Class AClosed
Jun 20, 2024Apt 4A
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW SASH FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
May 24, 2024Apt 4A
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL, NORTH WALL IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
May 1, 2024
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT MAILBOX FOR APARTMENT 2F AT PUBLIC HALL, 1st STORY
Class AClosed
Apr 30, 2024Apt 2G
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 8 SQ.FT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Apr 30, 2024Apt 3F
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Apr 30, 2024Apt 2F
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM/ BELL BUZZER SYSTEM TO BUILDING ENTRANCE DOOR IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Apr 30, 2024Apt 2F
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WALLS IN THE 6th ROOM FROM EAST AT SOUTH LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Apr 30, 2024Apt 2G
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Apr 30, 2024
CLEANSE · CLEANING
§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE STAIRS, LANDINGS AND RAILINGS ALL STORIES AT PUBLIC HALL
Class AOpen
Apr 30, 2024Apt 3A
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
Apr 30, 2024
POST SIGN INDICATING NAME AND ADDRESS OF JANITOR, ETC. · POSTING/SIGNAGE
§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
Class AClosed
Apr 30, 2024Apt 3F
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AOpen
Apr 11, 2024Apt 4D
FILE PLANS OR RESTORE · ALTERATIONS
§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DUMBWAITER BEING USED AS A PANTRY STORAGE AT WEST WALL IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Apr 10, 2024
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL AT PUBLIC HALL STAIRS, 5th STORY
Class AClosed
Apr 10, 2024
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, NORTH, SOUTH AND WEST WALLS AT BULKHEAD
Class AClosed
Apr 10, 2024Apt 2B
REFIT DOORS ETC. · EGRESS
§ 27-2005 HMC: REFIT AT CLOSET DOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Apr 10, 2024
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 6th STORY
Class AClosed
Apr 10, 2024Apt 4A
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHUB IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed
Mar 8, 2024Apt 4D
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Mar 4, 2024Apt 4D
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX- 2 SQ,FT AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Mar 4, 2024Apt 4D
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX-4 SQ,FT AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Feb 5, 2024Apt 2C
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, WEST WALL, EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 5, 2024Apt 2C
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 5, 2024Apt 2C
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 5, 2024Apt 2C
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 5, 2024Apt 2C
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 5, 2024Apt 2C
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 5, 2024Apt 2C
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... (APPROXIMATELY 8 SQ.FT) AT 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 5, 2024Apt 2C
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 5, 2024Apt 2C
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT EAST WALL, SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, NORTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 1, 2024Apt 4F
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH NORTH WINDOW IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Feb 1, 2024Apt 4F
REPAIR · MAINTENANCE
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH NORTH 1 WINDOW IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
Jan 25, 2024Apt 4D
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 8 SQ FT AT SOUTH WALL, WEST WALL, AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jan 22, 2024Apt 4D
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQ FT AT WEST WALL AND 2 SQ FT AT SOUTH WALL. IN THE 1st ROOM FROM NORTH LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jan 22, 2024Apt 4D
REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jan 15, 2024Apt 2C
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND EAST, WEST, NORTH, AND SOUTH WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Nov 16, 2023Apt 6G
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Nov 8, 2023
CLEANSE · CLEANING
§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE NEEDLES AND DEBRIS AT 2ND STORY ROOF , 2nd STORY
Class AClosed
Nov 8, 2023
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT PUBLIC HALL, 6th STORY
Class AClosed
Nov 2, 2023Apt 5D
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ FTS ON NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Nov 2, 2023Apt 5D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Nov 2, 2023Apt 5D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Nov 2, 2023Apt 5D
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQ FTS ON NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Oct 4, 2023Apt 4D
PAINT METAL · PAINTING
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
May 16, 2023Apt 5F
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AT APPROXIAMATELY 4 SQUARE FEET IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
May 16, 2023Apt 5F
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed
May 15, 2023Apt 6B
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WEST WALL APPROXIAMATELY 8 SQUARE FEET IN THE 8th ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
May 15, 2023Apt 6B
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 7th ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Mar 15, 2023
FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Class AClosed
Mar 13, 2023
CLEANSE · CLEANING
§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOORS LANDINGS AND STAIRS AT ALL STORIES AT PUBLIC HALL