stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

4530 BROADWAY

Manhattan · ZIP 10040 · BIN 1064060 · Washington Heights (North) · Last violation Sep 29, 2026 · Last complaint Sep 10, 2026

NeighborhoodWashington Heights (North)
More violations than 88% of nearby buildings
More violations than 88% of buildings and more complaints than 93% of buildings in Washington Heights (North). Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
More activity recently than in past years
Last 2 yrs: 336 violations · 499 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
47 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous47Class Bhazardous33

What to watch forⓘ

  1. Hazardous violations are open, including mold and pests, and fire safety.
    Worth checking · AI-assistedⓘ
    Look for droppings, live insects, or damage to walls, cabinets, and baseboards in the kitchen, bathroom, and under sinks. Check that apartment entry doors, stairwell doors, and fire escape access are all unlocked and open freely without obstruction.
    details ▸

    Deadlines vary by condition: immediate for heat and hot water, 14 days for self-closing doors, 21 days for lead paint, window guards, mold, and mice, cockroaches or rats, and 24 hours for everything else. They run from the date the owner is served, and mark when civil penalties can be sought in Housing Court. They are not a promise the condition is fixed by then. If the owner does not fix it, HPD can send its own contractor and bill them.

    • —Mold & pests — Rodent, cockroach, bedbug, or other pest infestation and extermination related issues.
    • —Safety & fire — Blocked, unsafe, or inaccessible exits, hallways, stairs, or fire escape routes.

    The violation list below shows which conditions are open and when each was cited. If one in your own apartment is still unaddressed, call 311.

Housing Preservation & Development Violations
Total violations since 1995
475
15 per year avg.↑ Up 600% in the last 2 years (336 vs 48 prior 2 yrs)
Open violations
95
Class C (immed. haz.)ⓘ47
Class B (hazardous)ⓘ33
Rent-impairingⓘ4
Housing Preservation & Development Complaints
Total complaints since 2003
1,459
61 per year avg.↑ Up 494% in the last 2 years (499 vs 84 prior 2 yrs)
Complaint Resolution
No access21%Violation issued22%No violation39%Phone resolved18%Other0%(1,459)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ195 violations
Water Supplyⓘ45 violations
Extermination & Rodent Eradicationⓘ40 violations
Egressⓘ38 violations
Paintingⓘ31 violations
Sewers And Drainageⓘ13 violations
Cleaningⓘ11 violations
Smoke Detecting Devicesⓘ9 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ148 complaints
Water & plumbingⓘ123 complaints
Bldg maintenanceⓘ113 complaints
Mold & pestsⓘ73 complaints
Electricalⓘ38 complaints
Appliancesⓘ23 complaints
Safety & fireⓘ3 complaints
See violations →Hide complaints ↑

Complaint log

227 complaints · GENERAL

All categoriesPAINT/PLASTERGENERALPLUMBINGHEAT/HOT WATERELECTRICAllOpenClosed
Type
See something wrong? File a complaint with 311
  • ABCs of Housing
  • NYC HPD, Penalties and Fees
  • Heat or hot water problems reported in the last five years.
    Worth checking · AI-assistedⓘ
    Turn on hot water at the kitchen sink and bathroom sink and feel the water temperature after running for one minute.
    details ▸

    Heat is required October 1 through May 31: at least 68°F from 6am to 10pm when it is below 55°F outside, and 62°F overnight whatever the temperature outside. Hot water must be at least 120°F, 24 hours a day, all year.

    If your apartment is colder than that, file a complaint with 311 and keep the service request number so you can track it. Never use a gas oven or range for heat, which can produce dangerous levels of carbon monoxide.

    • ABCs of Housing
  • Lead-paint violations on record.
    Worth checking · AI-assistedⓘ
    Look for paint that is peeling, chipped, or cracked on interior walls, trim, windows, doors, and door frames.
    details ▸

    Buildings built before 1960 may still contain lead-based paint, which causes behavioral and learning problems in young children, who can swallow dust and paint chips from windowsills and floors.

    If a child under six lives with you, or spends 10 or more hours a week in your apartment, tell the owner in writing, which is what obliges them to inspect annually. Report peeling paint, and call 311 if it is not fixed or if repair work is raising dust that is not being contained.

