE KITCHEN LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed6GAug 2, 2013PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE KITCHEN , THE 4th ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST, THE BATHROOM , THE 3rd ROOM FROM EAST AT SOUTH, THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed2MJul 24, 2013PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS THROUGH OUT IN THE ENTIRE APARTMENT LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed2MJul 24, 2013REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT METAL DOOR IN THE ENTRANCE LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed3LJul 24, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, WALLS, DOORS AND TRIMS THROUGH OUT IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed—Jul 24, 2013PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE VESTIBULE , 1st STORY
    Class AClosed4KMay 28, 2013REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER WALL CABINETS AT EAST WALL IN THE KITCHEN LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed4KMay 28, 2013REPAIR · MAINTENANCESECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL STOPPER AT BATHTUB IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed4KMay 28, 2013PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER AT NORTH WALL IN THE KITCHEN LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed4KMay 28, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND EAST WALL IN THE KITCHEN LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed4KMay 28, 2013PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed4KMay 28, 2013REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW COUNTERBALANCE UPPER AND LOWER SASH AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed5EMay 23, 2013PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 4th ROOM FROM EAST, THE 1st ROOM FROM EAST, THE BATHROOM LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed5EMay 23, 2013REFIT DOORS ETC. · EGRESSSECTION 27-2005 ADM CODE REFIT LOWER SASH AT 2ND WINDOW FROM SOUTH AT WEST IN THE 1st ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed4GOct 11, 2012PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE FOYER , THE BATHROOM , THE KITCHEN , THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Nov 25, 2015Apt 2J
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    Nov 25, 2015Apt 4G
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHWEST
    Class AClosed
    Nov 25, 2015Apt 4G
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTHEAST
    Class AClosed
    Nov 25, 2015Apt 4G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTHEAST
    Class AClosed
    Nov 25, 2015Apt 4G
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed
    Nov 25, 2015Apt 4G
    RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed
    Sep 4, 2015Apt 4I
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE BATHROOM , THE FOYER LOCATED AT APT 4I, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 17, 2015Apt 1E
    REFIT DOORS ETC. · EGRESS
    SECTION 27-2005 ADM CODE REFIT THE UPPER SASH WEST WINDOW IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    May 21, 2015Apt 4G
    RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed
    May 21, 2015Apt 4G
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING, AND WALLS. IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed
    May 21, 2015Apt 4G
    REPAIR PLASTER · MAINTENANCE
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, AND WALLS. IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed
    May 21, 2015Apt 4G
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING. IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
    Class AClosed
    Apr 8, 2015Apt 4G
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT DOORS AND TRIMS IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 8, 2015Apt 4G
    REPAIR PLASTER · MAINTENANCE
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 1, 2015Apt 2E
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE PRIVATE HALLWAY , THE 1st ROOM FROM EAST, THE BATHROOM , THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Mar 30, 2015Apt 2E
    PAINT METAL · PAINTING
    SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 2E, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Mar 24, 2015Apt 4F
    REFIT DOORS ETC. · EGRESS
    SECTION 27-2005 ADM CODE REFIT THE EAST DOOR IN THE 4th ROOM FROM EAST LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Mar 24, 2015Apt 4F
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Mar 24, 2015Apt 4F
    REFIT DOORS ETC. · EGRESS
    SECTION 27-2005 ADM CODE REFIT THE NORTH CLOSET DOOR IN THE FOYER LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Nov 26, 2014Apt 4F
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Aug 11, 2014Apt 1E
    REFIT DOORS ETC. · EGRESS
    SECTION 27-2005 ADM CODE REFIT .. IN THE ENTRANCE LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jul 31, 2014Apt 1E
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Class AClosed
    May 20, 2014Apt 3E
    PAINT METAL · PAINTING
    SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION DOOR AT SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed
    May 20, 2014Apt 3E
    REFIT DOORS ETC. · EGRESS
    SECTION 27-2005 ADM CODE REFIT DOOR AT BASE CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed
    May 20, 2014Apt 3E
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed
    May 20, 2014Apt 3E
    REFIT DOORS ETC. · EGRESS
    SECTION 27-2005 ADM CODE REFIT DOOR AT BREAKER FUZE BOX IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Feb 3, 2014Apt 4M
    REPAIR · MAINTENANCE
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC OUTLETS AT EAST WALL IN THE KITCHEN LOCATED AT APT 4M, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed
    Dec 19, 2013Apt 2C
    REFIT DOORS ETC. · EGRESS
    SECTION 27-2005 ADM CODE REFIT DOOR IN THE ENTRANCE LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Nov 6, 2013Apt 2F
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Oct 10, 2013Apt 2K
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE BATHROOM , THE 3rd ROOM FROM EAST, THE PRIVATE HALLWAY LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    Oct 10, 2013Apt 2K
    PAINT METAL · PAINTING
    SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DUMB WAITER FROM SOUTH AT WEST WALL, 1st RISER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    Oct 10, 2013Apt 2K
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL, BASEBOARD AT EAST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    Oct 10, 2013Apt 2K
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    Oct 10, 2013Apt 2K
    PAINT METAL · PAINTING
    SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    Aug 15, 2013
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT VSTIBULE VESTIBULE AT PUBLIC HALL, 1st STORY
    Class AClosed
    Aug 2, 2013Apt 5E
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY , THE 1st ROOM FROM EAST, THE 4th ROOM FROM EAST, THE BATHROOM , THE KITCHEN LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Aug 2, 2013Apt 6G
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE KITCHEN , THE 4th ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST, THE BATHROOM , THE 3rd ROOM FROM EAST AT SOUTH, THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jul 24, 2013Apt 2M
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS THROUGH OUT IN THE ENTIRE APARTMENT LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 24, 2013Apt 2M
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT METAL DOOR IN THE ENTRANCE LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 24, 2013Apt 3L
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, WALLS, DOORS AND TRIMS THROUGH OUT IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 24, 2013
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE VESTIBULE , 1st STORY
    Class AClosed
    May 28, 2013Apt 4K
    REPAIR · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER WALL CABINETS AT EAST WALL IN THE KITCHEN LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    May 28, 2013Apt 4K
    REPAIR · MAINTENANCE
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL STOPPER AT BATHTUB IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    May 28, 2013Apt 4K
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER AT NORTH WALL IN THE KITCHEN LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    May 28, 2013Apt 4K
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND EAST WALL IN THE KITCHEN LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    May 28, 2013Apt 4K
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    May 28, 2013Apt 4K
    REPAIR · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW COUNTERBALANCE UPPER AND LOWER SASH AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    May 23, 2013Apt 5E
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 4th ROOM FROM EAST, THE 1st ROOM FROM EAST, THE BATHROOM LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed
    May 23, 2013Apt 5E
    REFIT DOORS ETC. · EGRESS
    SECTION 27-2005 ADM CODE REFIT LOWER SASH AT 2ND WINDOW FROM SOUTH AT WEST IN THE 1st ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Oct 11, 2012Apt 4G
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE FOYER , THE BATHROOM , THE KITCHEN , THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Page 3 of 5
    ← PrevNext →