stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

3250 PERRY AVENUE

Bronx · ZIP 10467 · BIN 2018348 · Norwood · Last violation Jul 13, 2026 · Last complaint Jun 27, 2026

NeighborhoodNorwood
Above-average violations for the neighborhood
More violations than 65% of buildings and more complaints than 71% of buildings in Norwood. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 61 violations · 77 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
2 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous2Class Bhazardous0

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests.
    Worth checking · AI-assistedⓘ
    Look in hallways, stairwells, and other shared areas for signs of pests or mold.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Dirty or poorly maintained common areas, garbage accumulation, and inadequate building cleaning services.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide) — violation classes
    • NYC HPD, Penalties and Fees
Housing Preservation & Development Violations
Total violations since 2002
370
15 per year avg.↓ Down 41% in the last 2 years (61 vs 104 prior 2 yrs)
Open violations
3
Class C (immed. haz.)ⓘ2
Class B (hazardous)ⓘ0
Rent-impairingⓘ0
Housing Preservation & Development Complaints
Total complaints since 2003
852
36 per year avg.↓ Down 33% in the last 2 years (77 vs 115 prior 2 yrs)
Complaint Resolution
No access15%Violation issued14%No violation21%Phone resolved50%Other0%(852)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ36 violations
Extermination & Rodent Eradicationⓘ29 violations
Egressⓘ28 violations
Heat And Hot Waterⓘ28 violations
Paintingⓘ24 violations
Lead-Based Paintⓘ10 violations
Cleaningⓘ10 violations
Carbon Monoxide Detecting Devicesⓘ8 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ131 complaints
Mold & pestsⓘ34 complaints
Water & plumbingⓘ21 complaints
Bldg maintenanceⓘ14 complaints
Safety & fireⓘ3 complaints
Electricalⓘ2 complaints
Hide violations ↑See complaints →