    • ABCs of Housing
  • Open violation ages
    ▪ < 30 days26% (25)
    ▪ 30–90 days6% (6)
    ▪ 3–12 months44% (42)
    ▪ 1–3 years14% (13)
    ▪ 3+ years9% (9)
    Prior 4 yr.
    Immed. Emergency4%5%
    Emergency60%47%
    Non-Emergency37%48%
    (369)
    (244)
    Status
    Apt
    Received
    Category
    EmergencyClosed2ASep 30, 2010GENERAL · MOLDThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed1CApr 1, 2010GENERAL · FLOORThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed1CApr 1, 2010GENERAL · CABINETThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed1CApr 1, 2010GENERAL · CERAMIC-TILEThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed1CMar 25, 2010GENERAL · FLOORThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed1CMar 25, 2010GENERAL · CABINETThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed1CMar 25, 2010GENERAL · FLOORThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed1CMar 25, 2010GENERAL · MOLDThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed2DFeb 6, 2010GENERAL · WINDOWSThe Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed2NJan 15, 2010GENERAL · MOLDThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed6FOct 30, 2009GENERAL · DOORSThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed6FOct 30, 2009GENERAL · MOLDThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed6FSep 1, 2009GENERAL · WINDOWSThe Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed6FSep 1, 2009GENERAL · CABINETThe Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed6HAug 30, 2009GENERAL · MOLDThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed6HAug 30, 2009GENERAL · CERAMIC-TILEThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed6HAug 30, 2009GENERAL · WINDOWSThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed2NAug 7, 2009GENERAL · MOLDThe Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed5NAug 7, 2009GENERAL · WINDOWSThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed6KAug 7, 2009GENERAL · CABINETThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed6HAug 7, 2009GENERAL · CERAMIC-TILEThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed6HAug 7, 2009GENERAL · MOLDThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed2NAug 7, 2009GENERAL · FLOORThe Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed6HAug 7, 2009GENERAL · MOLDThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed5EAug 7, 2009GENERAL · WINDOWSThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed2NAug 7, 2009GENERAL · FLOORThe Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed5EAug 7, 2009GENERAL · DOORSThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed4CAug 7, 2009GENERAL · FLOORThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed4DAug 7, 2009GENERAL · CERAMIC-TILEThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed6KAug 7, 2009GENERAL · CABINETThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed3EAug 5, 2009GENERAL · FLOORThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed4LAug 5, 2009GENERAL · FLOORThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed3EAug 5, 2009GENERAL · WINDOWSThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed5HAug 5, 2009GENERAL · MOLDThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed2MAug 4, 2009GENERAL · WINDOWSThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed3CAug 4, 2009GENERAL · CABINETThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed3JAug 4, 2009GENERAL · FLOORThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed3JAug 4, 2009GENERAL · MOLDThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed2MAug 4, 2009GENERAL · CERAMIC-TILEThe Department of Housing Preservation and Development contacted an occupant of the apartment and verified that the following conditions were corrected. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed2MAug 4, 2009GENERAL · CERAMIC-TILEThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed2HAug 4, 2009GENERAL · WINDOWSThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed2MAug 4, 2009GENERAL · FLOORThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed2HAug 4, 2009GENERAL · WINDOWSThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed3CAug 4, 2009GENERAL · DOORSThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed2HAug 4, 2009GENERAL · CERAMIC-TILEThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed2DAug 3, 2009GENERAL · FIRE-ESCAPEThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed2DAug 3, 2009GENERAL · WINDOWSThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed1AAug 3, 2009GENERAL · MOLDThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed2DAug 3, 2009GENERAL · VENTILATION SYSTEMThe Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed1BAug 3, 2009GENERAL · CERAMIC-TILEThe Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed
    Sep 30, 2010Apt 2A
    GENERAL · MOLD
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed
    Apr 1, 2010Apt 1C
    GENERAL · FLOOR
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed
