stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

215 EAST GUN HILL ROAD

Bronx · ZIP 10467 · BIN 2018266 · Norwood · Last violation Aug 10, 2026 · Last complaint Aug 7, 2026

NeighborhoodNorwood
More violations than 94% of nearby buildings
More violations than 94% of buildings and more complaints than 86% of buildings in Norwood. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 608 violations · 181 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
37 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous37Class Bhazardous41

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and fire safety.
    Worth checking · AI-assistedⓘ
    Look for droppings, live insects, or damage to walls, cabinets, and baseboards in the kitchen, bathroom, and under sinks. Check that apartment entry doors, stairwell doors, and fire escape access are all unlocked and open freely without obstruction.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Safety & fire — Blocked, unsafe, or inaccessible exits, hallways, stairs, or fire escape routes.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

Housing Preservation & Development Violations
Total violations since 2011
1,477
92 per year avg.↑ Up 61% in the last 2 years (608 vs 377 prior 2 yrs)
Open violations
106
Class C (immed. haz.)ⓘ37
Class B (hazardous)ⓘ41
Rent-impairingⓘ4
Housing Preservation & Development Complaints
Total complaints since 2003
1,111
46 per year avg.↓ Down 53% in the last 2 years (181 vs 386 prior 2 yrs)
Complaint Resolution
No access15%Violation issued16%No violation25%Phone resolved43%Other0%(1,111)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ276 violations
Paintingⓘ141 violations
Egressⓘ108 violations
Lead-Based Paintⓘ80 violations
Cleaningⓘ79 violations
Extermination & Rodent Eradicationⓘ71 violations
Heat Sensor Programⓘ66 violations
Carbon Monoxide Detecting Devicesⓘ59 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ349 complaints
Mold & pestsⓘ83 complaints
Water & plumbingⓘ77 complaints
Bldg maintenanceⓘ47 complaints
Safety & fireⓘ44 complaints
Appliancesⓘ28 complaints
Electricalⓘ18 complaints
Adminⓘ1 complaints
Hide violations ↑See complaints →

Violation log

330 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
  • NYC HPD, ABCs of Housing 2024 (Tenants' Guide) — violation classes
  • NYC HPD, Penalties and Fees — correction deadlines
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Lead-paint violations on record.
    Worth checking · AI-assistedⓘ
    Look for paint that is peeling, chipped, or cracked on interior walls, trim, windows, doors, and door frames.
    details ▸

    Buildings built before 1960 may still contain lead-based paint, which causes behavioral and learning problems in young children, who can swallow dust and paint chips from windowsills and floors.

    If a child under six lives with you, or spends 10 or more hours a week in your apartment, tell the owner in writing, which is what obliges them to inspect annually. Report peeling paint, and call 311 if it is not fixed or if repair work is raising dust that is not being contained.

    • NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
  • Open violation ages
    ▪ < 30 days19% (20)
    ▪ 30–90 days25% (27)
    ▪ 3–12 months44% (47)
    ▪ 1–3 years4% (4)
    ▪ 3+ years8% (8)
    Prior 4 yr.
    Immed. Emergency6%4%
    Emergency51%73%
    Non-Emergency43%23%
    (65)
    (632)
    Issued
    Description
    Class AOpen2KAug 3, 2026PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT AT RISER IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen2KAug 3, 2026REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen2KAug 3, 2026REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT WOOD DOOR IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen2KAug 3, 2026REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen2KAug 3, 2026REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen2KAug 3, 2026REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL AND NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen2KAug 3, 2026REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT WOOD DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen2KAug 3, 2026REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen2KAug 3, 2026REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL INSIDE THE CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen2KAug 3, 2026REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen2JJul 16, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE FOYER LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen2JJul 16, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen2JJul 16, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen2JJul 16, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE KITCHEN LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen2JJul 16, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen2JJul 16, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen2JJul 16, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen2JJul 16, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM SOUTH AT WEST WALL, 1st RISER FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen2JJul 16, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed6JJul 7, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT NORTH WALL IN THE FOYER LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed6JJul 7, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed—Jun 11, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AT PUBLIC HALL, 6th STORY, SECTION AT WEST
    Class AClosed6JJun 8, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE KITCHEN , THE BATHROOM , THE 4th ROOM FROM EAST LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed6JJun 8, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed6JJun 8, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT SOUTH WALL IN THE FOYER LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed2LApr 16, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE FOYER , THE 3rd ROOM FROM EAST, THE 1st ROOM FROM EAST AT NORTH, THE 2nd PRIVATE HALLWAY FROM EAST, THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 2L, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT WEST
    Class AClosed5MApr 15, 2026FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION OF WOOD PANELS AS DROP CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5M, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''WEST''
    Class AOpen—Apr 14, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL AT PUBLIC HALL, 6th STORY
    Class AClosed5KMar 10, 2026TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST
    Class AClosed1HMar 4, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen1DMar 3, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AOpen1DMar 3, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 2nd WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT CENTER LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AOpen3HFeb 25, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen3HFeb 25, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen3HFeb 25, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen3HFeb 25, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen3HFeb 25, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed2BFeb 24, 2026TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Class AClosedRENT IMPAIRING1RFeb 5, 2026LEAKY FLUSH PIPE CONNECTION · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION ... IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WEST
    Class AClosed1HJan 23, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH AT WEST, THE FOYER , THE 2nd PRIVATE HALLWAY FROM NORTH LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed1HJan 23, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st RISER FROM NORTH AT EAST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed1HJan 23, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed1DJan 20, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 2nd WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed1DJan 20, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 4th ROOM FROM NORTH AT EAST, THE PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed1DJan 20, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT CENTER LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed1DJan 20, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM NORTH AT EAST WALL, 1st RISER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed1DJan 20, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed2EJan 12, 2026PROVIDE · MAINTENANCE§ 27-2005 ADM CODE PROVIDE ESCUTCHEON PLATE AT STEAM RISER IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed3GJan 12, 2026RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed2EJan 12, 2026TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND EAST WALL LESS THAN 10 SQ FT IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Aug 3, 2026Apt 2K
    PAINT METAL · PAINTING
    § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT AT RISER IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Aug 3, 2026Apt 2K
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Aug 3, 2026Apt 2K
    REFIT DOORS ETC. · EGRESS
    § 27-2005 HMC: REFIT WOOD DOOR IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Aug 3, 2026Apt 2K
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Aug 3, 2026Apt 2K
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Aug 3, 2026Apt 2K
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL AND NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Aug 3, 2026Apt 2K
    REFIT DOORS ETC. · EGRESS
    § 27-2005 HMC: REFIT WOOD DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Aug 3, 2026Apt 2K
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Aug 3, 2026Apt 2K
    REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL INSIDE THE CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Aug 3, 2026Apt 2K
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AOpen
    Jul 16, 2026Apt 2J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE FOYER LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Jul 16, 2026Apt 2J
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Jul 16, 2026Apt 2J
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Jul 16, 2026Apt 2J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE KITCHEN LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Jul 16, 2026Apt 2J
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Jul 16, 2026Apt 2J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Jul 16, 2026Apt 2J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Jul 16, 2026Apt 2J
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM SOUTH AT WEST WALL, 1st RISER FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Jul 16, 2026Apt 2J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Jul 7, 2026Apt 6J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT NORTH WALL IN THE FOYER LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Jul 7, 2026Apt 6J
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Jun 11, 2026
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AT PUBLIC HALL, 6th STORY, SECTION AT WEST
    Class AClosed
    Jun 8, 2026Apt 6J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE KITCHEN , THE BATHROOM , THE 4th ROOM FROM EAST LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Jun 8, 2026Apt 6J
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Jun 8, 2026Apt 6J
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT SOUTH WALL IN THE FOYER LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Apr 16, 2026Apt 2L
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE FOYER , THE 3rd ROOM FROM EAST, THE 1st ROOM FROM EAST AT NORTH, THE 2nd PRIVATE HALLWAY FROM EAST, THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 2L, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT WEST
    Class AClosed
    Apr 15, 2026Apt 5M
    FILE PLANS OR RESTORE · ALTERATIONS
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION OF WOOD PANELS AS DROP CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5M, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''WEST''
    Class AOpen
    Apr 14, 2026
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL AT PUBLIC HALL, 6th STORY
    Class AClosed
    Mar 10, 2026Apt 5K
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST
    Class AClosed
    Mar 4, 2026Apt 1H
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Mar 3, 2026Apt 1D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AOpen
    Mar 3, 2026Apt 1D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 2nd WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT CENTER LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AOpen
    Feb 25, 2026Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Feb 25, 2026Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Feb 25, 2026Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Feb 25, 2026Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AOpen
    Feb 25, 2026Apt 3H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Feb 24, 2026Apt 2B
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Class AClosedRENT IMPAIRING
    Feb 5, 2026Apt 1R
    LEAKY FLUSH PIPE CONNECTION · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION ... IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WEST
    Class AClosed
    Jan 23, 2026Apt 1H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH AT WEST, THE FOYER , THE 2nd PRIVATE HALLWAY FROM NORTH LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Jan 23, 2026Apt 1H
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st RISER FROM NORTH AT EAST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Jan 23, 2026Apt 1H
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Jan 20, 2026Apt 1D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 2nd WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Jan 20, 2026Apt 1D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 4th ROOM FROM NORTH AT EAST, THE PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Jan 20, 2026Apt 1D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT CENTER LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Jan 20, 2026Apt 1D
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM NORTH AT EAST WALL, 1st RISER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Jan 20, 2026Apt 1D
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Jan 12, 2026Apt 2E
    PROVIDE · MAINTENANCE
    § 27-2005 ADM CODE PROVIDE ESCUTCHEON PLATE AT STEAM RISER IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jan 12, 2026Apt 3G
    RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jan 12, 2026Apt 2E
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND EAST WALL LESS THAN 10 SQ FT IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Page 1 of 7
    Next →