stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

222 BEDFORD PARK BOULEVARD

Bronx · ZIP 10458 · BIN 2017621 · Bedford Park · Last violation Nov 19, 2026 · Last complaint Nov 20, 2026

NeighborhoodBedford Park
More violations than 89% of nearby buildings
More violations than 89% of buildings and more complaints than 96% of buildings in Bedford Park. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 216 violations · 493 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
26 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous26Class Bhazardous58

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and building maintenance.
    Worth checking · AI-assistedⓘ
    Look for droppings, live insects, or nests in kitchen cabinets and under the sink. Check that kitchen vents, exhaust fans, and range hoods draw air when turned on.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Bldg maintenance — Kitchen safety, fixtures, appliances, ventilation, or sanitation related issues.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

    • ABCs of Housing
Housing Preservation & Development Violations
Total violations since 2005
869
40 per year avg.↓ Down 33% in the last 2 years (216 vs 322 prior 2 yrs)
Open violations
92
Class C (immed. haz.)ⓘ26
Class B (hazardous)ⓘ58
Rent-impairingⓘ9
Housing Preservation & Development Complaints
Total complaints since 2003
1,302
54 per year avg.↑ Up 85% in the last 2 years (493 vs 266 prior 2 yrs)
Complaint Resolution
No access23%Violation issued22%No violation25%Phone resolved26%Other4%(1,302)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ177 violations
Extermination & Rodent Eradicationⓘ60 violations
Cleaningⓘ60 violations
Paintingⓘ48 violations
Lead-Based Paintⓘ43 violations
Water Supplyⓘ38 violations
Egressⓘ33 violations
Heat And Hot Waterⓘ18 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ302 complaints
Bldg maintenanceⓘ145 complaints
Mold & pestsⓘ121 complaints
Water & plumbingⓘ79 complaints
Safety & fireⓘ45 complaints
Appliancesⓘ27 complaints
Electricalⓘ10 complaints
Outdoor / structuralⓘ1 complaints
Hide violations ↑See complaints →

Violation log

188 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt
See something wrong? File a complaint with 311
  • NYC HPD, Penalties and Fees
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • ABCs of Housing
  • Lead-paint violations on record.
    Worth checking · AI-assistedⓘ
    Look for paint that is peeling, chipped, or cracked on interior walls, trim, windows, doors, and door frames.
    details ▸

    Buildings built before 1960 may still contain lead-based paint, which causes behavioral and learning problems in young children, who can swallow dust and paint chips from windowsills and floors.

    If a child under six lives with you, or spends 10 or more hours a week in your apartment, tell the owner in writing, which is what obliges them to inspect annually. Report peeling paint, and call 311 if it is not fixed or if repair work is raising dust that is not being contained.