    Apr 1, 2010Apt 1C
    GENERAL · CABINET
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Apr 1, 2010Apt 1C
    GENERAL · CERAMIC-TILE
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed
    Mar 25, 2010Apt 1C
    GENERAL · FLOOR
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed
    Mar 25, 2010Apt 1C
    GENERAL · CABINET
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed
    Mar 25, 2010Apt 1C
    GENERAL · FLOOR
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Mar 25, 2010Apt 1C
    GENERAL · MOLD
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed
    Feb 6, 2010Apt 2D
    GENERAL · WINDOWS
    The Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed
    Jan 15, 2010Apt 2N
    GENERAL · MOLD
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed
    Oct 30, 2009Apt 6F
    GENERAL · DOORS
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Oct 30, 2009Apt 6F
    GENERAL · MOLD
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Sep 1, 2009Apt 6F
    GENERAL · WINDOWS
    The Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed
    Sep 1, 2009Apt 6F
    GENERAL · CABINET
    The Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed
    Aug 30, 2009Apt 6H
    GENERAL · MOLD
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 30, 2009Apt 6H
    GENERAL · CERAMIC-TILE
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 30, 2009Apt 6H
    GENERAL · WINDOWS
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 7, 2009Apt 2N
    GENERAL · MOLD
    The Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed
    Aug 7, 2009Apt 5N
    GENERAL · WINDOWS
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed
    Aug 7, 2009Apt 6K
    GENERAL · CABINET
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 7, 2009Apt 6H
    GENERAL · CERAMIC-TILE
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 7, 2009Apt 6H
    GENERAL · MOLD
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 7, 2009Apt 2N
    GENERAL · FLOOR
    The Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed
    Aug 7, 2009Apt 6H
    GENERAL · MOLD
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed
    Aug 7, 2009Apt 5E
    GENERAL · WINDOWS
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed
    Aug 7, 2009Apt 2N
    GENERAL · FLOOR
    The Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed
    Aug 7, 2009Apt 5E
    GENERAL · DOORS
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed
    Aug 7, 2009Apt 4C
    GENERAL · FLOOR
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 7, 2009Apt 4D
    GENERAL · CERAMIC-TILE
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed
    Aug 7, 2009Apt 6K
    GENERAL · CABINET
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 5, 2009Apt 3E
    GENERAL · FLOOR
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed
    Aug 5, 2009Apt 4L
    GENERAL · FLOOR
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed
    Aug 5, 2009Apt 3E
    GENERAL · WINDOWS
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed
    Aug 5, 2009Apt 5H
    GENERAL · MOLD
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed
    Aug 4, 2009Apt 2M
    GENERAL · WINDOWS
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed
    Aug 4, 2009Apt 3C
    GENERAL · CABINET
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed
    Aug 4, 2009Apt 3J
    GENERAL · FLOOR
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed
    Aug 4, 2009Apt 3J
    GENERAL · MOLD
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 4, 2009Apt 2M
    GENERAL · CERAMIC-TILE
    The Department of Housing Preservation and Development contacted an occupant of the apartment and verified that the following conditions were corrected. The complaint has been closed. If the condition still exists, please file a new complaint.
    EmergencyClosed
    Aug 4, 2009Apt 2M
    GENERAL · CERAMIC-TILE
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 4, 2009Apt 2H
    GENERAL · WINDOWS
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed
    Aug 4, 2009Apt 2M
    GENERAL · FLOOR
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 4, 2009Apt 2H
    GENERAL · WINDOWS
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed
    Aug 4, 2009Apt 3C
    GENERAL · DOORS
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed
    Aug 4, 2009Apt 2H
    GENERAL · CERAMIC-TILE
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    EmergencyClosed
    Aug 3, 2009Apt 2D
    GENERAL · FIRE-ESCAPE
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    Non-emergencyClosed
    Aug 3, 2009Apt 2D
    GENERAL · WINDOWS
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 3, 2009Apt 1A
    GENERAL · MOLD
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Non-emergencyClosed
    Aug 3, 2009Apt 2D
    GENERAL · VENTILATION SYSTEM
    The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
    EmergencyClosed
    Aug 3, 2009Apt 1B
    GENERAL · CERAMIC-TILE
    The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd
    Page 2 of 5
    ← PrevNext →