Violation log

68 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
— correction deadlines
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on a faucet in the kitchen and bathroom and feel whether hot water arrives, and check radiators or baseboards for warmth when the heat is on.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Open violation ages
    ▪ 30–90 days33% (1)
    ▪ 1–3 years33% (1)
    ▪ 3+ years33% (1)
    Prior 4 yr.
    Immed. Emergency0%2%
    Emergency71%70%
    Non-Emergency29%28%
    (21)
    (209)
    Issued
    Description
    Class AOpen—Jul 13, 2026RENT STABILIZATION LAW INFORMATION SIGN · POSTING/SIGNAGE§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE
    Class AClosed—Oct 2, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING PUBLIC HALL (NORTH SECTION) , 3rd STORY
    Class AClosed3KAug 26, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed3KAug 26, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed6FApr 8, 2025REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK SET AND ASSEMBL6 AT EGRESS DOOR IN THE KITCHEN LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed—Sep 30, 2024REMOVE ACCUMULATION OR RUBBISH · CLEANING§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR AT PUBLIC HALL, 3rd STORY
    Class AClosed—Sep 30, 2024REMOVE ACCUMULATION OR RUBBISH · CLEANING§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR AT CELLAR
    Class AClosed—Sep 26, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT BASEMENT
    Class AClosed—Sep 9, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL ( SOUTH SECTION BULKHEAD ) 6TH STORY ROOF
    Class AClosed—Sep 9, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING ( NORTH SECTION PUBLIC HALLWAY BY UNIT 6K ) 6TH STORY
    Class AClosed—Sep 9, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING ( SOUTH SECTION) AT PUBLIC HALL, 6th STORY
    Class AClosed3BJul 25, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT LOWER WINDOW SASH IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed3BJul 25, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER WINDOW SASH IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed2FFeb 28, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed2FFeb 1, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE BATHROOM , THE 3rd ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed4AJan 2, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3 SQ FT AT EAST WALL OF WINDOW CASING IN THE 4th ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 4th APARTMENT FROM NORTH AT EAST
    Class AClosed2FDec 4, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM NORTH AT EAST WALL, EAST WALL, CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed2FDec 4, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed2FDec 4, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR, SOUTH WALL IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed2FDec 4, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM EAST AT SOUTH WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed2FDec 4, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed2FDec 4, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed2FDec 4, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed2FDec 4, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR, CEILING IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed2FDec 4, 2023FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SHEETROCK AND STUD PARTITION ERECTED FROM FLOOR TO CEILING WITH DOOR OBSTRUCTING NATURAL LIGHT AND VENTILATION IN THE 1st ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed3EOct 20, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQ FT AT CEILING AND 2 SQ FT AT EAST WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed—Feb 21, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 6th STORY
    Class AClosed—Feb 18, 2022FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Class AClosed4KJan 28, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed4KJan 28, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed4KDec 17, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed4KDec 17, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed—Nov 29, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 3rd STORY
    Class AClosed3ENov 29, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed5GNov 27, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE KITCHEN , THE 3rd ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST AT SOUTH, THE BATHROOM LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed5GJan 27, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed1DOct 16, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE 1st ROOM FROM NORTH AT EAST, THE 3rd ROOM FROM NORTH, THE FOYER , THE KITCHEN , THE 2nd BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed3ASep 13, 2018PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR COVER AND RADIATOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 3A, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosedRENT IMPAIRING5JAug 7, 2017LEAKY FLUSH PIPE CONNECTION · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION ... IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed4GAug 4, 2017PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed4GAug 4, 2017PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed—Jul 27, 2017PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION AT SOUTH
    Class AClosed—Jul 27, 2017PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION AT NORTH
    Class AClosed—Jun 23, 2017POST GAS LEAK NOTICE · POSTING/SIGNAGE§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT LOBBY, 1st STORY
    Class AClosed5JJan 20, 2017PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed6DJul 15, 2016PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed6DJul 15, 2016REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CONCEALED WATER LEAK AT SOUTH WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed6CApr 25, 2016PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM FROM EAST, THE 1st ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH, THE FOYER , THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed—Apr 25, 2016POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Class AClosed—Apr 25, 2016POST SMOKE DETECTOR NOTICE · POSTING/SIGNAGE§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX THAT MISSIMG AT PUBLIC HALL, 1st STORY
    Class AOpen
    Jul 13, 2026
    RENT STABILIZATION LAW INFORMATION SIGN · POSTING/SIGNAGE
    §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE
    Class AClosed
    Oct 2, 2025
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING PUBLIC HALL (NORTH SECTION) , 3rd STORY
    Class AClosed
    Aug 26, 2025Apt 3K
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Aug 26, 2025Apt 3K
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Apr 8, 2025Apt 6F
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK SET AND ASSEMBL6 AT EGRESS DOOR IN THE KITCHEN LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Sep 30, 2024
    REMOVE ACCUMULATION OR RUBBISH · CLEANING
    § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR AT PUBLIC HALL, 3rd STORY
    Class AClosed
    Sep 30, 2024
    REMOVE ACCUMULATION OR RUBBISH · CLEANING
    § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR AT CELLAR
    Class AClosed
    Sep 26, 2024
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT BASEMENT
    Class AClosed
    Sep 9, 2024
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL ( SOUTH SECTION BULKHEAD ) 6TH STORY ROOF
    Class AClosed
    Sep 9, 2024
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING ( NORTH SECTION PUBLIC HALLWAY BY UNIT 6K ) 6TH STORY
    Class AClosed
    Sep 9, 2024
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING ( SOUTH SECTION) AT PUBLIC HALL, 6th STORY
    Class AClosed
    Jul 25, 2024Apt 3B
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT LOWER WINDOW SASH IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed
    Jul 25, 2024Apt 3B
    REPAIR · MAINTENANCE
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER WINDOW SASH IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST
    Class AClosed
    Feb 28, 2024Apt 2F
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Feb 1, 2024Apt 2F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE BATHROOM , THE 3rd ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jan 2, 2024Apt 4A
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3 SQ FT AT EAST WALL OF WINDOW CASING IN THE 4th ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 4th APARTMENT FROM NORTH AT EAST
    Class AClosed
    Dec 4, 2023Apt 2F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM NORTH AT EAST WALL, EAST WALL, CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 4, 2023Apt 2F
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 4, 2023Apt 2F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR, SOUTH WALL IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 4, 2023Apt 2F
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM EAST AT SOUTH WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 4, 2023Apt 2F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 4, 2023Apt 2F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 4, 2023Apt 2F
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 4, 2023Apt 2F
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR, CEILING IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 4, 2023Apt 2F
    FILE PLANS OR RESTORE · ALTERATIONS
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SHEETROCK AND STUD PARTITION ERECTED FROM FLOOR TO CEILING WITH DOOR OBSTRUCTING NATURAL LIGHT AND VENTILATION IN THE 1st ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 20, 2023Apt 3E
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQ FT AT CEILING AND 2 SQ FT AT EAST WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Feb 21, 2023
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 6th STORY
    Class AClosed
    Feb 18, 2022
    FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Class AClosed
    Jan 28, 2022Apt 4K
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 28, 2022Apt 4K
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 17, 2021Apt 4K
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 17, 2021Apt 4K
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Nov 29, 2021
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 3rd STORY
    Class AClosed
    Nov 29, 2021Apt 3E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Nov 27, 2020Apt 5G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE KITCHEN , THE 3rd ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST AT SOUTH, THE BATHROOM LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jan 27, 2020Apt 5G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Oct 16, 2019Apt 1D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE 1st ROOM FROM NORTH AT EAST, THE 3rd ROOM FROM NORTH, THE FOYER , THE KITCHEN , THE 2nd BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Sep 13, 2018Apt 3A
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR COVER AND RADIATOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 3A, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosedRENT IMPAIRING
    Aug 7, 2017Apt 5J
    LEAKY FLUSH PIPE CONNECTION · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION ... IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Aug 4, 2017Apt 4G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Aug 4, 2017Apt 4G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jul 27, 2017
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION AT SOUTH
    Class AClosed
    Jul 27, 2017
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION AT NORTH
    Class AClosed
    Jun 23, 2017
    POST GAS LEAK NOTICE · POSTING/SIGNAGE
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT LOBBY, 1st STORY
    Class AClosed
    Jan 20, 2017Apt 5J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jul 15, 2016Apt 6D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jul 15, 2016Apt 6D
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CONCEALED WATER LEAK AT SOUTH WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Apr 25, 2016Apt 6C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM FROM EAST, THE 1st ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH, THE FOYER , THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
    Class AClosed
    Apr 25, 2016
    POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Class AClosed
    Apr 25, 2016
    POST SMOKE DETECTOR NOTICE · POSTING/SIGNAGE
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX THAT MISSIMG AT PUBLIC HALL, 1st STORY
    Page 1 of 2
    Next →