38 ELLIOT PLACE
Bronx · ZIP 10452 · BIN 2008059 · Mount Eden-Claremont (West) · Last violation May 19, 2026 · Last complaint Jul 27, 2026
What to watch forⓘ
- Hazardous violations are open, including heat and hot water, and building maintenance.Worth checking · AI-assistedⓘFeel the radiators in each room to see if heat flows through them evenly. Look at walls, ceilings, and trim for cracks, water stains, or peeling paint.
details ▸
Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.
- Heat / hot water — Lack of heat, hot water, or heating system related issues affecting tenants.
- Bldg maintenance — General building repair, upkeep, and maintenance related housing code violations.
The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.
- NYC HPD, ABCs of Housing 2024 (Tenants' Guide)
Complaint log
0 complaints · Close