    • ABCs of Housing
  • Open violation ages
    ▪ < 30 days21% (17)
    ▪ 30–90 days18% (15)
    ▪ 3–12 months18% (15)
    ▪ 1–3 years41% (34)
    ▪ 3+ years1% (1)
    Prior 4 yr.
    Immed. Emergency2%3%
    Emergency57%63%
    Non-Emergency41%34%
    (228)
    (582)
    Issued
    Description
    Class AClosed1CJan 29, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE UNEVEN WOOD FLOOR IN THE FOYER LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed3AJan 22, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL AND THE EAST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed3AJan 22, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed3AJan 22, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE CEILING IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed3AJan 22, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THEEAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed3AJan 22, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE FOYER LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed3AJan 22, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE SOUTH WALL AND EAST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed3AJan 22, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed6GDec 27, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 4 SQ.FT. AROUND WINDOW CASING AT EAST WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
    Class AClosed6GDec 27, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 6 SQ.FT. AT EAST WALL, AT 2ND CLOSET IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
    Class AClosed6GDec 7, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RISER IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
    Class AClosed1AOct 10, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed1AOct 10, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL SHELF IN THE PRIVATE HALLWAY LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed1AOct 10, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed1BOct 4, 2023REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed1BOct 4, 2023REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL AND CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 1B, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed1BOct 4, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AND NORTH WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed1BOct 4, 2023REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed1CMay 3, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 6 SQ FT AT WEST WALL IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed1CMay 3, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPRX 6 SQ FT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed1CMay 3, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER IN THE 1st ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed5EFeb 24, 2023REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR HANDLE AT CLOSET (LOOSE) NEAR BATHROOM IN THE PRIVATE HALLWAY LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed5EFeb 24, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT WINDOW STOOL AT NORTH WALL (FLAKING PAINT) IN THE 3rd ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed1CJul 5, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed1BJul 5, 2022REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMAL GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed5EOct 15, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW STOOL IN THE 4th ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed5EOct 15, 2021REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SEALED SHUT IN THE 4th ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed5ESep 23, 2021PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION METAL WINDOW STOOL IN THE 3rd ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed5ESep 7, 2021PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT THE NORTH WINDOW FRAME IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed3GFeb 26, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed1CFeb 18, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed3DNov 27, 2020TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQ FT AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST
    Class AClosed3DNov 27, 2020TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQ FT AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST
    Class AClosed2HJul 24, 2019REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT BATHROOM DOOR IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed4KOct 30, 2018REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE IN THE 4th ROOM FROM NORTH LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed5EOct 3, 2018REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed6DFeb 21, 2018REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT DOOR SO TO OPEN AND CLOSE ADEQUATELY IN THE ENTRANCE LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed4GFeb 1, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM FROM NORTH, THE 1st ROOM FROM NORTH AT EAST, THE FOYER , THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed4GFeb 1, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL, 1st DOOR FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed4GFeb 1, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed4GJan 27, 2017REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Class AClosed4GDec 19, 2016REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed4GSep 15, 2016PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosedACJul 1, 2016PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN LOCATED AT APT AC, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosedACJul 1, 2016PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT AC, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosedACJul 1, 2016PAINT METAL · PAINTINGSECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT AC, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed4GFeb 29, 2016PAINT METAL · PAINTINGSECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Class AClosed4GJan 27, 2016PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH AT EAST, THE 3rd ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT EAST, THE KITCHEN , THE 2nd BATHROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Class AClosed4GJan 27, 2016PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 1st CLOSET FROM SOUTH AT WEST WALL DOOR IN THE FOYER LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Class AClosed4GJan 27, 2016PAINT METAL · PAINTINGSECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Class AClosed
    Jan 29, 2024Apt 1C
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE UNEVEN WOOD FLOOR IN THE FOYER LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jan 22, 2024Apt 3A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL AND THE EAST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 22, 2024Apt 3A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 22, 2024Apt 3A
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE CEILING IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 22, 2024Apt 3A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THEEAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 22, 2024Apt 3A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE FOYER LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 22, 2024Apt 3A
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE SOUTH WALL AND EAST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jan 22, 2024Apt 3A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Dec 27, 2023Apt 6G
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 4 SQ.FT. AROUND WINDOW CASING AT EAST WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 27, 2023Apt 6G
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 6 SQ.FT. AT EAST WALL, AT 2ND CLOSET IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
    Class AClosed
    Dec 7, 2023Apt 6G
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RISER IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 10, 2023Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Oct 10, 2023Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL SHELF IN THE PRIVATE HALLWAY LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Oct 10, 2023Apt 1A
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Class AClosed
    Oct 4, 2023Apt 1B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Oct 4, 2023Apt 1B
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL AND CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 1B, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Oct 4, 2023Apt 1B
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AND NORTH WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Oct 4, 2023Apt 1B
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH
    Class AClosed
    May 3, 2023Apt 1C
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 6 SQ FT AT WEST WALL IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    May 3, 2023Apt 1C
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPRX 6 SQ FT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    May 3, 2023Apt 1C
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER IN THE 1st ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Feb 24, 2023Apt 5E
    REPAIR · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR HANDLE AT CLOSET (LOOSE) NEAR BATHROOM IN THE PRIVATE HALLWAY LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 24, 2023Apt 5E
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT WINDOW STOOL AT NORTH WALL (FLAKING PAINT) IN THE 3rd ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jul 5, 2022Apt 1C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Jul 5, 2022Apt 1B
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMAL GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Oct 15, 2021Apt 5E
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW STOOL IN THE 4th ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Oct 15, 2021Apt 5E
    REPAIR · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SEALED SHUT IN THE 4th ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Sep 23, 2021Apt 5E
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION METAL WINDOW STOOL IN THE 3rd ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Sep 7, 2021Apt 5E
    PAINT METAL · PAINTING
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT THE NORTH WINDOW FRAME IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 26, 2021Apt 3G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 18, 2021Apt 1C
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Class AClosed
    Nov 27, 2020Apt 3D
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQ FT AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST
    Class AClosed
    Nov 27, 2020Apt 3D
    TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQ FT AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST
    Class AClosed
    Jul 24, 2019Apt 2H
    REPAIR · MAINTENANCE
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT BATHROOM DOOR IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Class AClosed
    Oct 30, 2018Apt 4K
    REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
    § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE IN THE 4th ROOM FROM NORTH LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
    Class AClosed
    Oct 3, 2018Apt 5E
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 21, 2018Apt 6D
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT DOOR SO TO OPEN AND CLOSE ADEQUATELY IN THE ENTRANCE LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 1, 2018Apt 4G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM FROM NORTH, THE 1st ROOM FROM NORTH AT EAST, THE FOYER , THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 1, 2018Apt 4G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL, 1st DOOR FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Feb 1, 2018Apt 4G
    PAINT · PAINTING
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jan 27, 2017Apt 4G
    REFIT DOORS ETC. · EGRESS
    § 27-2005 ADM CODE REFIT DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Class AClosed
    Dec 19, 2016Apt 4G
    REPAIR PLASTER · MAINTENANCE
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Sep 15, 2016Apt 4G
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Class AClosed
    Jul 1, 2016Apt AC
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN LOCATED AT APT AC, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jul 1, 2016Apt AC
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT AC, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Jul 1, 2016Apt AC
    PAINT METAL · PAINTING
    SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT AC, 1st APARTMENT FROM EAST AT SOUTH
    Class AClosed
    Feb 29, 2016Apt 4G
    PAINT METAL · PAINTING
    SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Class AClosed
    Jan 27, 2016Apt 4G
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH AT EAST, THE 3rd ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT EAST, THE KITCHEN , THE 2nd BATHROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Class AClosed
    Jan 27, 2016Apt 4G
    PAINT · PAINTING
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 1st CLOSET FROM SOUTH AT WEST WALL DOOR IN THE FOYER LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Class AClosed
    Jan 27, 2016Apt 4G
    PAINT METAL · PAINTING
    SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Page 3 of 4
    ← PrevNext →