stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

3250 PERRY AVENUE

Bronx · ZIP 10467 · BIN 2018348 · Norwood · Last violation Jul 13, 2026 · Last complaint Jun 27, 2026

NeighborhoodNorwood
Above-average violations for the neighborhood
More violations than 65% of buildings and more complaints than 71% of buildings in Norwood. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 61 violations · 77 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
2 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous2Class Bhazardous0

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests.
    Worth checking · AI-assistedⓘ
    Look in hallways, stairwells, and other shared areas for signs of pests or mold.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Dirty or poorly maintained common areas, garbage accumulation, and inadequate building cleaning services.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide) — violation classes
    • NYC HPD, Penalties and Fees
Housing Preservation & Development Violations
Total violations since 2002
370
15 per year avg.↓ Down 41% in the last 2 years (61 vs 104 prior 2 yrs)
Open violations
3
Class C (immed. haz.)ⓘ2
Class B (hazardous)ⓘ0
Rent-impairingⓘ0
Housing Preservation & Development Complaints
Total complaints since 2003
852
36 per year avg.↓ Down 33% in the last 2 years (77 vs 115 prior 2 yrs)
Complaint Resolution
No access15%Violation issued14%No violation21%Phone resolved50%Other0%(852)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ36 violations
Extermination & Rodent Eradicationⓘ29 violations
Egressⓘ28 violations
Heat And Hot Waterⓘ28 violations
Paintingⓘ24 violations
Lead-Based Paintⓘ10 violations
Cleaningⓘ10 violations
Carbon Monoxide Detecting Devicesⓘ8 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ131 complaints
Mold & pestsⓘ34 complaints
Water & plumbingⓘ21 complaints
Bldg maintenanceⓘ14 complaints
Safety & fireⓘ3 complaints
Electricalⓘ2 complaints
Hide violations ↑See complaints →

Violation log

68 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
— correction deadlines
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on a faucet in the kitchen and bathroom and feel whether hot water arrives, and check radiators or baseboards for warmth when the heat is on.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Open violation ages
    ▪ 30–90 days33% (1)
    ▪ 1–3 years33% (1)
    ▪ 3+ years33% (1)
    Prior 4 yr.
    Immed. Emergency0%2%
    Emergency71%70%
    Non-Emergency29%28%
    (21)
    (209)
    Issued
    Description
    Class AClosed6CApr 25, 2016REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT 1st CLOSET FROM WEST AT NORTH WALL CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed5BMay 27, 2015PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST
    Class AClosed6DJan 20, 2015PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM FROM NORTH AT WEST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
    Class AClosed6DJan 20, 2015PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE BATHROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
    Class AClosed—Jan 20, 2015PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE FIRE RETARDNT CEILINGS ALL SECTIONS AT PUBLIC HALL, 6th STORY
    Class AClosed—Jan 20, 2015PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE FIRE RETARDANT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION AT SOUTH
    Class AClosed—Jan 20, 2015PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE FIRE RETARDANT CEILING AND LL WALLS AT BULK HEAD AT PUBLIC HALL, 6th STORY, SECTION AT NORTH
    Class AClosed3CDec 1, 2014TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed—Jan 2, 2014REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT ENTRANCE DOOR TO BUILDING
    Class AClosed—Oct 25, 2013REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT BUILDING ENTRANCE DOOR , 1st STORY
    Class AClosed3BSep 3, 2013REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed3BSep 3, 2013REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES ON THE FLOOR IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed3BJul 22, 2013PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY , THE 4th ROOM FROM EAST, THE KITCHEN , THE BATHROOM , THE 1st ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed3BJul 22, 2013REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE 1ST AND 2ND CLOSET DOORS FROM EAST AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed3BJul 18, 2013REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed3BJul 18, 2013REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed5GDec 19, 2011REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed5GDec 19, 2011REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 25, 2016Apt 6C
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT 1st CLOSET FROM WEST AT NORTH WALL CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    May 27, 2015Apt 5B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jan 20, 2015Apt 6D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM FROM NORTH AT WEST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
    Class AClosed
    Jan 20, 2015Apt 6D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE BATHROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
    Class AClosed
    Jan 20, 2015
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE FIRE RETARDNT CEILINGS ALL SECTIONS AT PUBLIC HALL, 6th STORY
    Class AClosed
    Jan 20, 2015
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE FIRE RETARDANT CEILING AND ALL WALLS AT BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION AT SOUTH
    Class AClosed
    Jan 20, 2015
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE FIRE RETARDANT CEILING AND LL WALLS AT BULK HEAD AT PUBLIC HALL, 6th STORY, SECTION AT NORTH
    Class AClosed
    Dec 1, 2014Apt 3C
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jan 2, 2014
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT ENTRANCE DOOR TO BUILDING
    Class AClosed
    Oct 25, 2013
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT BUILDING ENTRANCE DOOR , 1st STORY
    Class AClosed
    Sep 3, 2013Apt 3B
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed
    Sep 3, 2013Apt 3B
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES ON THE FLOOR IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 22, 2013Apt 3B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY , THE 4th ROOM FROM EAST, THE KITCHEN , THE BATHROOM , THE 1st ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 22, 2013Apt 3B
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT THE 1ST AND 2ND CLOSET DOORS FROM EAST AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 18, 2013Apt 3B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 18, 2013Apt 3B
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed
    Dec 19, 2011Apt 5G
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Dec 19, 2011Apt 5G
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Page 2 of 2
    ← Prev